ITAR Requirements - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

ITAR Requirements

Description:

... subcontractor for repair or replacement without obtaining an export license ... Don't take chances with ITAR. Approved for Public Release ... – PowerPoint PPT presentation

Number of Views:3186
Avg rating:3.0/5.0
Slides: 13
Provided by: gdeb
Category:

less

Transcript and Presenter's Notes

Title: ITAR Requirements


1
ITAR Requirements
Approved for Public Release
2
Summary
  • ITAR - What is ITAR?
  • Most of EBs Parts and Components fall under USML
    Category VI
  • ITAR Sec. 121.1, Cat. VI
  • Special Care and Handling Required (NNPI)
  • Does ITAR Apply to Me?
  • Common ITAR Violations
  • Penalties for ITAR Violations
  • Qualifying to Do Business With EB
  • Dont Get Lost Trying to Go It Alone

Approved for Public Release
3
ITAR International Traffic in Arms Regulations
  • The ITAR is a set of US government regulations
    that control the export and import of
    defense-related articles and services and
    technical data on the United States Munitions
    List (USML). http//www.pmddtc.state.gov/docs/itar
    /2007/itar_part_121.doc
  • These regulations implement the provisions of
    the Arms Export Control Act, and are published in
    in Title 22 (Foreign Relations), Chapter I,
    Subchapter M of the Code of Federal Regulations.
  • The Department of State interprets and enforces
    ITAR. Its goal is to advance national strategic
    objectives and U.S. foreign policy via the trade
    controls.

http//www.pmddtc.state.gov/consolidated_itar.htm
Approved for Public Release
4
Cat. VI of the USML (U.S. Munitions List)
  • Cat. VI includes Vessels of War and Special Naval
    Equipment and applies to most EB Components
  • If you provide, manufacture or repair a
    specifically designed or modified component,
    part, accessory, attachment and/or associated
    equipment for EBs submarines, you are
    handling an ITAR-controlled defense article.
  • The article and all corresponding documentation
    (written instructions, specifications, drawings
    in any format) or technology (information
    pertaining to design, production or manufacture)
    is export controlled.

Approved for Public Release
5
Special Care and Handling Required .
  • What is NNPI ?
  • Naval Nuclear Propulsion Information
  • ITAR Part 122 Category VIVessels of War and
    Special Naval Equipment.
  • (e) Naval nuclear propulsion plants, their land
    prototypes, and special facilities for their
    construction, support, and maintenance. This
    includes any machinery, device, component, or
    equipment specifically developed, designed or
    modified for use in such plants or facilities.

Approved for Public Release
6
Does ITAR apply to me?
  • Are you a manufacturer or exporter of a defense
    article?
  • Do you provide, manufacture or repair a
    specifically designed or modified component,
    part, accessory, attachment and/or associated
    equipment for EBs submarines?

If you answered Yes, you must be aware of ITAR
requirements!
Approved for Public Release
7
When Does ITAR Become an Issue?
  • Do you have foreign national employees working at
    your company?
  • Do you have a technology control plan?
  • Do you utilize foreign companies for parts,
    components or services in relation to articles or
    services provided to EB?
  • Do you have a FOCI (foreign ownership, control or
    influence) issue?

Approved for Public Release
8
Common Examples of ITAR Violations
  • A manufacturer of a defense article is not
    registered with DDTC (Directorate of Defense
    Trade Controls)
  • An EB supplier permits a non-US national employee
    to handle a defense article or view information
    concerning a defense article
  • Placement of pictures or technical information
    about a defense article on your company website
  • Emailing technical specification changes to an EB
    engineer via the internet
  • Shipping an article in whole or in part to a
    foreign subcontractor for repair or replacement
    without obtaining an export license
  • Calling a foreign subcontractor for design,
    manufacturing or other technical assistance
    regarding a defense article without obtaining an
    export license

Approved for Public Release
9
Penalties for ITAR Violations
  • Criminal penalty for willful violation Up to
    1M per violation for corporations, Up to 1M per
    violation for individuals and up to 10 yrs in
    jail
  • Civil penalty for any violation up to 500k per
    violation for individuals and/or corporations
  • Seizure or forfeiture of goods
  • Debarment from licensing and/or government
    contracting
  • EB cannot do business with a debarred party!!

Approved for Public Release
10
Qualifying to Do Business with EB
EB uses these forms to ensure that recipients of
our technical data are qualified to receive it.
  • EB FOCI (Foreign Ownership, Control or Influence)
    Certification - Tells us about your company and
    whether we can do business together
  • DDTC (Directorate of Defense Trade Controls)
    Registration Is your company eligible to
    manufacture and export defense articles?
  • http//www.pmddtc.state.gov/registration.htm
  • DLIS-JCP (Defense Logistics Information Service
    Joint Certification Program) Certification (DoD
    Form 2345) -Is your company a qualified US
    contractor or subcontractor ?
  • http//www.dlis.dla.mil/jcp/faq.asp
  • TCP/ACP (Technology Control Plan/Access Control
    Plan)- Does your company have a robust technology
    control plan to protect our sensitive
    information?
  • http//www.dss.mil/isp/foci/sample_tech_con_plan.h
    tml
  • Is your company foreign owned or managed?
  • http//www.dss.mil/isp/foci/foci_mitagation.html

Approved for Public Release
11
Dont get lost trying to go it alone
  • SIA (Society for International Affairs)
    Conferences
  • Training of in-house staff in import/export
    compliance
  • http//www.siaed.org/
  • Export Consultants
  • For companies that lack sufficient in-house
    resources

Approved for Public Release
12
Questions
  • If you or your company have any questions
    regarding requirements of ITAR
  • Seek help from your companys Legal
    Representation

Dont take chances with ITAR
Approved for Public Release
Write a Comment
User Comments (0)
About PowerShow.com