TEAMSKILL an exploration of manufacturing - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

TEAMSKILL an exploration of manufacturing

Description:

... is about to move to a new site and this gives you the ... make sure you use the talents of your fellow team members. ensure that you allow time to reflect ... – PowerPoint PPT presentation

Number of Views:37
Avg rating:3.0/5.0
Slides: 15
Provided by: jeremyj1
Category:

less

Transcript and Presenter's Notes

Title: TEAMSKILL an exploration of manufacturing


1
TEAMSKILLan exploration of manufacturing
  • The development of this simulation was sponsored
    by Honeywell and Metal Working Production
    magazine and run twice as a National Production
    Management Contest in the UK.

2
Introduction
  • You manage the operation of a factory.
  • Planning the Factory
  • Scheduling Materials and Production
  • Inventory Management
  • Production Control
  • Ensuring Timely and Efficient Operation

3
Process
  • You will be divided into small teams each of
    which must
  • Analyze the situation
  • Plan the Factory
  • Run the Factory for several Months
  • Combine with the other teams to discuss and
    compare results and strategies

4
The Situation
  • The factory that you are to manage makes small
    electric motors
  • The factory is about to move to a new site and
    this gives you the opportunity to replace
    machinery, change layouts, etc.
  • And this move means that you are replacing the
    existing, senior manufacturing management.

5
The Roles
  • Although you are free to organise your team in
    any way you wish, your responsibilities are
    likely to include
  • Works Manager (team leader)
  • Production Manager
  • Inventory Control Manager
  • Manufacturing Cost Accountant
  • Industrial Engineering Manager

6
The Product
  • The Electric Motor consists of these main parts
  • Stator
  • Rotor
  • Frame
  • And there are five models
  • 240/220 Volt long frame
  • 240/220 Volt short frame
  • 117 Volt long frame
  • 117 Volt short frame
  • 240/117 Volt long frame

7
The Production Units
  • You will manage in detail these manufacturing
    units
  • Punch Press (turns steel strip into punchings)
  • Rotor Assembly (uses punchings aluminum)
  • Stator Assembly (uses punchings wire)
  • Final Assembly (uses stators, rotors frames)

8
The Materials
  • You will manage in detail these materials
  • Steel Strip (magnetic motor elements)
  • Aluminum (electrical rotor elements)
  • Copper Wire (electrical stator elements)
  • Casting Sets (motor frame)

9
Production Process
SS
PP
RP
CW
A
SP
SA
RA
F
S
R
Raw Materials
FA
In Process Materials
Finished Products
FM
10
Decisions
  • decide a team name (up to six letters)
  • for the first period make planning decisions
  • for all periods schedule the factory

11
Factory Planning Decisions
  • Punch Press Machine
  • Die Cast Layout
  • Number of Stator Lines
  • Stator Staffing
  • Casting Set Supplier
  • Optional Reports
  • Storage Area Sizes

12
Factory Scheduling Decisions
  • Material Purchases
  • Minimum Production Rates
  • Maintenance Frequency
  • Machine Set-Ups
  • Final Assembly Schedule
  • Days Shutdown

13
Results
  • Decisions
  • Manufacturing Account
  • Capital Statement
  • Production Summary
  • Customer Research
  • Inventories (at month end)
  • Optional Reports
  • Comments
  • Current Set-Ups (end of month)

14
Observations
  • it takes time to understand
  • but the factory still must be run
  • so your decisions will not be perfect
  • time will be a constraint
  • but, by the end you should be just in command of
    your business!
  • your business competencies will be challenged
  • make sure you use the talents of your fellow team
    members
  • ensure that you allow time to reflect
Write a Comment
User Comments (0)
About PowerShow.com