DCS MANUFACTURERS MEETING NOVEMBER 9, 2006 - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

DCS MANUFACTURERS MEETING NOVEMBER 9, 2006

Description:

This has provided a snapshot of the DCPR system performance. 3. DAMS-NT Channel Statistics. EIRP level relative to pilot. Signal to noise ratio, signal, noise ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 10
Provided by: peterw3
Learn more at: http://noaasis.noaa.gov
Category:

less

Transcript and Presenter's Notes

Title: DCS MANUFACTURERS MEETING NOVEMBER 9, 2006


1
DCPR Performance Data
  • DCS MANUFACTURERS MEETING NOVEMBER 9, 2006
  • Peter Woolner
  • Mitretek Systems
  • pwoolner_at_mitretek.org
  • 703-610-1724

2
DAMS-NT Records
  • On August 22/23, 2006, DAMS-NT collected 24 hours
    of signals for the east and west satellites
    (1704 to 1704)
  • Also west signals on the east satellite and east
    signals on the west satellite
  • This has provided a snapshot of the DCPR system
    performance

3
DAMS-NT Channel Statistics
  • EIRP level relative to pilot
  • Signal to noise ratio, signal, noise
  • Frequency offset
  • Phase noise
  • Received start and stop times, duration
  • DCP address, channel number, data rate

4
Summary of Uplink EIRP
All channels EIRP in dBmi relative to the Pilot
signal level
5
Number of Simultaneous Signals
6
Expansion of Previous Chart
7
Simultaneous Transmissions
8
East Channel Usage
9
West Channel Usage
Write a Comment
User Comments (0)
About PowerShow.com