WRC03 Nonplanned Services - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

WRC03 Nonplanned Services

Description:

... (or two) Agenda Item(s) dominated. Difficult and lengthy discussion on many of them. Selection of results subjective: present 4 weeks of. work in 20 minutes ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 23
Provided by: asi75
Category:

less

Transcript and Presenter's Notes

Title: WRC03 Nonplanned Services


1
WRC-03Non-planned Services
  • Presented by Avram Sion
  • avram.sion._at_itu.int
  • BR SEMINAR
  • GENEVA, November 2004

2
WRC-03
  • 50 AGENDA ITEMS !
  • - No single (or two) Agenda Item(s) dominated
  • Difficult and lengthy discussion on many of them
  • Selection of results subjective present 4
    weeks of

  • work in 20 minutes
  • Details during the Seminar

3
WRC-03
  • Decisions of general interest
  • Some examples

4
WRC-03
  • Appendix 4 Data items for submission under
  • various RR procedures
  • While consequential to other changes of RR,
    affects virtually ALL submissions
  • on Administrations side and on BR side

5
WRC-03
  • Appendix 4
  • BR had to adjust
  • - database (SNS) structure and contents
  • - filing software (capture, validation,)
  • - internal data processing software tools
  • - examination software tools
  • - IFIC and Special Sections publication tool

6
WRC-03
  • REGULATORY DEADLINES
  • API 2-year period to submit Coordination
  • Request remains unchanged (9.5D)
  • Major change - restart API for a change
  • (9.2) of orbital
    position by gt6o

  • (was gt12o)

7
WRC-03
  • REGULATORY DEADLINES
  • DATE of BRINGING into USE (DBiU) 11.44
  • - 7 years, API Rxgt21.11.1997 (was 5 2 years
  • of extension under specified
    conditions)
  • - remains 9 years, API Rx lt22.11.1997 (from

  • publication)

8
WRC-03
  • REGULATORY DEADLINES
  • Consequential DUE DILIGENCE (Resolution 49)
  • 7-year cases
  • - before the expiry of 7-year period
  • - BUT, if NOTIFIED before, then at DBiU
  • 9-year cases by 21.11.2004 (was 21.11.2003)
  • or by DBiU if earlier

9
WRC-03
  • REGULATORY DEADLINES
  • NOTIFICATION (11.44.1) No change
  • - by the end of 7-year period, or
  • - by the end of 9-year period (as applicable)

10
WRC-03
  • APPLICABLE RR (7.4A)
  • Those in force at the date of submission under
  • particular procedure (Coord,
    Notif)
  • Coord requirements established under criteria
    valid at the date of Coord request remain valid
  • If criteria become more sensitive - no change
  • of Coord
    requirements at Notif
  • If criteria become less sensitive relaxation at
  • Notif (but the Admin to indicate
    difference)

11
WRC-03
  • APPLICABLE RR (7.4A)
  • If a Form of Coord removed between Coord and
    Notif will not be required at Notif
  • BUT, if a Form of Coord ADDED between
  • Coord and Notif WILL BE REQUIRED

  • at Notif !

12
WRC-03
  • COORDINATION (9.6.3)
  • Coordination under particular sharing situation
    of 9.7 to 9.21 is not applicable when limits for
    that sharing situation exist elsewhere in RR
  • E.g Where hard PFD limits exist to protect
    Terrestrial services, coordination with
    Terrestrial services is not needed under 9.11,
    9.14 or 9.21/C

13
WRC-03
  • RESOLUTION 900
  • To reduce Backlog, RRB adopted RoP to not examine
    assignments against hard limits, give
    qualified favourable finding (B)
  • WRC-03 decided to return to full examination
  • - BR to establish compliance of assignments with
    B-finding against hard limits, without
    re-establishing findings

14
WRC-03
  • RESOLUTION 900
  • - BR did, results for 800 networks published in
    Circular Letter CR/207 in March 2004
  • - At Notification, full finding for Coord will
    first be established if favourable, Notif will
    be examined if unfavourable, Notif will be
    returned to the Administration

15
WRC-03
  • RNSS
  • (Radionavigation Satellite Service)
  • High interest by some administrations
  • WRC-03 added allocation in the bands
  • 1164-1215, 1260-1300 and 5010-5030 MHz

16
WRC-03
  • RNSS
  • (Radionavigation Satellite Service)
  • High interest by some administrations
  • WRC-03 added allocation in the bands
  • 1164-1215, 1260-1300 and 5010-5030 MHz
  • Shared with ARNS
  • (Aeronautical Radionavigation
    Service)

17
WRC-03
  • RNSS
  • ADD 5.328A, 5.328B, 21.18, Res. 609, Rec. 608
  • To protect ARNS, EPFD level produced by all space
    stations of all RNSS systems shall not exceed
    121.5 (dBW/m2) in 1MHz band
  • Mechanism Resolution 609, consultation meeting,
    ensure limit is not exceeded, share the allowance
    and prevent a single system using it up completely

18
WRC-03
  • BSS at 2.6 GHz
  • (MOD 5.416) No big change, 2520-2670 MHz
  • MOD 5.418 2630-2655 MHZ, 5 Admins, hard
  • PFD limits,
    coordination under
  • 9.11 within 1500 km
    out of
  • national territory,
    separate hard
  • limit over RUS in this
    area
  • ADD 5.417A 2605-2630 MHz, 2 Admins,
  • similar arrangement as
    above

19
WRC-03
  • BSS at 2.6 GHz
  • MOD Res.539 Non-GSO at 2605-2655 MHz,
  • PFD mask for arrival
    angle 0-90o
  • Arrival angle lt76o, explicit
  • agreement if PFD above
    the limit
  • Arrival angle gt76o, 9.11 Coord

20
WRC-03
  • FSS at 13.75-14 GHz
  • MOD 5.502 Minimum Earth Station diameter
  • reduced to 1.2 m, for
    GSO
  • ADD 21.13A Off-axis EIRP density limits
  • MOD 5.503 On-axis EIRP depends on
  • diameter
  • (at low end of
    13.75-14 GHz)

21
WRC-03
  • Amended PFD Limits of Article 21
  • (Table 21-4)
  • E.g 1518-1525 MHz, for MSS (Allocation
  • extended to
    Regs 1 and 3)

22
WRC-03
  • Questions ?
Write a Comment
User Comments (0)
About PowerShow.com