ACE: Release and MultiModal Manifest - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

ACE: Release and MultiModal Manifest

Description:

TSN Release Committee. Automate Manual Processes. Electronic Cancellations and Deletions ... TSN Release Committee. Streamline Current Processes. Corrections ... – PowerPoint PPT presentation

Number of Views:68
Avg rating:3.0/5.0
Slides: 11
Provided by: cindy45
Category:

less

Transcript and Presenter's Notes

Title: ACE: Release and MultiModal Manifest


1
ACE Release and Multi-Modal Manifest
  • Cindy Allen

Your Worldwide Logistics Partner
2
Multi Modal Manifest (MMM)
  • Two Shops at CBP
  • Cargo Summary
  • Cargo Control and Release (CCR)
  • CCR
  • AMS Vessel
  • AMS Air
  • AMS Rail
  • Concept of MMM

3
MMM Schedule
  • M1 Vessel and Rail Manifest
  • Scheduled for October 2008
  • Testing begins May 2008
  • First Direct Trade Interaction with ACE
  • M2.1 Air Manifest
  • Estimated in Q2 2009
  • M2.2 Full MMM
  • Estimated in Q4 2009
  • M2.3 Cargo Release
  • Estimated in Q2 2010

4
MMM M1 Highlights
  • Vessel Stowage Plan
  • POA Validation Process for In-Bond
  • Expands Broker Download to Vessel
  • CBP Holds/Hold Removal at the Container Level
  • Provide PGA with Hold/Hold Removal Functionality
  • Reporting Information to ACE Portal

5
MMM Future Releases
  • Expand Broker Download to Air
  • Seamless In-Bond Across Sea-Air-Rail
  • Holds at Master, House, Sub-House Level
  • Electronic Transfer of Liability
  • Bring Truck Manifest into ACE-AMS
  • Enhance CBP Inspector and PGA Reporting Tools

6
M2.3 Cargo Release - CBP
  • Bring New PGAs into ACE Cargo Release
  • Give PGAs expanded Functionality
  • Expanded BOL Fields
  • Attach Electronic File to Release
  • Respond with Electronic Files to CBP Requests
  • Data Process Streamline Across Modes
  • Termination of ACS for CCR

7
TSN Release Committee
  • Automate Manual Processes
  • Electronic Cancellations and Deletions
  • Electronic Entry Port Code Changes
  • In Port In-Bond Liability Closure
  • Document Required Requests
  • Export Exam Notification Process

8
TSN Release Committee
  • Streamline Current Processes
  • Corrections while in Selectivity Status
  • 5106 Validation at time of Release
  • Enhanced BOL Update
  • OGA Timing Refined
  • PGA Product Code Format Consistent
  • CBPF3461 Reconfiguration

9
TSN Release Committee
  • Informational Sharing
  • Contact Information Transmitted
  • Pre-Review Notification at Time of Send
  • Port Event Warning Messages
  • ABI Manifest Query for All Modes

10
ACE Release and Multi-Modal Manifest
  • Cindy Allen

Your Worldwide Logistics Partner
Write a Comment
User Comments (0)
About PowerShow.com