Cost guidelines Nick Mayer May 2002 - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Cost guidelines Nick Mayer May 2002

Description:

Survey reports should clearly identify the. location, extent, type and cost of work. ... Surveys should cover both capital and. revenue work in governing body ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 15
Provided by: isdn8
Category:

less

Transcript and Presenter's Notes

Title: Cost guidelines Nick Mayer May 2002


1
Cost guidelinesNick Mayer May 2002
2
Cost guidelines
  • March 2000 costs circular
  • per m2 guide costs
  • New primary 780
  • Primary extension 745
  • New secondary 698
  • Secondary extension 685

3
Cost guidelines
  • March 2000 costs circular
  • per m2 guide costs, updated
    Current
  • New primary 780 917
  • Primary extension 745 876
  • New secondary 698 820
  • Secondary extension 685 805

4
Cost guidelines
  • Future guidance
  • Secondary school cost project
  • Cost circulars

5
Amendments to AMP condition assessment guidance
  • Para 7
  • Survey reports should clearly identify the
  • location, extent, type and cost of work.

6
Amendments to AMP condition assessment guidance
  • Para 9
  • Surveys should cover both capital and
  • revenue work in governing body
  • repair programmes.

7
Amendments to AMP condition assessment guidance
  • Para 10
  • Surveys should be regularly updated. They
  • should be used by Authorities and schools in
  • the administration of their maintenance
  • programmes and the timing and accuracy of
  • updating should be appropriate to that use.

8
Amendments to AMP condition assessment guidance
  • Para 17
  • Temporary premises are buildings that are
  • designed to be relocatable, that is mobiles.

9
Amendments to AMP condition assessment guidance
  • Para 19
  • The condition of sub-elements should be
  • assessed using an appropriate category
  • system.
  • The condition categories of sub-elements need
  • not be aggregated to major elements.

10
Amendments to AMP condition assessment guidance
  • Para 27
  • Costs should not include for extending the
  • renewal of fabric beyond that which is
  • defective, except where there is a economic
  • case for carrying out the extended work at the
  • same time.

11
Amendments to AMP condition assessment guidance
  • Para 27
  • Costs should not include for layout
  • alterations, or alterations to the construction.

12
Amendments to AMP condition assessment guidance
  • Para 27
  • Costs should not include for extensions to
  • installations in buildings.

13
Amendments to AMP condition assessment guidance
  • Para 27
  • The total of preliminaries, contingencies and
  • professional fees, as an average percentage of
  • the balance of the costs, should be stated in
  • the data submission.

14
Amendments to AMP condition assessment guidance
  • Para 28
  • If there is a case for refurbishment,
  • adaptation, or rationalisation, this should be
  • considered in drawing together the strands of
  • premises assessment, rather than in condition
  • assessments.