Group Requirements Inspection - PowerPoint PPT Presentation

About This Presentation
Title:

Group Requirements Inspection

Description:

all team members participate in the inspection. follow the process (p 240) assign roles ... Work Product. Written document this Friday (26 May) main body ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 15
Provided by: cstu3
Category:

less

Transcript and Presenter's Notes

Title: Group Requirements Inspection


1
Group Requirements Inspection
  • Carefully Read Wiegers Ch. 14

2
Perform a Team Inspection
  • See p 238 Wiegers
  • all team members participate in the inspection
  • follow the process (p 240)
  • assign roles
  • prepare the materials
  • plan the meetings
  • use entry/exit criteria

3
The Technical Review Process
  • Pre-Review Activities
  • Review Meeting Activities
  • Post-Review Activities

4
Pre-Review Activities (Production team)
  • Prepare and make available the artifact to be
    reviewed
  • The design document (milestone 3 deliverable)
  • Supporting material (milestone 1 2 deliverables)
  • Call the meeting
  • Participants
  • Time and place
  • Identification of artifact to be reviewed
  • Agenda

5
Pre-Review Activities (Review team)
  • Inspect the artifact and note comments. Identify
  • Standards compliance
  • e.g., document structure (incl. cross-references,
    sign-offs etc.), possibility of validation,
  • Presentation quality
  • e.g., readability, clarity of information,
    well-definedness, completeness
  • Contents quality
  • Conformance does it satisfy all the
    requirements specifications
  • Structure is it technically satisfactory

6
Pre-Review Activities (Review team)
  • Prioritize the comments
  • High-impact
  • Low-impact
  • Identify action items
  • Write it up
  • Deliver it to the reviewed team
  • (to the instructor)

7
Defect reportFor each defect
  • Defect ID
  • Description
  • Procedure to reproduce
  • Platform info
  • Date identified
  • By whom
  • Severity
  • Phase
  • Date corrected
  • By whom
  • Effort (in staff hours)
  • Work product corrected
  • Resolution status
  • Notes

8
Review Meeting Activities
  • Review the artifact, not the team
  • Set an agenda, and maintain it
  • Limit debate and rebuttal
  • Identify problems, defer problem resolution
  • Use a recorder

9
Review Meeting Activities
10
Processing the meeting
11
Post-Review Activities
  • Analyze the comments
  • Determine course of action (action items)
  • and take it
  • File
  • the review report,
  • the minutes from the meeting(s),
  • the action items
  • their follow-up

12
Requirements validation
  • Define validation checklists
  • Are the requirements
  • Complete?
  • Consistent?
  • Comprehensible?
  • Precise?
  • Traceable?
  • Checkable?
  • According to standards?

13
Work Product
  • Written document this Friday (26 May)
  • main body
  • introduction to the inspection document
  • purpose, roles, dates
  • high level explanation of what happened
  • abstract the results and plans for remedies
  • include the defect reports
  • and notes that led to them in appendix (refd)
  • appendices with meeting announcements, plan, etc.

14
Preliminary Test Document
  • Due with final documents
  • Refer to Wiegers ch 14
  • conceptual test cases for each functional
    requirement
  • think
  • boundaries
  • zeroes
  • exceptions