Title: TACOM LCMC Lean Six Sigma Project Tracking System
1TACOM LCMC Lean Six Sigma Project Tracking System
- Joan Moses
- G3 Enterprise Excellence Group
- 15 Mar 06
2Outline of Todays Talk
- Lean Six Sigma Project Tracking System Design
for Six Sigma Project - Access to the System
- Training
- Guided Tour
- Future Plans
- Benefits
3Design for Six Sigma CDOV Concept Design
Optimize Verify
4Green Belt Project
- Design for Six Sigma
- Survey Customers
- Conduct Benchmarking
- Analysis of Alternatives
- Near Term Solutions Implemented
- Plans to develop an LCMC-wide tracking system
- Continuous Process Improvement
5Voice of the Customer
- Command Group Needs
- Ability to answer LCMC and HQ data calls
- Measure success of LSS program
- Green Belts and Black Belts Top 3 Needs
- Lean Six Sigma Tools
- Access to Team Lessons Learned
- Ability to Search by Topic for planned, active
and completed projects
6Benchmarking - Organizations
- TACOM Acquisition Center
- AFMC, HQ
- ANAD
- ARDEC
- ATK Corporation
- Corpus Christi Army Depot (CCAD)
- CECOM
- CMA
- OSC
- Raytheon Six Sigma
- Robins AFB
- TARDEC OSCR
- TARDEC Value Engineering
- Tobyhanna Army Depot
7Project Results
- TACOM Intranet and TACOM LCMC AKO sites to post
Lean Six Sigma Information - Internal G3 Database to track known LSS projects
(short term solution) - Action Plan Approved to Develop LCMC-wide Lean
Six Sigma Project Tracking System - PEO GCS and Portal Dynamics built prototype
system, with limited test users - User feedback to optimize and field a LCMC-wide
system
8Enterprise Excellence Team TACOM Intranet
Located in G3/G4 Organization page listing ,
Special Interests listing, or through link
https//home.tacom.army.mil/bullet/g3/EEF/index.ht
ml
9TACOM LCMC Lean Six Sigma Community Page on AKO
https//www.us.army.mil/suite/portal.do?p135406
and then click on link in red box to access page
10Lean Six Sigma Project Tracking System (Prototype)
Prototype
Beta Testers Acquisition Center, ANAD, ARDEC,
G6, G8, ILSC, PEO GCS, RRAD, SIAD, WVA.,
11Access to the Lean Six Sigma Project Tracking
System
12PEO GCS Home Pagehttp//www.peogcs.army.mil/
13PEO GCS e-Business Life Cycle Management Portal
14PEO GCS e-Business Portal Registration Form
Yes, if you have a Detroit Arsenal
(Warren/Selfridge) Outlook email account. No, if
you are outside of Warren/Selfridge area
Sponsor for LSS PTS joan.moses_at_us.army.mil
15PEO GCS e-Business Portal Home Page
16PEO GCS e-Business Life Cycle Management Portal
- End to End Integration
- Full Life-cycle Approach to Acquisition
Management in a Collaborative Environment - Transaction Processing Capabilities
- Integration with Key Information Systems
- Cohesive Single View
17LCMC Team Page
18Training Plan Lean Six Sigma Project Tracking
System (LSS PTS)
19Training
- Various methods available
- Self training
- User manuals
- PowerPoint guidebook
- Organization LSS POCs
- G3 web-based demonstration to remote groups, on
request
20Guided Tour Lean Six Sigma Project Tracking
System (LSS PTS)
21Lean Six Sigma Project Tracking System Home Page
22Projects List View
Can Sort by Columns
23Project Details Screen
Note A Lean Six Sigma Project is not complete
until all the action items are finished.
24Project Search
Find project(s) by Key Words, Organizations,
Project Type, etc.
25Project Search Results - List View
To View Project Details in a List View
Projects in that category
Hit Select to View Project Details
26Export Project Search Results to Excel Worksheet
27Project Details Screen Searchable Fields
28Project Assignments (Team Members and Roles)
29Project Files (Project Documents)
30Project Status Dates
31Tasks
32Sample Hierarchy of Lean Events
Product Stream
Parent Project
Subprojects or tasks
VSA 1
VSA 2
Subprojects or tasks
RIE 1
RIE 2
RIE 1
Do-It 1
Every Project or sub-project can have many
sub-projects or tasks
33Sample Hierarchy of Lean Six Sigma Projects
Black Belt Project
Parent Project
Green Belt Project 1
Subprojects or tasks
Subprojects or tasks
VSA 1
Green Belt Project 2
RIE 1
Task 1
RIE 2
Every Project or sub-project can have many
sub-projects or tasks
34Project Details Parent Projects and Subprojects
35Tracking Sub-Projects
36Employees Associated with Lean Six Sigma
37Employee Details Screen
38Employee Project Assignments
39Employee Lean Six Sigma Training
40Future Plans
41Continuous Improvement
- User Feedback to Improve the LSS PTS
- Reports to Answer HQ AMC Metrics Data Calls
- Customized Reports for Users
- Increased Collaboration Capability for LSS Teams
- e-Business Portal Location
- Meeting Agenda and Minutes
- File Important Team Documents
- Internal Suspense Tracking
42Benefits of an LCMC-Wide Lean Six Sigma Project
Tracking System
43(No Transcript)
44Benefits to TACOM LCMC
- Quality Easy Access to Information
- - Reduced Manpower Costs
- Risk Decrease Risk of Program Failure
- Schedule - Faster Project Starts
45Lean Six Sigma Project Tracking SystemJoan
MosesDSN 786-7610Comml 586-574-7610Portal
DynamicsMary Mancini586-939-9802, x104