Permanent Solution for Temporary Problems - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Permanent Solution for Temporary Problems

Description:

AJ Broom Road Products manufacture the BRP Road Patch ... Bitumen Rubber Prefabricated Chip Seal with a 80/100 pen grade bitumen. 22% rubber content ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 23
Provided by: mariati9
Category:

less

Transcript and Presenter's Notes

Title: Permanent Solution for Temporary Problems


1
Permanent Solution for Temporary Problems
  • Henri van Zyl

2
Content
  • Introduction
  • Product Details
  • Methodology
  • Application
  • Bridge Joints
  • Potholes
  • Wooden Bridge Surfacing
  • Before and After Examples
  • Possible application
  • Conclusion

3
Introduction
  • Public perception of Permanent repairs

4
Introduction Cont.2
  • Definition Permanent Repairs
  • Eg. Digouts
  • Design life
  • Short / Medium Term
  • Cost
  • 105.15 / m²
  • Included material
  • labour

5
Introduction Cont.3
  • Public Perception of Temporary Repairs

6
Introduction Cont.4
  • Definition Temporary Repairs
  • Eg. Road Patch
  • Design Life
  • Short / Medium term
  • Cost
  • 62.43 / m²
  • Included material
  • Labour

7
Product Details
  • Pallet Packaging
  • Individual Patch

8
Product Details Cont.
  • AJ Broom Road Products manufacture the BRP Road
    Patch
  • Internationally available more than 20 years
  • New Zealand 2 years
  • Bitumen Rubber Prefabricated Chip Seal with a
    80/100 pen grade bitumen
  • 22 rubber content
  • Seal chip Grade 2 to 6

9
Methodology
  • Sweep application area free from all loose
    particles
  • Ensure area is dry and not polluted with oil,
    grease, diesel etc
  • Mark out the area
  • For Potholes   Fill up the void, and
  • Cut the BRP Road Patch to the required size or
    shape (with a 100mm overlap)

10
Methodology Cont.2
  • Apply emulsion evenly to the marked out area and
    to the back of the BRP Road Patch
  • 7. Allow emulsion to break over the entire area
    of the marked out area and the back of the BRP
    Road Patch i.e. emulsion turns from brown to
    black and becomes very tacky

11
Methodology Cont.3
  • Place BRP Road Patch onto emulsion treated area.
    BRP Road Patch to be paper side down, aggregate
    side upwards (no overlap)
  • Apply a small quantity of emulsion to edges and
    joints using a brush
  • Blind edges and joints
  • with crusher dust or sand

12
Final Result
13
Application
Bridge Joints
14
Application Cont.
Potholes
15
Application Cont. 2
Installation Nov. 2008 Bridge Deck Current
Oct.2009
16
Before and After Examples
Bridge Approaches
17
Before and After Cont.
  • Potholes

18
Possible Applications
Potholes
19
Possible Applications Cont.2
Potholes
20
Possible Applications Cont.3
Potholes
21
Conclusion
  • Several possible applications
  • Bridge Joints
  • Potholes
  • Wooden Bridge Surfacing
  • Constructability benefits
  • Inexpensive equipment for installation
  • Quickly Open to traffic
  • Basic principle of Waterproofing

22
Thank you
Write a Comment
User Comments (0)
About PowerShow.com