Title: PIDX Field Ticketing update


1
PIDX Field Ticketing update
  • Terry Thomas
  • eContext Development Manager, eInitiatives
  • Schlumberger
  • Chris Foster
  • Lead, Business Information Solutions
  • EnCana

2
  • Agenda
  • Pilot progress to date
  • Learnings so far
  • Status and next steps
  • Benefits to date

3
  • Timeline

Initial engagement and demos
PIDX Working Committee established
Business Processes draft completed
Software changes and implementation guide
completed
Pilot started
4
  • Pilot progress
  • PIDX Field Tickets were successfully exchanged in
    August between test systems (using real data)
  • Field tickets successfully exchanged in
    production in EnCanas Medicine Hat BU
  • multiple jobs per AFE
  • multiple jobs per day
  • both manned and unmanned locations

5
(No Transcript)
6
  • Learnings so far
  • Process on physical signature amended by EnCana
  • If signature is provided in the PIDX xml, DCR
    will load the charges in an approved state. No
    dispute would ever be received
  • Audits will be performed to satisfy internal
    requirements
  • If no signature (unmanned location), charges are
    loaded as pending and approval can be obtained
    through DCR

7
Signature provided?
8
  • Learnings so far
  • Matching assets is as challenging as expected
  • Scribing errors on AFE number
  • AFE number may be used multiple times
  • Well Name truncated by different systems
  • UWI has differing formats
  • Issue is not insurmountable
  • Need to adopt consistent format standards as part
    of BPG?

9
  • Learnings so far
  • Algorithms for matching invoice and FT must be
    enhanced
  • Sub line items are causing difficulties in
    matching to invoice
  • Should sub line items be added to the PIDX
    standard?

10
  • Benefits
  • No human keying required on either side
  • Cost capture improvements seen from 10 down to
    0.1
  • Simplification of ticket approval in unmanned
    locations
  • Reconciliation to invoice expected to provide
    further value

11
  • Next steps
  • Full production test with all drilling locations
    in Medicine Hat BU
  • Software changes to implement
  • Enhanced asset matching capabilities
  • Improved reconciliation algorithms
  • Support for physical signature as approval

12
  • Next steps
  • EnCana has included DCR requirement in all 2008
    RFPs
  • Completions on ramping will begin in November
    2007

13