Plans for Test Stand TBT Testing - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Plans for Test Stand TBT Testing

Description:

Plans for Test Stand TBT Testing. Examine different bandwidth and gain ... Set Greychip for minimum decimation. New Delay for 53 MHz Ensemble Settings ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 17
Provided by: beamsdi
Category:
Tags: tbt | plans | stand | test | testing

less

Transcript and Presenter's Notes

Title: Plans for Test Stand TBT Testing


1
Plans for Test Stand TBT Testing
  • Examine different bandwidth and gain
    configurations for TBT. Optimize for single
    bunch.
  • Examine settings for uncoalesced beam.
  • Test timing consistency of first turn of TBT
    trigger.

2
Raw Data from A3 System During Store
3
Raw Beam Signal vs Fake Beam
4
TBT Raw Data Conclusions
  • Beam signal rings filter for at most 16 samples
    of data.
  • Fake beam signal rings much longer due to
    electrical bounce on the trigger generator.
  • Minimum Greychip decimation is 16 samples.
  • Set Greychip for minimum decimation.

5
New Delay for 53 MHz Ensemble Settings
6
Greychip Gain Block Diagram
CFIR PFIR
CIC Filter
Digitizer Data
Coarse Gain
Output
Scale
NCO
7
Test Stand Ensemble Output for Different Shift
Settings
8
Shift 5 TBT Study
9
Shift 6 TBT Study
10
Coarse 2 TBT Study
11
Coarse 3 TBT Study
12
Gain Study Conclusions
  • Shift saturates after a setting of 6 bit shift.
  • Six bit shift shows irregularities in TBT data.
  • Same irregularities seen when changing coarse
    gain settings.
  • Saturation is downstream of CIC (CFIR or PFIR?)
  • Maximize gain in front of CIC. Reduce gain
    upstream for best frontend dynamic range.

13
TBT Final Settings
14
New Settings with Multiple Bunches
15
New Settings Looking at Beam (36x36)
16
First Look at Uncoalesced Beam
Write a Comment
User Comments (0)
About PowerShow.com