Title: Goals and plans for Grid Data Warehouse


1
Goals and plans forGrid Data Warehouse
  • Guy Rixon
  • AstroGrid Consortium meeting
  • 3-4 November 2003

2
AstroGrid goals
  • Data warehouse
  • Concentrate catalogues in one DB
  • Therefore solve distributed-join problem
  • Allow users to add tables to DW.
  • Exploit UK e-Science Grid.
  • OGSI at arms length
  • Exploit OGSI.
  • Dont rely on OGSI in critical places
  • Use OGSI/OGSA in leaf node services.
  • See separate grid-tech talk at this meeting.

3
GDW goals
  • Use pure grid sites and resources
  • Dont require astro software at grid sites.
  • Use OGSA-DAI as remote interface to DB.
  • Use job-manager services?
  • Translate VObs ? grid in A/G web-service.
  • Support basic DW operations
  • Query preloaded catalogues
  • Add user catalogues
  • Allow query results to stay in DB for later
    queries

4
Design
  • See wiki web, keyword GdwDesign.
  • See http//astrogrid.ast.cam.ac.uk/javadoc/
  • but following detailed material hadnt made it
    to the web at the time of presentation model
    inside IDE. (Will probably be on the web when
    this presentation is archived.)

5
Iteration 4 planning (1)
  • Pre-loaded data-sets
  • 2MASS catalogues
  • XMM1
  • USNOB1
  • FIRST catalogue
  • INT-WFC catalogues
  • FIRST is first because its small.

6
Iteration 4 planning (2)
  • Do use cases SynchronousQuery and
    AsynchronousQuery for one catalogue by middle I4.
  • Do above for all data-sets by end I4.
  • Try to do either LoadEndUserDataSet or
    AsynchronousQueryIntoTable by end I4.

7
Iteration 4 planning (3)
  • Develop at Cambridge.
  • Deploy copy to Leicester.
  • If possible, deploy copy of back-end to UK
    e-Science grid, possibly at NeSC/EPCC.