Tagout Users Manual - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

Tagout Users Manual

Description:

... equipment, ship systems for decommissioned ships and during new construction. ... This process may be used for decommissioned ships. ... – PowerPoint PPT presentation

Number of Views:1277
Avg rating:3.0/5.0
Slides: 6
Provided by: mmcspan
Category:

less

Transcript and Presenter's Notes

Title: Tagout Users Manual


1
Tag-out Users Manual
Appendix C - Repair Activity Tag-outs
2
Repair Activity Tag-outsPurpose
  • The purpose of this appendix is to provide a
    procedure for a RA to perform tag-outs on ship
    support systems, shipboard test equipment, ship
    systems for decommissioned ships and during new
    construction.

3
Repair Activity Tag-outsApplicability
  • This process shall be used for ship support
    systems and test equipment connected to the
    reactor plant under the operational control of
    the RA.

This tag-out process shall not be used for
support systems and test equipment that are
connected to the reactor plant and are
transferred to Ships Force operational control.
  • This process may be used for ship support systems
    and shipboard test equipment under the
    operational control of the RA that are not
    connected to the reactor plant.

4
Repair Activity Tag-outsApplicability
  • This process may be used for ship support systems
    and shipboard test equipment under the
    operational control of the RA that are not
    connected to the reactor plant.
  • This process may be used for decommissioned ships.
  • An MOA will be issued, if needed, to cover
    special cases where Ships Force participation in
    tag-outs on systems and equipment not under the
    operational control of Ships Force is desired.

5
Repair Activity Tag-outs
  • When a RA tag-out process is used
  • Qualified RA personnel will perform the Ships
    Force tag-out roles described in this manual.
  • Since a representative of the RA acts as the
    Authorizing Officer, the RA Representative blocks
    shall be left blank.
  • On commissioned ships, the RA shall maintain a
    separate tag-out log, which will be made
    available for Ship's Force review.
  • The RA shall audit the tags and tag-out log.
Write a Comment
User Comments (0)
About PowerShow.com