Title: Traffic Management for Resurfacing in the Wanganui Region
1Traffic Management for Resurfacing in the
Wanganui Region
Joanna Towler, NZTA National Office Ross McCoy,
NZTA Wanganui Office 1 - 3 November 2009 NZ
Transport Agency NZIHT 10th Annual
Conference
2Key Message
-
- Chipsealing Needs Positive Traffic Management
3Embedment of Sealing Chips
4(No Transcript)
5Scabbing Stripping
6The Wanganui Story
-
- Unacceptable amounts of stripping
- Industry discussion why?
- Speeding traffic was one of the primary causes
- Also uneven compaction across the road
7Wanganuis Approach
-
- From industry meeting agreement there needed to
be an improvement in Traffic Control after
chipsealing - More emphasis needed on Positive Traffic
Management (COPTTM C10) - Active Temporary Traffic Control
- Passive Temporary Traffic Control
8Wanganui Trial Results
-
- First trial in 2000
- Dramatic results
- Scabbing reduced from 240 m/km to 85 m/km
- 65 reduction in scabbing
9West Wanganui Visual Condition Rating
10Wanganui Trial Results - Analysis
-
- West Wanganui resurfaces about 90 km (11 of the
network) per annum - Reduction in scabbing by 175 m/km over 120 to 140
sites saves - 60,000 to 70,000 in rework costs (to the
contractor) - 90,000 to 100,000 to the client (as contractor
would have allowed for rework costs in tender
price).
11Wanganui Traffic Control Clauses Original
-
- Original Clause (2001 2008)
- Traffic Control Layout COPTTM figures E2.6 and
E2.7 (Two-way Two- lane Level 1 road, one lane
closure) - Minimum 48 hours
- Minimum of two workers on site
- Use coned lanes to move the traffic over the full
width of the carriageway at a reduced speed
12(No Transcript)
13Wanganui Traffic Control Clauses New
-
- New Clause (2009/10)
- 48 hours, may reduce to 36 hours for
- Single coat grade 5 or 6, or,
- Traffic count lt 2000 VPD
- Contractor may nominate alternative seal types
- Continuous management of each site
- Use of road cones to ensure whole of new surface
is uniformly compacted
14(No Transcript)
15(No Transcript)
16West Wanganui Visual Condition Rating
17Increased Chipseal Life in Wanganui
18National State Highway Chipseal Lifetimes
19Average Chipseal Lifetimes
20Average Chipseal Lifetimes Wanganui SH
21Chipsealing Industry Working Group Agrees
-
- Best Practice Chipsealing involves Positive
Traffic Control
22Implementation Nation-Wide
-
- Choice of
- Engineer specifies Positive Traffic Control for
high stress and high profile sites, or, - This is best practice and everyone should be
doing it.
23Conclusion
-
- Best Practice Chipsealing involves Positive
Traffic Control - And everyone should be doing it