IOU Pilot Programs 20092011 - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

IOU Pilot Programs 20092011

Description:

Requested amount does not include budget for City of San Jose and Smart AC pilots ... Should there be a final pilot report upon completion of project? Who gets these? ... – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 11
Provided by: dano168
Category:
Tags: iou | admin | and | city | details | final | of | pilot | programs | smart

less

Transcript and Presenter's Notes

Title: IOU Pilot Programs 20092011


1
IOU Pilot Programs 2009-2011
2
IOU Pilot Programs 2009-2011 Summary
  • Decision 07-12-051
  • Encourages innovation in energy efficiency
    programs for LIEE
  • Utility Number Amount
  • PGE 9 Pilots 2,320,000
  • SCE No pilots -
  • SoCalGas 1 Pilots 725,000
  • SDGE 2 Pilots 375,000
  • Total 3.42 Million

Requested amount does not include budget for
City of San Jose and Smart AC pilots
3
IOU Pilot Programs 2009-2011
  • General Observations
  • Lack of oversight/follow-through for past pilots
  • Difficult to envision appropriate budget details
    (Breakout of material costs, admin,
    evaluation, etc.)
  • Process for implementing results unclear
  • Division of Ratepayer Advocates (DRA)
  • Recommends that each pilot proposed in the
    Applications be required to submit an
    accompanying evaluation plan before the pilot is
    approved.

4
IOU Pilot Programs 2009-2011
  • ALJ Thomas Second Ruling
  • Is information produced in pilot LIEE programs
    and/or implemented new measures shared among the
    IOUs?
  • How are the pilots assessed?
  • How are the results of the pilots communicated to
    other parties?
  • What information is used to determine if a pilot
    should become a new program element/measure?

5
IOU Pilot Programs 2009-2011
  • IOU Responses
  • Information produced in pilots and from new
    measures is shared among IOUs
  • Pilots/New measure implementation is dependent on
    each individual IOU situation
  • Purpose of pilots is to test feasibility and
    savings of new initiatives in a controlled manner
    before full program implementation
  • Key components of pilot evaluation include
  • Energy savings achieved
  • Costs of purchase and installation
  • IOUs are open to participation by interested
    parties and CPUC during evaluation phase of pilot
    programs

6
IOU Pilot Programs 2009-2011
  • Todays Goal
  • Discuss basics of pilot design
  • Review reporting requirements
  • Discuss evaluation process and criteria for
    measuring success
  • Elaborate on process for inclusion of pilots in
    future LIEE program efforts.

7
Pilot design
  • How should budgets be displayed and broken down?
  • Should there be a timeline and benchmarks
    designated, and if so, what does this look like?
  • Currently introduced in Budget Applications
    What about mid-cycle?

8
Reporting requirements
  • Currently Annual Reports
  • Lack specifics
  • Other updates
  • Should there be a final pilot report upon
    completion of project? Who gets these?
  • Should this type of reporting be standardized
    across the IOUs?

9
Evaluation process and criteria for measuring
success
  • Current evaluations
  • Energy savings / cost
  • Is this the only metric for success?
  • What venue should be used for evaluation?
  • Individual ME performed by IOU
  • Individual ME performed by outside contractor
  • Impact Assessments

10
Inclusion/exclusion for LIEE Program
  • When is this decided and by who?
  • What venue is best for communicating updates and
    changes?
  • Budget Applications, Annual Reports, etc.
  • How will other IOUs incorporate this?
  • Alternative media for dissemination?
  • Website, newsletters, etc.