Dane County DEIS released in 1995 ... 'Last Great Place' by Nature Conservancy. National Natural Landmark ... development rights in Dane and Sauk Counties ... – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 32
Provided by: toml4
Category:

less

Transcript and Presenter's Notes

Title: Secondary Effects USH 12 Experience


1
Secondary EffectsUSH 12 Experience
  • Dane and Sauk Counties
  • Wisconsin

2
History
Sauk City
12
60
  • DOT wanted to improve a 2-lane rural roadway
    radiating from the Madison Metropolitan Area to a
    4-lane expressway (Dane County)

151
18 Mile Project Corridor
14
Middleton
94
Madison
18
12
18
151
90
39
Fitchburg
51
14
  • Went through an extensive public/agency
    involvement process 1991 to 1995
  • Study committees with governments and agencies
    (before they were popular)
  • Project scoping meetings
  • Township coordination meetings
  • Public Involvement Meetings
  • Interaction with ALL agencies

3
History
  • Focus of concern was agricultural impacts to this
    corridor lined with dairy farms.
  • Because of this, on-alignment alternatives were
    favored to reduce farm severances

4
History
  • 1993 Ho-Chunk Bingo Hall lies on USH 12
  • 2 miles south of Interstate 90/94
  • 20 miles north of Sauk City
  • 40 miles north of Madison
  • 1993 Changes in legislation allow Bingo Hall to
    convert to Casino
  • Traffic Volumes Dramatically Increase

5
History
  • 1994 DOT initiates EIS for 11 mile portion of USH
    12 south of interstate (Sauk County)
  • Leaves an 11 mile segment of unimproved roadway
    between two projects
  • 1995 DOI letter cites segmentation
  • DOT answers by including impacts of whole
    corridor in the EIS for both projects
  • Even for roadway portion not going to be improved
    for 20 years

6
Background
  • Dane County DEIS released in 1995
  • Almost all supported a four-lane improvement on
    existing alignment
  • Sauk County DEIS released in 1996
  • 5 different alignments investigated, both on and
    off-alignment

7
History
  • Baraboo Range National Natural Landmark!!!!
  • Quartzite Range
  • 27 miles long
  • 14 miles wide
  • South Range
  • Largest block of unfragmented forest in the
    Mid-west

8
(No Transcript)
9
History
1
2
4
3
5
10
History
  • Clear-cut in early 1900s
  • Steep slopes and rocky soils limited agricultural
    use
  • Steep slopes and rocky soils limited septic
    systems
  • Lack of development allowed reforestation
  • Home to many TE species (particularly
    neo-tropical birds
  • Last Great Place by Nature Conservancy
  • National Natural Landmark
  • Most of land still privately owned

11
History
  • New secondary effects concerns
  • With a four-lane roadway BRNNL more attractive
    to live in for Madison commuters
  • A regulatory agency asked for quantitative
    analysis of how improvement would affect BRNNL
  • How many new commuters (2nd Effect)
  • How many locate in BRNNL (2nd Effect)
  • How the new households would affect TE species
    (3rd Effect)

12
History
  • DOT promptly started a review
  • (Project on Fast Track)
  • Three quantitative analysis started
  • Gravity-type
  • Commuter Shed Review
  • Highway Type vs. Community Growth
  • Resulted in Increasing DOA projections
  • Qualitative review of effects to TE species also
    initiated

13
Gravity-type Model
14
Commuter Shed Analysis
15
Change in DOA Projections
54 more population growth than projected
16
History
  • 167 acres of more residential development in
    BRNNL
  • 28 caused by highway improvement
  • 120 page analysis listed in SDEIS
  • Allocated development to areas most susceptible
    to development to determine effect to TE species

17
History
18
History
  • Agencies were skeptical
  • Believed effects would be much greater
  • EPA threatened an EU rating
  • EPA commissioned their own study from Argonne
    Labs
  • Argonne Report extremely critical of quantitative
    methods used
  • Report seemed to advocate more rigorous use of
    Gravity Model (emphasis on commuters)
  • Criticisms of qualitative analysis to TE species
    were modest

19
History
  • DOT responded
  • Review of historical changes in land use in the
    BRNNL
  • Supplemental quantitative analysis focusing on
    Gravity model.
  • Released a Supplemental DEIS for Sauk county USH
    12

20
History
  • Historical Land Use change in BRNNL
  • (From Satellite photographs)

Forest Interior Actually Increased from 1962 to
1992!
21
History
  • Supplemental Gravity Analysis
  • 12 different models performed
  • All indicated a change in commuters of 13 to 28
    more commuters from BRNNL due to improved highway
    times
  • Agencies (DATCP) critical of analysis
  • Said it only considered effect of commuter, and
    not local growth

22
USH 12 MOA
  • Phased Construction in Dane County
  • 1999 Preliminary work only
  • 200-2001 Construct northern portion
  • 2002-2003 Grading, no pavement in southern
    portion
  • 2004 Construction of Middleton Bypass

23
USH 12 MOA
  • Access Control and Adjoining Land Divisions
  • 30 fewer access points as compared to current
    roadway
  • 500 foot control of access along local roads
  • 1000 foot control of access along State and
    County roads

24
USH 12 MOA
  • Commuter Rail/Transit Alternatives Study to be
    completed
  • Fund 50 of PE for locally preferred alternative
    for commuter rail/transit study.
  • Secondary Land Use Impact Methodology
  • Survey state of art modeling techniques
  • Provide guidelines for use of models
  • Identify improvement needed in models

25
USH 12 MOA
  • BRNNL Protection Fund
  • 5 million for purchase of land or development
    rights in Baraboo Range
  • Legislature not amused, passed bill that
    development rights can only be purchased within ½
    mile of highway Right-of-Way
  • Preservation outside BRNNL
  • 5 million for development rights in Dane and
    Sauk Counties
  • Local Planning Assistance

26
USH 12 MOA
  • Ice Age National Scenic Trail
  • Grade Separated Crossings
  • Transportation Enhancement aid
  • Play nice together provisions
  • Meet biannually to discuss status of MOA
  • One original signer left, considers himself to be
    the conscious of the MOA

27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com