Gas leak tests. 1. Pre-installation tests - Thresh. Scan ( Noise ... In the optimistic planning with the pre-installation tests rate of 5 chambers per day, ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 17
Provided by: cern74
Category:
Tags: chambers | gas | lhcb | ray | rich1 | thresh

less

Transcript and Presenter's Notes

Title: LHCb


1
  • LHCb

2
LHCb
LHCb
3
MWPC production at PNPI
Production at PNPI-1 is finished. Production
at PNPI-2 is finished. )The last transport
to CERN is arriving November 28, 2006 with 70
M4R4.
4
MWPC preparations at CERN
Preparation Phase 1
Preparation Phase 2
5
(No Transcript)
6
  • MWPC preparations at CERN

7
Preparation Phase 2
Pre-installation Test Stand
5 chambers can be tested simultaneously with
the rate of 5 chambers per day
8
(No Transcript)
9
Cosmic Ray Counts from Internal Counters. Thresh
15fC. GapA in 5 chambers.
Chambers M4R4 53, 54, 55, 56, 57 Run198
2550_0_0_0 100 sec
10
(No Transcript)
11
Construction Status
LHCb Spectrometer
OT
Muon System
Magnet
RICH1
VELO
RICH2
Calo. System
TT
12
IP8 Now
IP8 now...
RICH-2
SPD
OT
Mu-system
PS
13
(No Transcript)
14
(No Transcript)
15
Muon wall preparation
16
Further planning
  • In the optimistic planning with the
    pre-installation tests rate of 5 chambers per
    day,
  • all 600 chambers could be ready for
    installation
  • by the end of May,2007
  • However, there will be still problems with
    additional conditioning of the chambers ,repairs
    etc that may require
  • some additional time
  • HV-System for 4000 channels