Title: Budget Presentation


1
Physical Plant Department Organizational Needs
Presentation Sal Chiarelli, Director of Physical
Plant March 14, 2007
2
Physical Plant Department268 Full and Part Time
Employees
  • Heat Plant (11)
  • HVAC (14)
  • Controls (5)
  • Plumbing (13)
  • Electric shop (11)
  • CPR Shop (18)
  • Custodial (106)
  • Davis (1)
  • Events (8)
  • TCO Asbestos/Lead (10)
  • Automotive (3)
  • Medical Complex (15)
  • Recycling Sol. Waste (6)
  • Administration (12)
  • Energy Management (1)
  • Service Ops. (2)
  • Material Mangmnt (3)
  • Grounds/Moving (16)
  • Project Management (2)
  • Med. Complex Proj. (6)
  • Trinity (5)

3
(No Transcript)
4
Mission
  • To maintain facilities, perform related services
    and provide responsible stewardship of the
    University of Vermonts physical assets in
    support of the Universitys mission.
  • Vision
  • To be a highly effective facilities organization
    through
  • Continuous improvement and innovation
  • Maximizing resources
  • Encouraging employee growth and job satisfaction
  • Promoting the values of UVMs Common Ground and
    supporting the needs of the Campus Community

5
Functional Areas Of Responsibility
Chart functional areas 7_05111.jpg
6
Some Current Physical Plant Issues And
Challenges.
  • Deferred Maintenance
  • Longer hours of operation 24/7
  • More events/set ups
  • Research requires less tolerance for down time
  • Energy efficiency/Global Warming
  • Higher than average turnover
  • Limited maintenance space
  • New codes/regulatory requirements
  • Operating dollar increase not keeping pace with
    market
  • Significantly less management of the Physical
    Plant as a result of cuts
  • Greater liability for not getting it done
  • Facilities more technically complex
  • Tight labor pool in Burlington Vermont Area

7
What Else Is Makes our Job Challenging
  • More Research facilities
  • All spaces open to all people
  • Eating/drinking in all spaces appear to be a
    status quo
  • More access to food and drink all over campus
  • More utilization of space
  • Everyone wants Air Conditioning
  • There is a general feeling that all services
    should be free
  • Buildings are getting older/
  • Competing for one pot of dollars against other
    important projects
  • Limited IT resources in AFS
  • Whats chargeable and what is not

8
Why Do We Need To Adjust Our Staffing
  • Provide Excellent Service
  • Service Level Expectation (see chart)
  • No identified internal engineering resource
  • Utility system becoming more complex and critical
  • Keep newer buildings operating efficiently
  • Keep research activities running
  • Provide a safe environment
  • Do More preventive maintenance
  • Do More predictive maintenance
  • Utilize systems that we have invested in
  • Keep up with work requests
  • Studies indicate that we are under resourced
  • Desire to move into more zone maintenance

9
Some Regulatory/Code Issues That Have Forced
Change
  • ADA
  • Elevator
  • Life Safety
  • Carbon Monoxide
  • Historical Preservation
  • Asbestos Abatement
  • Lead
  • Mold/Fungi
  • Pesticide Application
  • Energy Codes
  • Backflow prevention
  • Spill Prevention
  • Underground Storage Tank
  • Asbestos Awareness
  • Blood borne Pathogens
  • Radiation Safety
  • Personal Equipment Protection
  • ADA
  • FMLA
  • Confined Space
  • Lock-Out Tag-Out
  • Right To Know (Haz Com)
  • Fall Protection
  • Respiratory Protection

10
Some Required Departmental Licensing/Certification
s
  • Refrigerant Processing
  • Lead Inspector
  • Lead Contractor Entity
  • Asbestos Inspector
  • CDL Driving
  • Fuel Oil Installer
  • Operating Engineer
  • Pesticide
  • Asbestos Project Designer
  • Asbestos Entity
  • Asbestos Project Monitor
  • Engineer in Training
  • Fire Safety Technician
  • Others
  • Back Flow Prevention
  • Electrical Joureyman
  • Electrical Master
  • Electrical Apprentice
  • Plumber Apprentice
  • Plumber Master
  • Plumber Journeyman
  • Natural Gas Certification
  • Air Cond/Refrigeration
  • Fire Alarm T-1
  • Fire Alarm TQP
  • Professional Engineer

11
Some Maintenance Definitions
  • PM- I like to call it Preventive Measures which
    include
  • Inspections Roof inspection
  • Predictive maintenance- Bearing signature
    analysis
  • Preventive maintenance-Change the belts
  • Testing- Strap on flow meter
  • Analysis -Trending
  • Corrective maintenance
  • Work performed without a customer request
  • Work performed as a result of issues reported
    from PM findings
  • Initiated by maintenance organization
  • Reactive maintenance- unplanned and are a
    response to campus needs
  • Minor problems
  • Hot/cold calls
  • Service calls
  • Favors
  • Everyones lack of planning
  • Vandalism repairs..
  • Support of contractor/project needs (mostly
    unplanned)

12
Service Levels
  • Showplace 1
  • Comprehensive stewardship 2
  • Managed care 3
  • Reactive management 4
  • Crisis response 5

13
Where Are We In This Picture
  • We believe we are in the managed care catagort in
    many facilities.
  • Some buildings a re higher and some lower
  • We would like to be in the comprehensive
    stewardship range as a stretch goal

14
Spending Less but Getting More Solid PM Spending
Given the Below Average Facilities Budget
Sightlines Database Average 6.70 /GSF
Sightlines Database Average 6.70/GSF University
Of Vermont Approximately 5 Million Gross Square
Feet
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
  • Advantages
  • Streamline project schedule
  • Concentrate on DM and Energy
  • Work with department heads to prioritize
  • Consistent approach

19
  • Advantages
  • Adapt to growing campus needs
  • Concentrate on T C issues
  • Better reporting
  • Training enhancements

20
  • Advantages
  • Ownership
  • Accountability
  • Morale
  • Less travel
  • Less vehicles

21
  • Advantages
  • Support zones
  • Perform University wide tasks
  • Specialize work
  • Licenses

22
  • Advantages
  • Currently no engineering team
  • Proactive approach
  • Efficient operation
  • Sophisticated buildings
  • Support field needs
  • Analytical capabilities

23
  • Advantages
  • Adapt to growing campus
  • More analysis of data
  • Support organizational structure

24
(No Transcript)
25
What We Would Need To Accomplish This
  • Increase funding to levels of peer averages as
    indicated by Sightlines
  • Approximately 1.30 per square foot
  • Develop goals to obtain and sustain a level 2
    comprehensive stewardship model for most
    facilities

26
What Would The Timeframe Be
  • Over the next five years gradually increase
    funding levels to strategically populate
    organizational structure. This includes
    additional resources needed to accommodate Plant
    Sciences and new Central Chilled Water system.
  • Strive to have desired resource level to maintain
    a Comprehensive Stewardship Level of service.
  • Use current strategic plan as opportunities for
    planning resources.

27
What Would Be Some Of The Expected Results
  • Decrease rate of Deferred Maintenance
  • Higher morale
  • Better Customer Service
  • Less equipment downtime
  • Less travel time
  • Fewer service vehicles
  • Higher levels of Preventive Measures
  • More off shift coverage
  • Higher levels of accountability
  • Increase in service level
  • Less turnover
  • Greater interest