Title: MAPS for Nutrient Management Plans
1MAPSforNutrient Management Plans
- By Julia W. Gaskin, UGA - Bio Ag Engineering
Vernon Jones, NRCS (retired)
Presented by Thomas Bass, UGA - Bio and Ag
Engineering May 10, 2005 Macon, GA
Cooperative Extension Service, University of
Georgia Pollution Prevention Assistance
Division, GA-DNR
2Objective
- Prepare maps needed for CNMP
- Location map (optional)
- Soils map (optional)
- Farm map (required)
3 Location Map
- Computer road maps
- Photocopy road map
- Add arrow and dot to mark farm location
- Add North arrow
- Add title - Location Map at bottom
- Scale
4Soils Map
Joe Blow Farm
N
1 inch 900 ft
Soils Map - Joe Blow Farm
5Farm Map
- Information required
- Farm property lines
- Land use - cropland, pasture, etc
- Field boundaries
- Unique field identifiers
- Surface water features
- Arrows showing water flow direction
- Buffers or setbacks
6Farm Map
- Information required (cont.)
- Well locations
- Residences or public gathering places
- Road names
- North arrow
- Date prepared
- Legend
- Bar scale
- Probably off of farm property
7Information Sources
- FSA maps
- Aerial photos
- Internet -
- http//terraserver.microsoft.com - free
- http//www.gis.state.ga.us - fee based
- NRCS Toolkit
8 NRCS Toolkit Map
9Creating a Base Map
- Obtain FSA map
- Put a 1-inch
bar scale on map
before photocopy
10Creating a Base Map
11Calculating Spreadable Acreage
- Mark buffers on map
- Use dot grid, planimeter, etc to measure
- Subtract from total acres in field
- NRCS Toolkit
12Spreadable Acres
- Surface flow directions
- Concentrated flow areas
- Filter strips
- Frequently flooded soils
- Riparian forested buffers
- Setbacks
- Property line
- Houses or public areas
- Well
- Road
- Phosphorus Index
- Irrigation patterns
13Field 2 48 ac.
Property Line
Field 1 10 ac.
W
County Road
Example from Dr. Ted Tyson, Auburn U.
14 Frequently flooded soils
Perennial Stream
Field 2 48 ac.
Pond
Property Line
Ditch
Intermittent Stream
Woods
AFO
Field 1 10 ac.
Farmstead
Grassed Waterway
Neighbors House
W
County Road
15Field 2 48 ac.
Property Line
Field 1 (Pasture) 10 ac.
W
County Road
Broiler Operation
16Field 2
Property Line
Filter strip
Field 1 (Hay) 10 ac. 8.1 ac.
W
50 Setback
Broiler Operation
25 Setback
17Field 2
Property Line
Field 1 (Crop) 10 ac. 7.3 ac.
W
County Road
Broiler Operation
1825 ft. setback
Field 2 (Pasture) 48 ac. 39.5 ac.
Property Line
Field 1
W
County Road
Broiler Operation
50 ft. Setback
19Field 2 (Crop) 48 ac. 38.5 ac.
Property Line
Field 1
W
County Road
Broiler Operation
20Field 2 48 ac.
Property Line
Field 1 10 ac.
W
County Road
Swine Operation
21Field 2 (Hay) 48 ac. 20 ac.
Property Line
Field 1
W
County Road
Swine Operation
22Summary
- Farm map is required
- Has to be scaled to calculate spreadable acres
- NRCS Toolkit provide maps
- Base map from FSA or internet
- preparer adds required information
23Buffer Review Manure App.
- Required (GA) - New large operations only (new
regs may extend coverage of 35/100 ft rule to
additional operations, 2003) - 35 ft vegetated or 100 ft from surface water,
wet areas and ditches - 100 ft from wells
- Recommended
- 35 ft from ponds, sinkholes and wetlands
- 25 ft from property lines
- 50 ft from public road (situational)
- See FarmASyst 1152-3 Improving Drinking Water
for the Rural Resident for additional well
setback recommendations.
24Agricultural Pollution Prevention
Bio Ag Engineering UGA P2AD of GA DNR