Final Focus optics for Possible New BLine - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

Final Focus optics for Possible New BLine

Description:

will lead to minor lengthening of overall beamline ... If the shield wall remains, need to lengthen beginning of FF (will also help to ... – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 24
Provided by: ThomasWMa9
Category:

less

Transcript and Presenter's Notes

Title: Final Focus optics for Possible New BLine


1
Final Focus optics for Possible New B-Line
  • A. Seryi, P. Emma, R. Erickson, T. Fieguth, M.
    Hogan, et al.
  • 4 October 2004
  • NLC BDS meeting

2
(No Transcript)
3
Shielding wall
Shielding wall
4
Notes on Possible New B-Line
Slide from
P. Emma, R. Erickson, T. Fieguth, M. Hogan, A.
Seryi, et al. Sep. 29, 2004
5
Notes on Possible New B-Line
Slide from
P. Emma, R. Erickson, T. Fieguth, M. Hogan, A.
Seryi, et al. Sep. 29, 2004
6
Longitudinal tracking through B-line, but prior
to FF-system (SPPS mode at 28.5 GeV)
R56 -2.3 mm T566 -35 mm
Notes on Possible New B-Line
Slide from
P. Emma, R. Erickson, T. Fieguth, M. Hogan, A.
Seryi, et al. Sep. 29, 2004
7
Possible New B-line Parameters (SPPS-B)
Notes on Possible New B-Line
Slide from
P. Emma, R. Erickson, T. Fieguth, M. Hogan, A.
Seryi, et al. Sep. 29, 2004
8
NLC Beam Delivery System
NLC
Final focus with local chromaticity correction
9
New B-Line Final Focus
  • Same design concept as NLC FF (also adopted for
    ILC FF)
  • Local chromaticity correction in FD
  • Shorter L, to be compact, but same chromaticity
    as in ILC
  • B-Line FF L1m, bY0.1mm
  • ILC FF L4m, bY0.4mm
  • Additional constraints to be compatible with
    short bunch operation
  • Limit R56 and T566 terms
  • The tentative optics shown below is designed with
    these constraints
  • The optics is tentative (ver.10), and is being
    improved

10
New B-Line with sub picosecond bunch compression
New Final Focus
11
New FF for B-Line, version SHRTFF10.mad L1m,
and IP bx4mm, by0.1mm (same chromaticity as
present ILC parameters)
12
Final Doublet of New FF for B-Line, with
sextupoles for local chromaticity correction,
optics version SHRTFF10.mad
13
Survey of New B-Line with FF Optics till FF is in
blue, FF optics is in red z0 at the end of BLINE0
14
Survey of New B-Line with FF FF shown in red,
dashed line show straight line from FF entrance
15
with B-Line
Evolution of FF optics performance versus version
number Beam size shown is obtained with Turtle
tracking Versions 8,9,10 include New B-Line
bunch compression system
16
Performance of B-LineFF optics version 10 Beam
size shown is obtained with Turtle tracking
Already rather good for LCLS beam, can be
further improved for SPPS beam
17
New B-Line FF short bunch performance
  • Complete system (B-Line FF ver.10)
  • R56 -2.29 mm, T566 -77.18 mm
  • For beamline up to beginning of FF
  • R56 -2.185 mm, T566 -31.29 mm
  • gt FF does not change R56 but doubles T566
  • gt With SPPS beam (sE1.5), bunch length at IP
    will be lengthened by about 17mm which is still
    smaller than the SPPS beam goal of sz 50mm

18
New B-Line FF tracking cross-checks and
Synchrotron Radiation
  • Tracking of the full system (B-Line FF ver.10)
    with Turtle and with Dimad agree to better than
    5 in terms of the IP beam size
  • Effects of SR (tracking by Dimad) on IP size
    increase
  • LCLS beam Dsx2.8 , Dsy0.8
  • SPPS beam Dsx6 , Dsy14
  • gt SR effects are reasonably small

19
B-line FF Parameters and Performance
20
Tracked beam at IP of FF for SPPS and LCLS beam
parameters on the same scale
IP beam size of the tracked (SR included) beam in
a complete B-Line FF system LCLS parameters
sx / y 0.44 / 0.070 mm SPPS parameters sx / y
4.5 / 0.160 mm Further optimization of FF
optics may allow further reduction of the IP beam
size in SPPS case
LCLS beam, zoom in
21
Changes needed in FF optics ver.10
  • Provide space (3m?) for undulators in the
    beginning of FF
  • will lead to some lengthening of the system
  • Take into account present shield wall
  • Will shift FF about 7m downstream, if the wall is
    kept
  • Can the shield wall be removed or relocated?
  • Lengthen Final Doublet quads QF1 and QD0 about
    twice (for 30 GeV beam)
  • will lead to minor lengthening of overall
    beamline
  • Determine length needed for beam dump, if there
    is space left, use it for FF or undulators
  • Continue optimization, possibly, further reduce
    aberrations for SPPS beam
  • Standardize magnets, possibly use existing
  • Adjust angles in B-Line to fit to tunnel
    optimally
  • Look for ways to reduce T566

22
Survey of New B-Line with FF z0 at the end of
BLINE0
If the shield wall remains, need to lengthen
beginning of FF (will also help to create space
for undulators)
Note that the top plot is versus z and bottom
versus s which are 1-1.5m different gt location
correspondence is approximate
23
Summary
  • New B-Line with sub-picosecond bunch compressor
    and with compact final focus may have the
    following capabilities in terms of the IP beam
    size
  • sx,y,z 4.5 0.16 50 mm for 30 GeV SPPS
    beam
  • sx,y,z 0.45 0.07 20 mm for 14 GeV LCLS beam
Write a Comment
User Comments (0)
About PowerShow.com