Title: WAB Wind Energy Industry Network
1- WAB Wind Energy Industry Network
- Northwest Germany A Region for Offshore-Wind
2Wind Energy Agency Bremerhaven/Bremen
- Association with over 140 members from industry,
services and science from Bremen and surrounding
coastal region - Companies from a broad industry spectrum
- Partly funded by the Federal State of Bremen and
the EU - Branch office in Bremerhaven
3Members of WAB
Turnover approx. 500 Million Employees
approx. 1,000
Maritime industry
Logistics
Wind sector
4Prognosis for Wind Power in Germany
Source DEWI/WindEnergy 2006)
Offshore potential (initiated joint action by
industry and regional politics)
Repowering
Offshore and repowering focus in coastal areas
5Licensed Wind Farms in the North Sea
- 15 licences have been granted by the federal
licensing authority BSH in the North Sea - Max. 80 Turbines per wind farm
- 3.5 5 MW turbines proposed
- 1053 turbines
- 3,800 5,300 MW rated power, depending on
turbine size - Value 9 15 Billion
WAB members
6Strategy for Offshore-Wind by the State of Bremen
- Strategy decided in 2003
- Support to set up an industry network (WAB)
- Develop heavy load capable industrial area
Luneort - tailored for wind energy manufacturers and
suppliers - with direct quay access
- Provide locations for offshore turbine prototypes
- Enhance contacts between industry and
RD-institutes - Set up testing facilities
7Offshore Developments in 2007
- Grid regulation in force TSO responsible for
connection - Alpha ventus grid connection underway
- 400 MW substation ordered by E.ON Netz
- Feed-In tariff evaluated by federal government in
2007 - Current feed-in tariff too low (0,09 / kWh) due
to rising prices (steel, turbines) and too
optimistic technical/economical assumptions - Minister Gabriel announced
- Government intends to increase offshore feed-in
tariff - Tariff bandwith 0,11-0,15 / kWh proposed
- Cabinet decision on tariff height in December
2007 (part of general discussion on Renewable
Energies Act EEG) - New offshore tariff from 10/2008
8Alpha Ventus Test Field a Lighthouse project
- Significant contributions from Northwest-Germany
by WAB-members - 12 Turbines - 60 MW rated power
- 2008 6 Multibrid M5000 (on tripods)
- 2009 6 Repower 5M
- Operated by DOTI-consortium utilities EWE,
E.ON, Vattenfall - Grid connection construction has started on
Norderney island - 50 Million research program with government
funding (Fed. Env. Min.)
9Offshore Turbines by WAB-members
- Redundancies
- Long service intervals (gt12 months)
- Nacelle weight
- Reliability
Siemens SWT-3.6-107
Multibrid M5000
Bard VM
Repower 5M
10Turbine Prototype and Production Development - I
- M5000 Turbine
- 5 MW, special design for offshore
- Single stage robust planetary 110 gear
- Special air conditioning system using tower as
overpressure chimney - Comparatively low nacelle weight of approx. 300
tonnes - First turbine is operating since December 2004
- 3,000 m² heavy-lift manufacturing facility ready
- Series production in Bremerhaven started in 2007
- Aquisition of 51 stake by AREVA
11Turbine Prototype and Production Development - II
- Special offshore design 5M (now 6M)
- 2 turbines for Beatrice
- 2 turbines for onshore test site in Cuxhaven,
more onshore sites planned - 6 turbines for German test field ordered
- Start building of production facility in October
2007 in Bremerhaven - Repower announced upscaling to 6 MW
12Offshore Foundations and Towers
Produced tripod and jacket for prototype offshore
turbines. Site reserved in Bremerhaven,
construction facility for serial production
planned for 2008
Existing tower facility with quayside in Bremen -
all German offshore prototypes supplied.
Additional facility construction site aquired in
Bremerhaven
Facility for tripile construction underway in
Cuxhaven
13Metmasts Construction, Engineering, Installation
Consortium
Research
Owners
Metmast Arkona
Consortium
Owner
14RD Resources
- Technical reliability of (offshore-) wind
turbines - Dynamic rotor blade test stands (70/90 m)
- First test stand operational 2008
- Located in Bremerhaven
- New wind tunnel
- Special design for wind power RD
- Operational now
- Located in Bremerhaven
15 Bremerhaven - Development for Offshore Wind
Luneort area since 2003 realisation of heavy
load space for offshore production site
16WAB Offshore Industry Network Summary
- Significant capacity building in
Northwest-Germany - Main manufacturing competences available
- Turbines
- Foundations
- Logistics
- Significant investments in production facilities
underway in Bremerhaven and Cuxhaven - Well developed and integrated supply chain
- Regional transport infrastructure with high
capacities - Very effective international information exchange
through POWER project with lasting effect (EU
Interreg IIIb program) - Strong interest in international cooperation,
especially - Ships, cranes
- Logistical concepts
- Offshore experience, offshore OM experience
17WAB Network Recognition
- Competence networks initiative of the Federal
Ministry of Economic Affairs for best innovation
clusters in Germany - Admission of WAB in January 2007
18WAB Annual Offshore Conference windforce08
- 2008 3 - 5 June, Bremerhaven
- Compact overview of offshore developments in
Germany (and Europe) - Simultaneous translation available
- In 2007 270 participants, fully booked
19WAB International Offshore Magazine
- Comprehensive information on offshore wind in
Germany - Available in conference bag, at WAB-Stand D0200
and as download on WAB-website
20Windenergie-Agentur Bremerhaven/Bremen e.V.
(WAB) 49-471-39177-0 Schifferstrasse 10-14 27568
Bremerhaven Germany
Thank you for your attention!
www.windenergie-agentur.de