Power - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Power

Description:

C&DH. system on/off. RJ45. 12V. CubeSat Mid-Semester Review March 13, 2002 Page 6 ' Sat' ... Prototype Construction: Beginning. CubeSat Mid-Semester Review ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 17
Provided by: Sput9
Category:

less

Transcript and Presenter's Notes

Title: Power


1
Power
  • Rick Navarro
  • Justin Maloney-Hahn
  • Drew Guckenberger

2
Subsystem Objective
  • The power subsystem is required to perform the
    following throughout the life of the mission
  • Generate Power
  • Store Power
  • Regulate Power
  • Distribute Power
  • Power subsystem (CPS) supports most other
    subsystems and interfaces with all
  • Reliable, Accurate, and Robust

3
Primary Requirements
  • The CPS shall supply at least 1.2 Watts of orbit
    average usable power for the mission lifetime.
  • The mass of the CPS shall be no more than 180g.
  • The CPS shall cycle subsystems on and off.
  • Applicable Documents
  • Government/Military Documents
  • CUBESAT Design Specifications Doc.
  • Launch Services Specifications Doc.

4
Primary Requirements
  • System-level interconnection chart showing
    Input/Output Requirements

Interface Legend Electrical Informational
Physical
5
Primary Requirements
  • Subsystem-level interconnection chart showing
    Input/Output Requirements

RJ45
12V
6
Primary Requirements
7
(No Transcript)
8
(No Transcript)
9

Vs
Solar Cells (x5)
Batteries 9-12.6V

-Vs
Serial Bus Data
1.5V_Coil_x
Serial Bus Clock
GND_Coil_x
Power Board
Vp_CndH PWR (7-15V)
1.5V_Coil_y
GND_CnDH
GND_Coil_y
GDS_SEL
1.5V_Coil_z
CnDH I/F
COMM_SEL
GND_Coil_z
Heater_SEL
Thermal_Sense_SEL
Vp_Boom Release
Deploy_SEL
GND_Boom Release
Magnetometer_SEL
Coil_x_SEL
5V_GPS
Coil_y_SEL
GND_GPS
Coil_z_SEL
5V_Thermal_Sens
GND_Thermal_Sens
5V_Comm
Vp_Heater
GND_Comm
GND_Heater
3.3V_Comm
Flight Pin
Kill Switch
10
Power Board Schematic
11
Power Board Schematic
12
Power Board Schematic
13
Power Board Schematic
14
(No Transcript)
15
Status
  • Hardware Design 80 complete
  • PIC Software 50 Pseudocode
  • Components 50 of prototype components in, 30
    readily available
  • Battery Ordering Problems!
  • Solar Panels Coming.
  • Prototype Construction Beginning

16
Issues/Problems
  • Need Lab Equipment
  • Oscilloscope
  • Voltage Supply
  • Multimeter
  • Batteries
  • CnDH serial/parallel Interface
  • Define protocol
  • Connectors
  • Battery Over-Charge Protection
Write a Comment
User Comments (0)
About PowerShow.com