Title: IS 3315: Manufacturing Systems
1IS 3315 Manufacturing Systems
- Part 1 The organisation of Manufacturing firms
- Understand the basic business processes
- understand the basic flows of information
- know the basic systems / sub systems implemented
- understand their linkages
2Basic business processes
Designing
Building
Selling
Buying
Processing orders
Getting paid
Paying
1 Arrange these in sequence 2 name proper
departments
3Basic flows of information
- Organisations are organised in a number of
functional areas - They collect and organise data to support their
complementary missions - they interact and collaborate in managing the
organisation
4Examples
- Finance managing the cash flows, providing
resources to the firm - Marketing promoting the firm and its products
- Sales selling the products dealing with
customers - Production manufacture goods
- These are broken down further into sub areas
- Name some of these sub areas
5Collaboration / Conflict between areas
- All areas of the firm must exchange info with the
others (just like organisations must interact
with the outside) - divergence of viewpoints means there are
opportunities for conflict - managing same resources / using the same assets
but with radically different goals - Describe situations involving these conflicts
6Examples
- Quality control versus production
- Procurement versus production
- Dealing with customer returns
- Sales and accounting
- Explain the underlying cause of these conflicts
7Manufacturing Organisations
- Business Processes more complex
- Lead time must be built into process of planning
for demand - Scheduling of resource use is more complex
- productivity is a composite indicator which
measures many operators work together - the definition of productivity / the way it is
measured affects the results
8Illustration
9Collaboration and Information
- Functional areas cannot collaborate if no
information circulates - first stage people talk to one another
- then exchange of documents
- then develop integrated systems shared by several
functional areas / the whole firm - This requires the existence of common definitions
and reliable / undisputed sources of data - Also people must have incentives to collaborate
10Reliable Common Grammar Examples
- Sales statistics
- as per customer orders?
- Goods sent?
- what feed back time?
- Production figures
- after rejects
- adjusted for loss / destruction in finished goods
storage - business analysts must talk to everyone to ensure
existence of reliable common methods
11Reliable / Undisputed sources of data
- Reliable mechanisms for data collection
- No room for controversy RE basic figures of the
business - Robust externally oriented systems for invoicing
/ paying - Robust measures of individual / area performance
for the purpose of assessment and rewarding - Reliable systems for storage / processing /
retrieval of data - Archiving
12Corresponding Information Systems
- The basic sub-systems are (see diagram)
- payroll
- order entry
- inventory (goods for sales, raw material...)
- shipping
- accounts receivable
- purchasing
- receiving
- accounts payable
- general ledger
- Describe each sub-systems missions
13Part 2 Resources and constraints in
Manufacturing environments
- Goods are manufactured, not purchased
- Demand must be counted or planned
- Need RECIPES
- activity must be planned for in advance
- Resources must be allocated in advance
- raw materials
- Machine time
- competent personnel (shift work)
limiting / constraining factors
14Organisational Model
- Driven by sales?
- Driven by production?
- Driven by marketing?
- History of organisation and power structure
determine which model is used - Plan dictates what volumes must be produced
- Everything else follows from there
Product matrix
15Recipe or formula
- How to produce our products
- List of components including possible substitutes
- How much of each
- Special conditions of operation
- Expected yields and labour productivity (i.e.
standards) - Extrapolate a cost per unit
- Stored in a Bill of Material (BOM)
16Example Bill of Material for desk
1 List out the components 2 describe the
steps required for assembly 3 arrange them in a
possible manufacturing sequence
17Solution
Desk
Top (1)
Adjustable legs (4)
Screw Kit (1)
Frame (1)
Painted metal legs (4)
Painted tubing (4)
3 way junctions (4)
Leg Tubes (4)
Paint (0.6 dl)
Long Tubes (2)
Paint (1 dl)
Short Tubes (2)
18Capacity
- Have limited capacity
- Each unit of product requires a set time for each
operation - Planning for capacity means analysing the
requirement of all production runs for all
products on all machines - Also, machines must be manned by operators
- and machines have down time
19Scheduling Manufacturing Tasks
- Based on desired production
- determine quantities of RM to commit
- schedule production runs (including
sub-assemblies) - line up workers to operate the machines
- Purchase required supplies
- This is called the Master Schedule
20Master schedule
- Issue for each week / day of production
- aims at meeting the plan or the customers orders
- allocate resources to all required activities
- meeting of the key production people (end of week
or Monday mornings). - Also review the problems with previous runs
- Some computer systems are required for these tasks
21Part 3 Data collection in the Factory
- Computer Integrated Manufacturing (CIM)
environments requires that companies - Know what they are doing
- availability of data and quality of that data are
key elements - many different types of data must be collected
- procedures must be put in place
- reliable
- but not intrusive
22Types of data
- Volume data (production)
- consumption data (raw material, packaging)
- personnel data
- maintenance data
- time related measurements
- productivity data
- All form the basis of the calculations used to
monitor manufacturing activities
23Type of data (2)
- Primary data
- Secondary data or calculated data
- High level data
24Data for monitoring activities
- Norm or budget is put together
- the more complete the model the more complete the
monitoring - measurement methods and procedures are also put
together - the structure of the budget tells you what data
to collect
25Data acquisition
- Manual recording in a docket or other form (e.g.
down time) - Sampling / testing of RM or products
- collection and count of key part (e.g. shoulder
blade) - scales for weight measurement- computerised or
not - direct data entry in computer with infra-red beam
(scanning) device (e.g. Dell) - remote electronic tracking
- All these involve a trade-off between cost and
accuracy and intrusiveness
26Bad data recording
- No data!
- Too costly - e.g. in equipment or time
- not timely feed back too slow
- inaccurate (e.g. procedure not well designed)
- Lack of operator training / understanding
- wrong incentive / instructions given
- lack of control - open to dishonesty
27Data storage
- Series of ad-hoc systems manual and
computer-based (spreadsheet, filed forms) - Dedicated databases for manufacturing data (QC,
shipping etc) - Process Control Systems (technical parameters)
- Other specialised proprietary systems
- Entreprise Resource Planning (ERP) system
28Using Manufacturing data
- Operational data
- volumes - schedule / re-schedule runs
- labour report - line up workers for next days
- quality of output
- Tactical data
- defect rates
- productivity
- Quality of RM
- Strategic data
- product mix information
- Market research
- turnover of staff
Some soft information is also required
29Soft information
- Data collection -
- Grapevine
- factory tours (talking and observing)
- Data storage -
- managers minds
- special reports
- Data usage
- ad-hoc basis
- decision making
30Part 4 Developing the Dashboard of information
- Information cost
- Information overload
- Not all data can be / should be provided
- Push versus pull model
- For operational data dashboard approach
- Concept of control room
- Analogy with process control or driving a car
- Focus on most important factors
31CSF - Theory
- Definition
- Limited number of areas where satisfactory
results will ensure successful competitive
performance for the individual, the department or
the firm - Monitored on the basis of a set of measures -
specific standards that allow the calibration of
performance - Measures can be soft or hard - ie objective or
subjective
32CSF method diagram
- Identification of a hierarchy of performance
measures that lead to identification of Critical
Factors and Issues that will determine a
business success
The business mission statement
The business vision statement
multiple business goals
multiple business objectives for each goal
multiple CSFs for each objective
33Implications for IS
multiple business objectives for each goal
multiple CSFs for each objective
Central Database - Data Warehouse
Monitoring and Control Systems
Common Interface
Dashboard
Indicators
IS 2
IS 4
IS 3
IS 1
34Sources of CSFs
- Industry
- Competitive strategy and industry position
(leader / follower big / small) - Environmental factors (eg economic fluctuations
and national government policies) - Temporal factors (temporary CSFs)
- Managerial position (more specific to one
manager)
35Classification of CSFs
- Internal versus external
- Monitoring versus Building / Adapting (eg
implementing of major corporate plan) - Evolution over time - eg motor industry
36 / - of the CSF technique
- Small number of CSFs
- Managers normally aware of them - make them
explicit is possible - Specific to firm / dept / manager
- But not all CSFs are measurable at all (access
to data) - Known CSFs may be trivial
- Time consuming to go beyond the obvious
- Will managers make time for CSF analysis?
37Dashboards of information
- A CSF analysis can be turned into a dashboard of
info - indication in real time of what is happening
- Concentration on the most important visual
impact (e.g. colour coding) - But data has to be very reliable and design of
interface must be good - three mile island
38Some Problems with 3 mile Island
- Layout of control not consistent with use of
indicators - no consistency on where associated controls are
situated or how they operated - layout of controls did not reflect layout of
plant - indicators and alarms were not sorted by degree
of importance - no consistency in use of colour
- Cl the layout of the dashboard and what
indicators represent ( how they do it) requires
much attention
39About dashboard development
- Developing IS with decision making relevance is
tricky - Nature of management work means difficult to
imagine generic features - 1970 1980 focus on complex models borrowed
from OR - Managers need simple systems that save them time
40The Control Room
- Monitoring complex processes through technology
mediated systems - Controlling without seeing directly
- Not directly applicable to management (human
interaction component missing) - But useful anyway to measure performance in a
more complete fashion
41Key issues for dashboard development
- Limited attention - selection of indicators
(CSF) - Accurate performance measurement - methods used
- Operator / user training - consensus /
awareness - Dashboard layout - avoid confusion / be
consistent
42Framework for dashboard development
Question 1 Who will use this indicator? Question
2 Can it be mapped out to a specific objective
at a higher level? Question 3 How frequently
will managers need to monitor it? Question 4
What calculation methods? What unit of
measurement? Question 5 What data source exists?
What should be created? Question 6 How detailed
should the analysis be? How can the indicators be
broken down? Question 7 What threshold values
should be used to differentiate between adequate
and inadequate performance? What comparisons can
be made to assess the companys
performance? Question 8 How can it be
represented for maximum visual impact? Question
9 What action must be taken when good or bad
performance is measured? Question 10 How will it
be monitored / archived in the long term Question
11 Is there any potential bias with the methods
and data used for calculations? What incentives
may be given to organizational actors?
See handout
43Example 1 Monitoring Maintenance
- Imagine down time is increasing
- dont know enough to fix the problem
- (1) collect appropriate data on accidents
- maintenance staff time sheets
- accident report for each problem - documented by
operators - match both sources of data
- (2) store it in a suitable DB
- (3) analyse based on a number of CSF
- (4) present analysis in computer dashboard
44CSF analysis for the maintenance
- Number of accidents per run (per unit / product)
- Nature of accident (several categories to be
found) - Location of accidents
- Average duration of repair (for each assembly
line) - Average duration of repair for each staff?
- Average duration of repair for each type of
accident - Mapping of when accidents happen
- establish thresholds
45Location ( of all accidents)
5
al
1
10
W3
W3
Shipping
10
al
2
8
al
1
WP2
W2
W2
35
storage
Stocks
al
2
Main Corridor
Finished
3
Goods
al
1
WP1
W1
W1
6
cooling
al
2
Changing
3 - 3 - 15
Other Areas 2
Stocks
Rooms
Preparation ovens
RM
and Related
Quality
Facilities
Control
46Time spent ( of down time)
5
al
1
5
W3
W3
Shipping
20
al
2
41
al
1
WP2
W2
W2
8
storage
Stocks
al
2
Finished
Main Corridor
3
Goods
al
1
WP1
W1
W1
4
cooling
al
2
Changing
3 - 3 - 8
Other Areas 2
Stocks
Rooms
Preparation ovens
RM
and Related
Quality
Facilities
Control
47When accidents happen
48Who does what?
49Analysing the types of accidents
50Conclusion on Maintenance
- Cant show everything
- Data should be collected, but choices must be
made for dashboard - Choices can be made based on
- scope for improvement
- development VS monitoring (hierarchy of CSFs)
- preferences of managers
- Archives will show whether targets are achieved
new threshold values can be set
51Example 2 sales figures
- Sales dashboard is a key tool
- Allocate responsibility for poor performance with
more accuracy - Break down per product / market
- Present both volumes, gross revenues and
contribution figures - Use colour coding to indicate where results are
good or bad - Use sales maps for visual impact
- Comparison with
- Budget figures (e.g. weekly figures)
- Competitors
- Previous period
- Same period previous year in case of seasonality
52Electronic Products Ltd.
- Overall goal Develop the dashboard for staff and
management - Follow the guidelines spelt out in the paper
- Carry out a CSF analysis based on the case notes
- Use the framework in table 1 to verify that you
have all angles covered
53Computer-based dashboard
- Select design targets based on the case and your
own preferences - Develop a small data structure containing the
data required for your dashboard (MS Access) - Design the interface in VB
- Package you prototype including a small sample of
dummy data - Submit your project on disk
- Be economical with the size of the components
- Be careful that you give me all the files
54Reading the case
- Common goals of company (page 3)
- Customers are essential to the success of the
business - Survival of the business is paramount
- Keeping the pioneering spirit alive
55Critical success factors
- Price, quality, delivery and flexibility (page
3) - longer-term survival and success (page 3)
- customer is king can visit premices at any time
(page 4) - everybody was responsible for his or her own work
(page 4) - Reliance on Self-directed teams (page 4)
- planned their own work, set production and
performance goals, and assumed complete
responsibility for their tasks - Reliance on free issuing of material to the
company (page 4) - Responsiveness /flexibility in responding to
customers queries (page5)
56Critical success factors (2)
- Profitability target 10 (page 6)
- Turnover growth target 32 per annum (page 6)
- Product mix (page 7)
- sourcing jobs (pages 6 and 7)
- Move back to profitable position (page 7)
57Example Profitability
- Question 1 Who?
- Question 2 Can it be mapped out ?
- Question 3 How frequently
- Question 4 What calculation methods? What unit
of measurement? - Question 5 What data source exists? What should
be created? - Question 6 How detailed should the analysis be?
- Question 7 What threshold values
- Question 8 How can it be represented
- Question 9 What action must be taken when good
or bad performance is measured? - Question 10 How will it be monitored / archived
in the long term - Question 11 Is there any potential bias with the
methods and data used for calculations? What
incentives may be given?
58Profitability
- Q1 everyone but MD and key managers in priority
- Q2 High level objective
- Q3 2 types quarterly / annual per job
- Q4 revenues costs percentage of revenues
- Q5 accounting systems have everything, but is
there job accounting? - Q6 see Q2
- Q7 case says 10 overall, but 30 50 per job
- Q8 line overall and bar chart for jobs pie
chart for breakdown of costs (cost structure) - Q9 not an easy one selection of jobs is key
(see page 6) - Q10 Try to stick to target / review each job
overheads - Q11 tendency to eliminate marginal jobs
reduce turnover too much overheads no absorbed
potential loss of customer good will?
59Other CSFs
- Empowering work teams
- Measuring marketing efficiency (number of
customers approached VS contracts executed) - Monitoring the issue / use of goods
- Measuring the speed and accuracy of response
(quotes VS actual job costings) - Quality
- Customer satisfaction
- ..
60Problems in the case
- RM consumption at various stages
- price of RM
- comparison with budget recipe
- labour cost on factory floor
- where do they actually work?
- What are the tasks where productivity is lost?
- Packaging cost
- Quality of products
- why are volumes not growing as fast anymore?
- Maintenance is not working
61Overall method
- More rigorous procedures for reporting and
monitoring - Set up a complete Budget framework
- Budget broken down per responsibility - e.g.
buyers give prices, production gives productivity - once a year budget put together
- expected levels are put proposed by each area
- full report compiled (p/l for the year ahead)
- negotiated with top management
- final budget
- used to measure up everything that happens
62General Indicators - monitoring the business
- Focus on three key indicators in comparison with
budget to make it easier to analyse
responsibilities - volume V (Vb for budget and Va for actuals)
- price P
- formula F
- total variance Va Pa Fa - Vb Pb Fb
- volume variance Va Pb Fb - Vb Pb Fb
- (Va-Vb) Pb Fb
- Price variance Va Pa Fa - Va Pb Fa
- (Pa - Pb) Va Fa
- Formula variance Va Pb Fa - Va Pb Fb
- (Fa - Fb) Va
Pb
Applies to the cost side E.g. Pb Fb note that
total tot var
63Analysing the general indicators
- Volume variance
- breakdown per product / market / week
- also per rep?
- source budget / weekly sales
- who? Sales Director and reps regional
supervisors MD - colour maps showing areas / markets
- threshold values determine colour
- volume and figure
64Analysing the general indicators
- Price variance
- breakdown per RM / component labour (for each
category) focus on most expensive - buyers / production director supervisors
personnel director - source budget figures account payable /
payroll - Monthly probably enough (changes dont occur that
often) - tables for detail exception reporting using
shape of RM that is causing the variance to be
negative
65Analysing the general indicators
- Formula variance
- per product / per RM labout
- source stock out sheets production sheets
(sales too late) personnel hours - some figures cannot be known exactly use
surrogate or estimate - target foremen, production staff and director
- gauges, colour map of the factory, colour coded
signs
66Specific indicators
- Read in the case
- do the same job as on the previous slides
- try to find indicators of specific interest to
some of the managers described in the case - e.g. maintenance problem
- collect data on all accidents (foremen)
- store in db
- provide statistics on how long it takes to
re-start, how often certain accidents occur,
where... - ask maintenance staff to fill out time sheets
- compare the two data sets
- how would you present this?
67Example 1 Monitoring Maintenance
- Imagine down time is increasing
- dont know enough to fix the problem
- (1) collect appropriate data on accidents
- maintenance staff time sheets
- accident report for each problem - documented by
operators - match both sources of data
- (2) store it in a suitable DB
- (3) analyse based on a number of CSF
- (4) present analysis in computer dashboard
68CSF analysis for the maintenance
- Number of accidents per run (per unit / product)
- Nature of accident (several categories to be
found) - Location of accidents
- Average duration of repair (for each assembly
line) - Average duration of repair for each staff?
- Average duration of repair for each type of
accident - Mapping of when accidents happen
- establish thresholds
69Location ( of all accidents)
5
al
1
10
W3
W3
Shipping
10
al
2
8
al
1
WP2
W2
W2
35
storage
Stocks
al
2
Main Corridor
Finished
3
Goods
al
1
WP1
W1
W1
6
cooling
al
2
Changing
3 - 3 - 15
Other Areas 2
Stocks
Rooms
Preparation ovens
RM
and Related
Quality
Facilities
Control
70Time spent ( of down time)
5
al
1
5
W3
W3
Shipping
20
al
2
41
al
1
WP2
W2
W2
8
storage
Stocks
al
2
Finished
Main Corridor
3
Goods
al
1
WP1
W1
W1
4
cooling
al
2
Changing
3 - 3 - 8
Other Areas 2
Stocks
Rooms
Preparation ovens
RM
and Related
Quality
Facilities
Control
71When accidents happen
72Who does what?
73Analysing the types of accidents
74Conclusion on Maintenance
- Cant show everything
- Data should be collected, but choices must be
made for dashboard - Choices can be made based on
- scope for improvement
- development VS monitoring (hierarchy of CSFs)
- preferences of managers
- Archives will show whether targets are achieved
new threshold values can be set
75Other specific indicators
- Fat content in paste (line graph per hour)
- Fat content in paste (same)
- average weight of goods VS target
- loss at various stages of production
- Appearance of the product
- taste of the product
- physical resistance of product
- returns
76Assignment
- Report on the CSF analysis that we have done in
class your analysis - your report on the three general indicators
- your analysis of specific needs (based on the
list on previous slide) - develop a small dashboard using Access VB
concentrating on two indicators of your choice
77(No Transcript)
78Load the new control
Create the graph object
79(No Transcript)
80Guidelines
- for each indicator document
- who will use it?
- How frequently will they need it?
- How detailed should it be?
- What unit of measure will be used?
- What data source exists? What should be created?
- How can it be broken down to be more meaningful?
- How can it be represented for maximum visual
impact? - How will it be monitored in the long term?
- Be creative
- add details to the case if they are not there
- design methods to collect the required data
- answer the questions above
- come up with a nice, simple dashboard that works
- reports to be brief (bullet points)
81Computer Integrated Manufacturing (CIM)
- Overall computerisation process which started a
long time ago - Encompasses many different types of applications
- basis was the application of the Materials
Requirements Planning (MRP) principles (early
70s) - APICS (American Production/Inventory Control
Society) - All major software houses developed and marketed
MRP systems
See handout
82Proven benefits of CIM
- Reduction in design costs 15 - 30
- reduction of in-shop time of parts 30 - 60
- increase in productivity 40 - 70
- better product quality 20 - 50
- Improved product design up to 30 times more
design variants investigated
83Different Applications of CIM
- Increased flexibility in design / production in
order to serve niche markets (focus on small
output) - more Europe - Better organisation of mass production - more
Japan - Better utilisation of the capacity, optimisation
of performance - more US
84Materials Requirement Planning (MRP)
- Snowball effect as companies moving to MRP
imposed business changes to their partners - MRP logic was always around, but switching costs
in manufacturing made it worthwhile - data processing costs decreasing
- inventory costs rising
- Sophisticated CIM systems easier to justify
- Other external pressures mean that tighter
control is required
85Where does MRP work best?
- Universally applicable principles butworks best
if there is a need for - stronger linkage between purchasing,
manufacturing and distribution - better shop floor control
- sorting out buffer stocks and work centre
priorities (e.g. fabrication and assembly)
86Principles of MRP
- System to plan and control production and
material flows - core principle
- demand for material, parts and components depends
upon the demand for finished product - Chain of causality from finished goods back to
inventories - possible to reduce inventory to the minimum
- plan for procurement based on actual needs
- able to cater for lumpy (i.e. dependent) demand
See diagram
87How MRP works
- Master production schedule drives the system
based on customer orders - Bill of material (dependent demand)
- Inventory status file
- MRP package - contains the logic
See handout
88Integration of design and manufacturing
- integration of operations with upstream design
activities and downstream sales activity - downstream e.g. by integrating CAD with Bill of
Material - new designs go on-line immediately
- no production of obsolete products / assemblies
- shorter time to market for new pdts
89Core of MRP Inventory Control
- Recording of all flows in and out of stock
- comparison with physical count (once in a while)
- Quantities of items on hand, on order (based on
delivery date) and committed to production - Requirements for parts and material as in BOM
- Management of location and bin numbers (e.g.
Musgrave)
90Inventory Control - Key factors
- Lead times (purchasing, manufacturing)
- Cost of components and material (valuation)
- Carrying costs
- Order costs
- Economic Order Quantity (EOQ)
- Lot tracking
91Conclusion Determining the value of MRP
- Difficult to establish off-hand Depends on many
organisational factors - Degree of preparedness depends on
- human relations on factory floor and with other
areas - tightness of current procedures
- availability of accurate data
- formalised process / recipe
- level of skills available
- quality of existing support systems
- Proper expectation should be that benefits can be
significant, but road can be long as well
92Enterprise Resource Planning (ERP)
- Large applications geared towards integrating the
essential internal processes of an organisation - A k a enterprise-wide systems
- e.g. SAP R/3, MFG/PRO, Baan, JD Edwards, Oracle
- 70 of fortune 500 companies have or are
implementing ERP systems - SAP and Oracle have become the second largest
software producers in the world
Extended enterprise
93Enterprise Resource Planning Systems (ERP)
- Support for key areas of the firm operational
excellence - Very dynamic market worldwide ( 40 per year)
- SAP 30,000 implementations, 10 million users and
more than 1000 partners - Software typically bought from a vendor
- Difficulties in selecting and implementing ERP
94ERP stories
- Whirlpool hundreds of distributors receive no
deliveries after the update of the SAP software. - Hershey Despite 112 million spent on SAP R/3
all shops empty on Halloween week. - Allied Waste Industries ERP project stopped
after 130 million investment - Waste Management Inc. same after 45 million
investment - Unisource Worldwide and Dell also cancelled their
projects - Foxmeyer after three years of unsuccessful
implementation, company sues SAP and AA before
going bankrupt
95Case for ERP
- Managerial goals of standardising / integrating
systems - ERP common grammar and common pool of data
- Also supposed to reflect best practice (optimised
business processes) - Intense vendor / consultant push
- Microsoft case (18 millions saved annually)
96The case against ERP
- High risk projects
- Full implementation means 80 of existing systems
must go - Some re-engineering may also be needed
- Political pressure managerial rationale?
- Low success rates reported
97Managerial rationale
- Search for operational excellence using best
practice models - cost cutting / rationalisation
- standardisation / compatibility of disparate IT
infrastructures (e.g. mergers) - Year 2000?
- By extension, platform for ECommerce
- e.g. Ericsson reported following improvements
- SOP 1 hour to 10 minutes
- PO 4 hours to 5 minutes
- production scheduling 18 hours to 30 minutes
- 98 of orders delivered on time
98Reality of ERP
- Too many times reported that ERP implemented
under instruction from HQ - No business case ever built at local level at
least - Some stories of sites having to implement 3
different ERP software within a few years - Cost justification / disruption to everyday
business not sufficiently taken into account
99Content of ERP systems
- ERPs are not single systems series of modules
supporting specific areas - admin functions
- HR
- manufacturing / MRP
- order processing etc
- single point of entry for each item of data sits
on top of a single database of shared data - data is released from one module into the
relevant modules once it has been checked - ERPs have the potential to solve many back end
headaches - Build upon earlier generation of CIM systems
e.g. MRP
100E.g. DELL
- three plants are located close to their suppliers
and operate in JIT - Orders follow machines across the floor
- Automated customer requests mean operators are
shown by flashing colours what type of PC to
assemble) - no finished goods inventory (cost,
obsolescence) - outsourcing of non-critical components (e.g.
screen) - acceleration of payment cycle (goods paid for
before they are built!)
101Introduction to MFG/PRO
- Each student get their own version of the
training database Quality Pencil company - Create a new product and sell it Packaged Pen
- Not so easy to go around the menus
- Codes are used to help users find their way
e.g. 1.2.1 is product line maintenance - Users must learn which screens to use to do things
102(No Transcript)
103(No Transcript)
104(No Transcript)
105Reasons for ERP systems
- Search for operational excellence using best
practice models - cost cutting / rationalisation
- standardisation / compatibility of disparate IT
infrastructures (e.g. mergers) - Year 2000?
- e.g. Ericsson reported following improvements
- SOP 1 hour to 10 minutes
- PO 4 hours to 5 minutes
- production scheduling 18 hours to 30 minutes
- 98 of orders delivered on time
106Example (2) Dell case study
- No stocks (RM not paid for until in the factory)
- Tracking of WIP on the floor
- Testing fully automated
- Impressive AGV for temporary storage of large
orders - 95 fully automated loading bays
- main sorting point of output for shipping
- scanner operated
- straight from assembly line to trucks
107Example Colgate Palmolive
- Large corporation with many products
- Goal streamlining the business while offering
increasing flexibility to customers - SAP R/3 to address manufacturing / logistical
complexity - 1996 - 2001 to equip the whole corporation
- 75 data centres 2
centres with 40 staff - 1 to 5 days for orders acquisition combined
acquisition - 1 or 2 days to process them and processing
in 4 hours! - on-time deliveries 91.5 97.5
- Also accounts payable and HRM
consolidated in one location
Before
After
108How to get an ERP
- No real build or buy decision
- try to minimise the high levels of risk
- Foxmeyer (5 billion pharmaceutical comp.) went
bankrupt in 1996 - sued SAPs US subsidiary and Andersen Consult.
for a combined 1 billion - 3 years of implementation destroyed the company
- bought by McKesson Drugs - 1997
- Try to get best fit between ERP functionalities
and business model
109Critical issues in ERP implementation
- High cost and high stakes
- Misguided belief that there is an ERP that does
it all - difficulty in making a transition from an old
model to an ERP model - overestimation of the pace of change of some
stakeholders (technical change is not sufficient) - difficulty in obtaining any direct ROI
110Buying ERPs
- Many suppliers SAP / Baan / JD Edwards / QAD
- always implemented through a distributor
- advantages are numerous (as against building)
- integrate best practice
- insurance against obsolescence
- cheaper !!??
- Software development is not core competency for
most firms - but, selection process is difficult at best
- site visits
- presentation
- discussion groups
- Magazines and newspapers
111Alternative The Application Service Provider
model
- Over the last two years - Pressure from Y2K?
- "An ASP manages and delivers application
capabilities to multiple entities from a data
centre across a wide area network. - different types of ASP
- horizontal enterprise / volume or regional ASP
- vertical model task-specific or
industry-specific ASP - solution offered through a Best-of-breed or
One-stop-shopping model
112(No Transcript)
113ERP and ASP
- As with all ecom systems, service has two parts
- interface (web) or client
- back end functionality on a server
- opportunity to differentiate service for ASP
offer additional software in the package - opportunity for customer to pay far less and to
implement far quicker (c.f. SMEs) - Also, traditional ERP market is contracting
- expertise is in short supply
114Mechanics of ERP / ASP Services
- 24 to 36 months contracts
- 400-500 euros per workstation per month
subscription fee at start - service includes technical setup /
implementation software licences on-going
support upgrade - some ASPs offer differentiated services for
different industries - others develop interfaces that allow some degree
of customisation without touching the software - SAP claim the same margins can be obtain
115Critical Success Factors in ASP model
- Security of the data and application
- performance and reliability of application
- at least 98 uptime
- flexibility of the service offered
- adaptation of the software
- relationship between supplier and customer / user
116Potential partners
- Pure play ASPs - 100 new
- ISP and Telecom companies - own the
infrastructure - Software vendors - own the licences
- Hardware vendors - own the platform
- Distributors - own the customers
- No one has all the required competence
117ERP Capabilities - SAP
- Accounting / finance
- Asset management, cash management, product cost
accounting, A/R and A/P - Production planning and materials planning
- purchasing, inventory management, MRP, production
planning - HR management
- travel expenses, payroll, personnel planning
- sales and distribution
- sales planning, order management, quality
management - e.g. Microsoft spent 10 months and 25 ms
replacing 33 different systems in 26 sites with
SAP
118ERP capability - MFG/PRO
- meant to deal with requirements throughout the
entire product supply chain - multi-location / multi-factory / multi-products
etc - Includes Inventory control Distribution /
Manufacturing / Financial / Field services
support / Planning - Based on a large Progress relational database
and developed in 4th GL
119Future trends
- A bit of a jungle - needs for standards
- Risk element is great for all partners involves -
especially customers - Application Service Provider Industry Consortium
created end of 1999 - Code of good practice ready in January 2000
- creation of a certification that guarantees
service and gives protection to customer (Ernst /
Young and Deloite / Touche)
120Next steps on this market
- Inclusion of Customer Relationship Management
- Platform provider for ASP solutions
- e.g. Prologue Microsoft biz_at_large
- HP willing to enter into the capital of any
venture if they provide the hardware - Business Process Outsourcing (BPO)
- eXtended Resource Planning (XRP) - support
decision making as well - e.g. business intelligence
- e.g. balanced scorecard
121Computer Integrated Manufacturing (CIM)
- Overall computerisation process which started a
long time ago - Encompasses many different types of applications
- basis was the application of the Materials
Requirements Planning (MRP) principles (early
70s) - APICS (American Production/Inventory Control
Society) - All major software houses developed and marketed
MRP systems
122Reasons for MRP
- Snowball effect as companies moving to MRP
imposed business changes to their partners - MRP logic was always around, but switching costs
in manufacturing made it worthwhile - data processing costs decreasing
- inventory costs rising
- Sophisticated CIM systems easier to justify
- Other external pressures (eg financial / legal)
mean that tighter control is required
123Where does MRP work best?
- Universally applicable principles butworks best
if there is a need for - stronger linkage between purchasing,
manufacturing and distribution - better shop floor control
- sorting out buffer stocks and work centre
priorities (e.g. fabrication and assembly)
124Core of MRP Inventory Control
- Recording of all flows in and out of stock
- comparison with physical count
- Quantities of items on hand, on order (based on
delivery date) and committed to production - Requirements for parts and material as per BOM
- Management of location and bin numbers (e.g.
Musgrave)
125Conclusion on ERP
- Whether traditional or ASP - matching the
business processes to the functionality - obtain agreement from all organisational actors
- be ready for fundamental change
- dont lose sight of the specificity of the firm
- try an incremental implementation rather than a
culture shock - leave the door open for change after the ERP
implementation
126Case Study of SAP implementation
- Vandelay Industries Inc. (95 - 97)
- SAP R/3 ERP
- Goals
- end the fragmentation of systems
- allow process standardisation
- give more visibility on data across entire
corporation - give competitive advantage
- much enthusiasm especially amongst plant managers
- high expectations / low level of understanding
what ERPs are
127Company background
- Manufacture and distribute industrial process
equipment - 8 billion turnover
- rapid expansion from 1945 to 1985 by opening new
sites and buying smaller firms - 30,000 staff on four continents
- find themselves too expensive and too slow
- three plant closures and 10,000 staff lost
- return to profitability but fear that it may not
be enough
128Information Systems
- Each plant had own systems (MRP, planning,
scheduling) - corporate finance IS only integrated one
- problems resulting
- integration often impossible
- scheduling incompatible no end-to-end vision
of processes as soon as more than 1 plant
involved - no overall planning
- order acquisition entirely manual (faxes and
phones) - no integration of key functions - e.g. HR
- also, processes complex on factory floors
129The Team and the Project
- SAP - the market leader at the time (6000 sites
400,000 users in 1995) - Deloitte and Touche / ICS subsidiary - favourite
SAP implementer - general management consultants
- SAP specialists
- 18 months planned with 50 f/t staff
- budget 20 million
- 50/50 split designing to be processes /
implementing SAP - target sites
- 8 manufacturing
- 4 order entry
- headquarters
130Key issues in the project
- Steering committee made up of high level, highly
committed managers - monthly meetings - Pluridisciplinary project team - IS key
functional areas - full time - centralisation vs autonomy (involvement of users)
- standardisation of practices (e.g. part numbers)
- Suitability of SAP
- change business to match SAP
- interface SAP with other system
- extent SAP system to match current practices
- Persuading key change agents
131Customer Relationship Management
- Cost of selling to a new customer is six times as
high as to existing customer - Each dissatisfied customer tells 8 to 10 people
- 1 extra of customer retention can boost
turnover by as much as 15 - Odds of selling to a new customer 1/7 to an
existing customer 1/2 - 70 of dissatisfied customers will do business
again if they feel their complains are handled
well - Many companies dont have proper customer support
132Why CRM?
- Customers dont care about their suppliers
internal difficulties - They want to be able to access product and
services at the least cost - They want a single point of entry
- Existing loyalty programmes dont go far enough
133The 3 phases of CRM
- Acquiring new customers
- by promotion
- leading edge product backed by superior service
- Enhancing profitability of existing customers
- cross-selling and up-selling (one stop shopping)
- additional services
- Retaining most profitable customers
- best customer list
- customer profitability analysis
- make best offer to best customer
134Supply Chain Management
- Increasingly common type of application
- e.g. Bergen Brunswig (pharmaceutical medical
product distributor) - no longer see themselves as a distribution
company but as managing the medical supply
channel on behalf of others - not merely moving products but also managing
information and the ultimate efficiency of the
channel - e.g. Dell
- anti e.g. Boeing wrote off 2.6 billion in Oct.
1997 - raw material and internal assembly shortages
- unhappy customers
135Definition
- Complex network of relationships that
organisations maintain with trading partners to
source, manufacture and deliver its products - includes material, information and financial
flows as shown below
Information Flows
Supplier
Manufacturing
Distribution
Retailer
Consumer
Payment Flows
136Goal of SCM
- Delivering the best value proposition what the
customer want, how and when its wanted, at the
lowest possible price - to achieve this companies need rapid, cost
effective and flawless demand fulfilment - Involves taking responsibility for what happens
outside the walls of the organisation - linkage with suppliers
- minimising the cost of order delivery process by
trading off cost of inventory, transport,
handling etc...
137Obstacles to good SCM
- No player has enough info to synchronise the
entire channel - most SCc contain more than double the required
inventory - products are handled too many times (5/6 average)
- Physical carriers struggle to maintain costly
equipment on slim margins
138Novelty in SCM - eSCM
- Better techniques and software e.g. SAPs
Advanced Planning and Optimisation - Supply Chain planning for the entire channel
- Web-based applications shared by all partners
involved including consumers help both planning
and execution provide greater visibility - e.g. complex product with fragmented supply in
many different countries
139Supply Chain Trends
- Increased worldwide dispersion of manufacturing
and distribution facilities - increased channel unpredictability
- responsiveness before efficiency need to be
quick and flexible disrupts existing paradigms - Market share before profit margin (.com)
140Key Areas of Investment in SCM
- Inter-enterprise co-ordination of design,
manufacturing and business process - Effective distribution and channel partnership
- customer responsiveness and accountability
141Different stages in SCM
- Enterprise focus - traditional model
- characterised by fragmentation
- sometimes semi-conflict between links in the
chain - Partner focus - modern vision
- characterised by collaborative idea
- Direct focus (e.g. Dell) - emerging vision
- characterised by customer-direct capability
- near zero inventories
142Service through SCM integration
- Inferior integration of SCM results in
- erratic level of service
- no vision of future demand
- bad/inefficient production planning and
scheduling - rising inventory costs
- Good SCM leads to
- Responsive SC (quick and accurate)
- Enterprising SC (adaptable)
- Intelligent SC (dynamic and visionary)
143Elements of SCM
- Two key elements are
- planning
- forecast of demand,
- inventory simulation
- manufacturing planning...
- Execution
- procurement
- manufacturing
- distribution...
- Specific software exist to enable those
144SC Planning
- Two types of software
- Order commitment (available-to-promise)
- Advanced scheduling and manufacturing planning
- Demand planning
- Distribution planning
- Transportation planning
- Understanding the impact of taking additional
orders / changing current orders - Integration with ERP required
145SC Execution
- Key differentiator in todays markets
- Planning can help to cut costs, be more efficient
- Execution is what truly satisfies customers
needs - key stages
- order acquisition
- production / purchase of goods
- replenishment
- distribution
- reverse logistics (dealing with returns - up to
14)
146Problems with SC
- Lack of knowledge of the end-to-end demand
function - inconsistent / out-of-date data about SC (poor
decision making) - lack of process integration with partners
- need for fundamental structural changes
147Solutions
- Enable information sharing
- robust communication process
- create joint performance measurement systems
- create joint collaborative planning processes
- exchange responsibilities / redesign across firms
- redesign products and services to facilitate work
and satisfaction of customers - All these are stages of the total solution
148Key Questions in sorting out the SCM
- SCM is a business design issue
- What is the right e-chain structure?
- Does the chain enable us to differentiate
ourselves? - Does it facilitate effective order fulfilment?
- Is it matched by proper infrastructure / internal
processes?
149Amazon.com key facts
- Begin July 1995
- Revenues 150 m in 1997 up to 2.8 b in 2000
- Customer accounts 1.5 m in 1997 to 17 m in 2000
- Repeat customers 65 in 1998 to 78 in 2000
- Truly global business 150 countries
- 200,000 associates signed up
- Not successful in all areas of activity
- Unprofitable overall
150Traditional business model
- Concentration at all levels of supply chain
- But no dominant force on the retail side (very
small companies) - Return policy with approx 30 return rate across
the board - Characterised with huge fluctuations very few
titles really successful e.g. academic titles - But publishers bear all the costs
- Display costs are enormous in view of value of
products
151New business model
- New way of selling books means return rate down
to 3 (potential saving 50 of industry margin) - Quicker turnaround of stock (stock only big
titles) - 15 days of inventory credit card payments
huge positive cash flow - Reduction in costs are shared with customers
lowest prices - Elimination of critical mass principle in
industry
152Key to competitive advantage
- Trade real estate for technology
- Keyword in business location, location,
location - Real estate gets expensive / technology gests
cheaper - Large volumes of transactions / items main
problem of customer is classification / search
problem means computer is the winner - Initial product tailor made for Internet sales
- Someone else does the hard work of creating the
material - Easy to ship
- Low value low risk
- Informational easy to demonstrate sell
on-line - E.g. sample chapters, revues etc
- Not all products are like that!!
153In the case of Amazon
- Move away from duplicating physical buying
experience - 3D walk
- Computing concept database etc
- Introduce switching costs by adding features not
replicable (e.g. customer history) - 1-click technology patent!
- Reviews
- Purchasing circles (Meta-information)
- Email alerts
- Etc.
154competition
- Traditional competitors not in same dimension
(largest stores 175,000 titles in stock against
4.5 m) - Barnes and Nobles failed despite size and
expertise - Booksense.com and booksite.com have failed to
make a impact at the same level as Amazon - In CD market elimination of CDNow.com in one
quarter (means that trust can be migrated to
other activities) - It seems that the main expertise carried by
Amazon is SELLING on the NET, not what they sell
155Types of SCM
- Integrated Make-to-stock
- smoothing demand in mass production industries
- linked to postponement in distribution channel
- Continuous replenishment
- customer-demand pull system across firms
- ECR, QR
- Build-to-order
- efficient SCM allows return to BTO model
- inventory substituted with information (Dell)
156Example CVS-McKesson SCM
- McKesson occupied key position
- 35000 customers / 60000 orders (1.6 m lines)
daily