1
(No Transcript)
2
Regional Commissioner DDG Advocate Tozama Mqobi
Deputy Regional Commissioner Mr Freddie
Engelbrecht
Area Commissioners Baviaanspoort, Mr
Malinga Boksburg, Mr Ludada Johannesburg, Mr
Bouwer Krugersdorp, Ms Mbebe Leeuwkop, Mr
Mashiya Modderbee, Mr Baloyi Pretoria, Ms
Molatedi Zonderwater, Mr Tana
Regional Head Corrections Ms ME Madisa
Regional Head Corporate Services Mr E Khoza
Regional Head Finance and Supply Chain
Management Mr MM Molefe
Acting Regional Head Development and Care Mr MM
Molefe
3
Composition of Region
  • Gauteng consists of eight (8)Management Areas
    Baviaanspoort Boksburg Krugersdorp Modderbee
    Leeuwkop Johannesburg Pretoria and Zonderwater
    with 26 Correctional Centres, including
  • Two Female Correctional Centres - Pretoria and
    Johannesburg
  • One High Detention facility at Pretoria
  • Six classified maximum facilities Baviaanspoort,
    Boksburg (Juveniles), Johannesburg (2x), Leeuwkop
    and Zonderwater
  • ATD Centres Jhb, Pta, Boksburg. Modderbee and
    Krugersdorp
  • Youth Facilities at Baviaanspoort, Leeuwkop,
    Boksburg
  • Centres of Excellence at Baviaanspoort
    Emthonjeni, Johannesburg Female and Medium C,
    Leeuwkop Medium B and Pretoria Central

4
Composition of Region
  • Community Corrections Offices at each Management
    Area
  • Agriculture at Leeuwkop, Baviaanspoort,
    Zonderwater, Modderbee (Nigel and Devon),
    Pretoria (Odi and Atteridgeville)
  • Workshops at Boksburg, Leeuwkop, Pretoria,
    Zonderwater, Johannesburg
  • ESTABLISHMENT
  • Approved, financed establishment 9788
  • Positions filled 8586
  • Vacancies 1202
  • Vacancy rate 12.28

5
Offender population of Region
  • Approved accommodation 25 347 (at 100)
  • Unlock total 44 392 _at_ 175
  • ATDs 15 768
  • Sentenced 28 624
  • Juveniles
  • ATDs 57 females, 2 069 males
  • Sentenced 47 females, 1 794 males
  • Adults
  • ATDs 422 females, 13 219 males
  • Sentenced 836 females, 25 947 males
  • Security Classification
  • Maximum 74 females, 9 195 males
  • Medium 885 females 18 547 males

6
Parolees, probationers population of Region
7
Deaths and Escapes
  • Unnatural deaths
  • Offender Dlalda Leeuwkop Medium A 5 May 2009
    not gang related, Criminal Investigation pending
  • Offender Sevhaba Jhb Med A 5 May 2009 - not
    gang related, Criminal Investigation pending
  • Offender Strydom Leeuwkop Max 29 May 2009 -
    not gang related, Criminal Investigation pending
  • Escapes
  • Pretoria Central 27 May 2009 Escaped from
    Workshops via roof of Workshops
  • Jhb Med B 21 July 2009 Escaped from Chris Hani
    Bara Hospital while official went to bathroom
    half of the cuff was found to the hospital bed,
    other part gone with offender

8
2009/10 Budget Programmes Allocation,
Expenditure until 20 August 2009
9
2009/10 Budget Item Classification Allocation,
Expenditure until 20 August 2009
10
Expenditure on outsourced work
  • Suppliers
  • Sun Cleaning Services
  • Bosasa (Nutritional Services)
  • 3. Dept. of Health (Doctors rendering services in
    Centres)
  • Amounts
  • R 53 816.91 (June 2009 to August 2009 R 17
    938.97 per month)
  • R 59 851 163.60 (Payments from March 2009 to
    July 2009)
  • 3. R 944 071.66 (Payments for March, April and
    July 2009)
  • Duration of Contracts
  • 13 Months from 1 June 2009 to 30 June 2010
  • 36 Months from 1 February 2009 to 31 January 2012
  • Currently no contract in place but just a service
    agreement continuation.

11
Capital Assets Transfers and Subsidies
Expenditures to Date
  • Transfers and Subsidy
  • Available expenditure to 20 August 2009 R 2 690
    483
  • Capital Asset Expenditure
  • Available expenditure to 20 August 2009 R 3 574
    624

12
PROGRAMME ADMINISTRATION (Fin and SCM)
  • ACHIEVEMENTS
  • Compliance to balancing of final budget for
    2008/2009
  • Payments, asset and debt management
  • Improvement in AG report
  • CHALLENGES
  • Computer Systems
  • Budgetary constraints

13
PROGRAMME ADMINISTRATION (Corporate Services)
  • ACHIEVEMENTS
  • Regional Health and Wellness structures
  • OHS training
  • HIV and AIDS support group for staff
  • Employee Youth Prayer Day
  • Training in service terminations reduction on
    incomplete service terminations
  • Control Room Operators (90) and -Supervisors (16)
    appointed
  • Persal users (14) trained
  • Organisational Culture Survey conducted
  • Participation in Public Service Week (exhibition)

14
PROGRAMME ADMINISTRATION (Corporate Services)
  • CONSTRAINTS
  • Officials utilised in Special Programmes
    Components (Health and Wellness, Occupational
    Health Safety) adhoc basis
  • No meetings between Unions and Management OSD
    and OSD related industrial action
  • Shortage of officials to implement 7 Day
    establishment
  • Unavailability of approved HR policies and
    procedures

15
PROGRAMME SECURITY
  • ACHIEVEMENTS
  • One escape for quarter (against target of 4.75)
  • Incidents of attempted escapes foiled
  • Three unnatural deaths (against target of 3.75)
  • Security Audit on CoE performance of 80.7
  • EST training on new fire arm (9mm glock)
  • Security analysis report for planning and
    identification of risks

16
PROGRAMME SECURITY
  • CONSTRAINTS
  • High number of assaults overcrowding, shortage
    of personnel
  • Smuggling of unauthorized articles
  • Insufficient/unavailability of security equipment
  • Non-compliance to internal security measures
  • Condition of perimeter fence
  • Non-operating (training, maintenance) of control
    rooms
  • Lack of National Training Curriculum for security
    personnel
  • Shortage of staff

17
PROGRAMME FACILITIES
  • ACHIEVEMENTS
  • CSPB building projects
  • Completion of Krugersdorp ARV site
  • Completion of 9 new dog kennels at Krugersdorp
  • Staff Support Offices, Call Centre, Cost Centre
    clerk and Communication Office (Krugersdorp)
    98 towards completion
  • Building of JHB CSPB offices

18
PROGRAMME FACILITIES
  • CONSTRAINTS
  • Finalization of lease agreements, acquisition of
    new office space
  • Slow progress on RAMP
  • Budget constraints
  • Shortage of artisans
  • Building project specifications from PWD vs needs
    of Management Areas

19
PROGRAMME CARE
  • ACHIEVEMENTS
  • Accreditation of Krugersdorp ARV
  • 100 access to primary health care
  • All Pharmacies licensed with Pharmacy Council
  • SLA with Gauteng Dept of Health
  • Monitoring and evaluation in all Management Areas
    indicates improvement in compliance to national
    norms and standards
  • Delegated National Monitoring and Evaluation task
    team regarded the Gauteng ME System and the
    implementation there of as best practise for
    possible National implementation

20
PROGRAMME CARE
  • CONSTRAINTS
  • Limited resources and HIV Area Coordinators who
    are working on an adhoc basis.
  • Private pharmacies are utilized by Baviaanspoort
    and Zonderwater Management Areas
  • Shortage of specialized occupational classes
  • Lack of office equipment

21
PROGRAMME DEVELOPMENT
  • ACHIEVEMENTS
  • Implementation of formal educational programmes
  • Implementation of skills development programmes
  • Outcome of National Offender Choir and Regional
    Arts Work competitions
  • Implementation of all programmes for sports,
    arts, culture, library, The Presidential Awards
    Art Exhibition and Confederation Cup
  • Improved compliance levels in Production Workshops

22
PROGRAMME DEVELOPMENT
  • CONSTRAINTS
  • Limited resources. classrooms, suitably qualified
    officials and resignations by the educationists.
  • Lack of human and financial resources in
    Workshops and Agriculture negatively impacted on
    the set production targets.

23
PROGRAMME CORRECTIONS
  • ACHIEVEMENTS
  • The number of ATD children - from 99 to 74.
  • 507 officials trained on Unit Management and
    compilation of sentenced plans.
  • Correctional Sentence Plans developed for
    offenders serving 24 months and more
  • Monitoring Tool to monitor the implementation of
    unit management. Current population level at
    212, which exceeds the set (175) Regional
    target by 37.

24
PROGRAMME CORRECTIONS
  • CONSTRAINTS
  • Management of overcrowding, especially ATDs.
  • The current ratio on official to offender is 1-80
    and is a concern as it impacts negatively on unit
    management.
  • Provision of three meals system to offenders in
    single cells is not yet in accordance with the
    stipulated intervals due to the shortage of staff
    and current shift system.
  • The non-existence of a post establishment for
    correctional programmes facilitators.

25
PROGRAMME SOCIAL REINTEGRATION
  • ACHIEVEMENTS
  • SLA with SAPS - results in the tracing of
    absconders - increased from 79 to 103.
  • Task team to design a manual for house visitation
    to be used by Reintegration Case Officers during
    house monitoring.
  • Management Areas partnered with communities
    (projects) in an effort to alleviate poverty.

26
PROGRAMME SOCIAL REINTEGRATION
  • CONSTRAINTS
  • Reluctance of magistrates to place people
    directly under correctional supervision.
  • Shortage of personnel retards positive progress
    on effective service delivery.
  • Policies and procedures that are not congruent
    with operations.
  • Lack of support for offenders eligible for parole
    to be placed out in the community.

27
THANK YOU
THANK YOU The End
An Age of Hope A National Effort for
Corrections, Rehabilitation and Social
Re-integration of Offenders
Lets make a difference. Renewing our pledge a
National partnership to correct, rehabilitate and
re-integrate offenders for a safer and secure
South Africa.
Write a Comment
User Comments (0)
About PowerShow.com