Habitech Building System
  • Habitech Center
  • a research and development unit
  • of the
  • School of Civil Engineering
  • Asian Institute of Technology

2
Habitech Center Facilities -AIT

3
Construction costs are 30-50 less than
conventional systems
4
Enabling approach
  • Labour intensive construction technologies
  • Practices that reach the informal sector and
    self-help builders
  • Allow for the development of skills in the
    construction sector
  • Sustainable use of natural resources
    economically and environmentally

5
OUT-Ventures SMEs
  • Incubators of Business Packages including
    assistance in
  • Business (Planning, management, marketing and
    sales)
  • Financial (Business plans and loans)
  • Technical (Installation, start-up, operations
    and quality monitoring)

6
Direct employment in production
Indirect employment in construction
Business plan Loan Marketing Sales
BUSINESS INCUBATOR FACILITY
Micro Enterprises SMEs
Building materials
Training Tech. Assistance
Raw processed materials
7
  • AFFORDABLE HOUSING PROJECTS SHOULD
  • Look to light industrialization in the
    production of building materials and in the
    construction process it-self
  • Be rooted in the community, present innovative
    solutions to real problems and enable others to
    imitate it
  • Build partnerships between the public and
    private sector
  • Address lively-hood making it possible for
    those participating to earn a living.

8
SMEs in Asia
9
Component FoundationMould for concrete footings
and floor
10
Component WallsInterlocking Soil Cement Brick
11
Production ProcessSieving-Mixing-Pressing
12
Production Facilities
13
Production FacilitiesCuring
14
Production FacilitiesStacking
15
Component WallsInterlocking Concrete Brick
16
Production ProcessMixing-Vibrating-Pressing
17
Production Facilities
18
Production FacilitiesStacking
19
Production FacilitiesCuring
20
Production FacilitiesHandling
21
Construction Details Walls
22
Brick - First Course
23
Construction Details Walls
24
Construction Details Walls
25
U-Shape brick
26
Wall Construction
27
(No Transcript)
28
(No Transcript)
29
Masonry - Dry Interlocking - Mortar
30
Component Walls Concrete Door and Window Frames
31
Door window installation
32
Component FloorConcrete Joists
33
Concrete joists
34
Floor Construction-Joists
35
Floor ConstructionConcrete Pans
36
Floor ConstructionConcrete Top
37
Form Work FloorConcrete Pans - Steel Forms
38
Component StairsStringer and treads
39
Stairs
40
Installation Details
41
Component RoofMicro Concrete Roofing Tiles
42
MCR Tiles Production Unit
43
Roof Detail
44
Roof ConstructionMCR Tiles
45
Component SanitationDouble vault aqua privy
46
Installation Details
47
Sanitation Unit Construction KitFoundation-concre
te ring-roof tile moulds brick press
48
Sanitation UnitShower - Toilet - Changing Room
49
Component SanitationComposting Toilet - Aerobic
50
(No Transcript)
51
Component Water SupplyWater Tank
52
Testing - Field PressSoil Cement Bricks - Wet
Compressive Strength
  • Minimum Strength
  • 20 kg/cm2
  • Strength achieved in projects varies between
  • 40 to 100 kg/cm2

53
Testing - Structural Laboratory Concrete Bricks
- Compressive Strength
  • Compressive strength varies between
  • 130 to 288 kg/cm2
  • and is relative to the mix ratio and aggregate
    types.

54
Testing - Structural LaboratoryJoists -Concrete
Floor
  • 2 Metric Tons / M2

55
Testing - Structural LaboratoryInterlocking
Brick Walls
56
Testing - Structural LaboratoryInterlocking
Brick Walls
57
Earthquakes Resistance
58
100 Tons Vertical Load
20 Tons Transverse Load
59
Projects - Housing
60
KhaoKho - ThailandFinalist 1995 - Building and
Social Housing Foundation Award
61
(No Transcript)
62
(No Transcript)
63
(No Transcript)
64
(No Transcript)
65
KhaoKho
66
Soil-Cement Bungalows
67
(No Transcript)
68
(No Transcript)
69
Soil-cement finishes
70
(No Transcript)
71
Soil Cement Schools
72
(No Transcript)
73
(No Transcript)
74
Concrete Brick Buildings
75
Aquaculture Outreach Center AIT
76
(No Transcript)
77
AIT Community School
78
(No Transcript)
79
(No Transcript)
80
ChaAm Campus University Residences
81
Bandung Housing Project - Indonesia
82
(No Transcript)
83
(No Transcript)
84
Primary Schools - Laos
85
Malaria Centers - Laos
86
(No Transcript)
87
(No Transcript)
88
(No Transcript)
89
(No Transcript)
90
(No Transcript)
91
(No Transcript)
92
School - Thailand
93
Resort Hotel - Thailand
94
School - Bangkok
95
(No Transcript)
96
School - Bangkok
97
(No Transcript)
98
(No Transcript)
99
Orchid - 9 floors - 510 low cost rental units
100
(No Transcript)
101
Blooms 3 buildings - 9 floors - 1130 low cost
rental units
102
(No Transcript)
103
(No Transcript)
104
(No Transcript)
105
(No Transcript)
106
Peony Court - Bangkok
107
AwardsIn 1994, Habitech Center was awarded the
Matsushita Memorial Prize by the Japan Housing
Association in recognition of excellent
achievements in improving human settlements in
Asian countries by promoting research and
development related to technologies for low cost
housing as well as providing educational programs
and facilities to disseminate the results of
their research efforts .
108
habitech-international.com
Write a Comment
User Comments (0)
About PowerShow.com