Title: Budgets
1- Budgets Projects Forum
- April 25, 2006
2Agenda
- Overview
- University Budgets
- Endowment
- Energy
- Capital Projects
- Q A
3The Resource Perspective
4Financial Performance Overview FY 1995, FY 2006,
FY 2012
5Resources Building Blocks
- Generally Positive Economy
- Successful Completion of 470M Capital Campaign
- Supportive Community
- Experienced and Collegial Leadership
- Talented Staff
- Clear Organization and Responsibility Structure
- Effective Information Systems
- Policies and Procedures
- Master Plans University, Major Program Areas
and Assets - Financial Planning Model and Integrated Plan
6 7FY 2006 Operating Revenues
Where Does it Come From?
8Where Does it Go?
9Where Does it Go?
10FY 2006 FY 2007 Budget Assumptions
11 12Beginning Year Market ValuesFY 1995 FY 2006
ENDOWMENT BEGINNING YEAR MARKET VALUES (M)
13Annual Endowment Total Returns
YTD
14Endowment Draw for Operations
BASED ON 3-YEAR AVERAGE MARKET VALUE
Goal Sustainable draw at 5 or less (historical
average total return CPI)
(budgeted)
15Gifts Added To Endowment vs. Draw for
Operations(M)
16 17Utilities Consumption - Main Meters
Includes gas and oil consumed for central
heating plant.
18Energy Savings Program FY 05 06 Implemented
and Planned Energy Conservation Measures
19Energy Savings Program
- Energy prices have been unstable during FY06
- FY06 utility expenses projected at 13M
- Recommended FY07 utility budget is net of
projected 1M in reduced costs resulting from
Energy Savings Program - Spent 1.4M on energy savings projects since FY
2005
20 21FY 2006 Projected Capital Expenses and FY 2007
Preliminary Capital Budget
22Major Current and Planned Projects
23Science Complex Renewal ProjectPreliminary
Schedule
24(No Transcript)
25Science Complex Renewal Project
- Phases 1 and 2 Schematic Design (SD) nearly
complete - Final programmatic decisions by Provost being
incorporated - Pricing of SD to begin May 5
26Science Complex Renewal ProjectCross Section of
Phase 1 Building
27Science Complex Renewal Project
- Phases 1 and 2 Schematic Design (SD) nearly
complete - Final programmatic decisions by Provost being
incorporated - Pricing of SD to begin May 5
28Heller School Schneider BuildingArchitects
Rendering
29Schneider Building, Heller School View of Main
Entrance
4/19/06
3/17/2006
30Schneider Building, Heller SchoolView of Forum
4/19/06
3/13/2006
31Schneider Building, Heller SchoolArchitects
Rendering of Forum
3/13/2006
32Heller-Brown Renovation
- Renovation scope to include
- Code-work
- Complete mechanical upgrade
- New classrooms
- Conference rooms
- Graduate student carrels
- GIS lab
- Offices
- Replacement and addition of furnishings
33Infrastructure Renewal Project
- Infrastructure Renewal Project largely complete
- Remaining elements include
- Second phase of the campus signage program
- New electric substation
34Edmond J. Safra Center for the Arts
- Schematic design by Bruner/Cott nearing
completion - Based on programming work
- Coordination with campus master plan
35Edmond J. Safra Center for the Arts Both Phases
- Siting study
- Constraints include wetlands, Rose Art, Spingold,
and important pedestrian path to IBS - Phasing options study
- Phase 1 23,000 SF, east of Pollack
- Future Phase 2 south of Phase 1, linking to
Goldman-Schwartz
36Edmond J. Safra Center for the Arts
- Schedule
- Schematic design expected to be complete by end
of May - Start of construction anticipated in early 2007
- Occupancy of Phase 1 building for fall 2008
semester
37New Ridgewood Residence Hall
- New residence hall to occupy existing Ridgewood
Quad site - Planned apartment style housing to provide 250 to
300 beds - Consultant Biddison Hier assisted University in
initial programming - Architect William Rawn engaged, initially for
Pre-Design Cost Control workshops
38Old South Street Project
- Two parcels acquired by University, adding 2/3
acre to Universitys existing 1-1/4 acres - With Old South St. and land on. opposite side of
street, site is 4 acres. - Renovation to be completed, to provide new home
for Rabb School and BOLLI. - Removal of MEU from Chapels Field
39 40Brandeis Web Pages
- Executive Vice President/Chief Operating Officer
(www.brandeis.edu/evpcoo/) - Budget (www.brandeis.edu/budgetandplanning/)
- Business Conduct Policy (www.brandeis.edu/evpcoo/)
- Facilities Services (www.brandeis.edu/facilities/)
- Financial Affairs (www.brandeis.edu/financialaffai
rs/) - Human Resources (www.brandeis.edu/humanresources/)
- ITS (http//lts.brandeis.edu)
- Capital Projects (www.brandeis.edu/capitalprojects
/) - Public Safety (www.brandeis.edu/departments/public
_safety/)