Title: Automatic Meter Reading


1
Automatic Meter Reading
Hunt?
SpreadSprectrum?
Turtle?
RF?
RJ11?
Archnet?
Nexus?
BPL?
Cellnet?
AI?
Maxstream?
TWACS?
SilverSpring?
Fiber?
Wireless?
MasterMeter?
FireFly?
Intranet?
TCP/IP?
IR?
PLC?
Internet?
WiFI?
RS232?
  • Selecting the Technology

Dave Hallquist Vermont Electric Cooperative
2
Why Do AMR?
  • Billing and Meter Reading Benefits
  • Reduce Meter Read Costs
  • Reduce Error
  • Eliminate Entry Liability
  • Eliminate Member Complaints about Meter Readers
  • Improve Billing Flexibility
  • Improve Financial Predictability
  • Reduce HR issues

3
Other AMR Benefits
  • Carefully select the technology, there is more to
    AMR than reading meters.

4
Rates
  • Rate Setting has been more of an art than a
    science
  • AMR allows detailed analysis of peak demands
    critical to setting rate structures by class
  • Reduces the tension between residential
    commercial and industrial
  • As Vermont Public Interest Research Group has
    charged The poor residential ratepayers are
    subsidizing big business!

5
System Planning
  • System load studies often use gross assumptions
    (i.e. 1.1kw/home). This can result in
    substantial errors as VEC has found certain
    substation residential home loads are
    significantly higher, while others are
    significantly lower
  • Unusual spot load growth have caught utilities by
    surprise
  • R-T AMR provides the local data to significantly
    improve the accuracy of system planning

6
Load Control
  • Many systems provide optional load control
    packages
  • R-T AMR enables verification of load control
  • R-T AMR enables significant flexibility in load
    control
  • By using a greater number of shorter off times,
    member satisfaction with load control programs is
    markedly improved

7
Phase Balancing
  • Phase loading is typically done once in a
    lifetime on many systems
  • Retro versus pro-active
  • AMR shows what phase each meter is on
  • Results
  • Better system balancing
  • Improved transformer efficiency
  • Greater safety for line personnel

8
Voltage Profiles
  • R-T AMR allows flexibility in time buckets for
    analyzing member issues
  • Accurate voltage analysis' can identify
    connectivity issues
  • Improved member satisfaction (implicit versus
    explicit needs)
  • Identify voltage sag issues
  • I-D neutral problems early to prevent member
    equipment failure (burn out resulting from
    excessive voltage)

9
Voltage Profile
10
Voltage Profile
11
Load Profile
  • R-T AMR allows flexibility in time periods for
    profiles
  • Good for managing high bill complaints
  • Commercial and Industrials can use system to
    reduce peak demand charges

12
Load Profile
13
(No Transcript)
14
Transformer Sizing
  • AMR transformer studies reveal sizing issues
  • Prevents transformer failures due to members
    lack of planning
  • Correct transformer sizing reduces line loss
    cost
  • Elimination of electric heat left many
    transformers oversized

15
Load Profile for Transformer
16
Distribution Automation
  • R-T AMR infrastructure can often be used for
    SCADA
  • Many companies have interfaces for SCADA
    equipment
  • AMR communications is lower cost than dedicated
    (fiber, copper, radio)

17
Outage Restoration
  • R-T AMR is a very powerful tool when combined
    with an Outage Management System (OMS) and
    Interactive Voice Response (IVR) system
  • Predictive feature of OMS eliminates need for
    ticket sorting
  • IVR reduces call volume by 80 with significant
    improvements in member satisfaction
  • Combined with Map Presentation program (Mapview,
    Arcview) provides dispatch with visual outage
    tracking
  • Eliminates need to call member to verify outage
    has been restored

18
Connect and Disconnect
  • R-T AMR allows for soft disconnect without
    additional infrastructure
  • Great for move in / move out
  • Disconnect devices available for many product
    platforms
  • Devices are plug-in underneath the meter
  • Allows for disconnect from the office

19
Load Controlat Florida Powerand Light (FPL)
Load Control Device Mounted to control a Water
Heater and an Air-Conditioner at a Florida Power
andLight (FPL) CustomersHome
20
(No Transcript)
21
Billing
  • Significantly improves billing predictability
  • Eliminates ties to read schedules that are based
    on meter routes
  • Reduces outstanding receivables by reducing
    billing lead-time
  • Virtually eliminates mis-reads and requisite
    member revisits
  • Allows for industrials/commercials to close
    monthly books earlier

22
Time of Use (TOU) Billing
  • R-T AMR simplifies TOU reading and billing
    process
  • Allows for multiple TOU rates
  • Load shifting a good strategy for reduction of
    system coincident peaks thus reducing power
    supply cost
  • Allows for tailored incentive programs
  • Many utilities have reduced system peak by 10

23
Customer Service
  • No longer tell member to check the meter
  • Find out about outage before member calls
  • No need to call member to verify restoration
  • With IVR and OMS, member can get outage status
    anytime
  • Turn Customer Service Reps into usage experts
    through usage profile
  • Make the moving process easy for your members
  • Minimize the hand-offs to improve the member
    experience

24
Potential R-T AMR Savings
25
VEC ROI Analysis
26
VECs Choice
  • DCSI TWACS for all but the largest users
  • Electro-Industries Nexus for Large users (gt500kw)
    and substations
  • Why TWACS?
  • DCSI had significant experience and a variety of
    options
  • Very good references
  • Outage Monitoring and Reporting
  • Ability to ping on demand
  • Integrates with many CIS and Billing Systems
    including NISC

27
VECs Choice (cont)
  • Why Nexus?
  • Built-in web server
  • Dual ports for maximum security
  • On-demand usage, billing, history
  • Transient Recording
  • Record up to 512 Samples per Cycle Peak
  • Voltage Surge and Sag Recording
  • EN 50160 Flicker Analysis
  • Interharmonic Recording
  • Fault Recording and Analysis
  • Harmonic Analysis to 255th Order
  • DNP 3.0 and Modbus capability

28
What Worked
  • Organization was committed
  • Four years of discussion created a high level of
    desire from everyone
  • Board of Directors was involved in these
    long-ranging discussions
  • Detailed project planning
  • Microsoft project used to identify every action
    item
  • Weekly status/action meetings for six months
    prior to commissioning
  • Project Manager and CFO co-own project
  • Operations really wanted AMR
  • TWACS a great product - Commissioning was highly
    successful and exceeded all expectations

29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
(No Transcript)
35
(No Transcript)
36
(No Transcript)
37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
(No Transcript)
50
(No Transcript)
51
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com