Title: eVLBI progress in the South
1e-VLBI progress in the South
Towards e-VLBI ? e-VLBI
- Tasso Tzioumis
- ATNF, CSIRO
- September 2006
2Outline
- Overview - details in other presentations/posters
- Current LBA systems/developments
- Tapes - phasing out
- DAS - digital filters
- Disks - LBADR
- Software Correlators
- Network developments
- Real e-VLBI tests
- Plans the Future
3LBA
x NTD
x New Norcia
4Long baseline Array (LBA)
- Telescopes in Australia
- ATNF, U.Tasmania, NASA - core Oz VLBI network
- South Africa
- Telescopes in Asia Pacific region
- Japan, China, Hawaii, VLBA,
- Asia Pacific Telescope (APT) (VSOP support)
- Open network (EVN model of operations)
- http//www.atnf.csiro.au/vlbi
- ( Tests with NZ - fringes ok - no large antenna)
5LBA -S2 tape system
- Canadian S2 VCR-based recorder
- 8 VCR recorders ? 128 Mbps max data rates
- S2 maintenance issues (no external support)
- 7-station S2 LBA correlator at ATNF Sydney
- XF architecture (ATCA correlator design)
- Difficult to upgrade correlator
- The main production-VLBI system for 12 years
- 2005 workshop Phase-out S2 within 3-4 years?
- 2006 workshop Decommission S2 in 2006-7!!
- Move to disk-systems software correlation
- Correlation contracted to Swinburne - 1 October
2006
6LBA - DAS
- DAS Based on Digital Filters ( 10 years old!)
- 2 input IFs _at_ 64 MHz BW (2 pols or 2 frequencies)
- Sampling (10 bits) Digital filters (ideal
passbands) - Bands 64MHz ? 125 KHz
- S2 mode 2 x 16 MHz (? 128 Mbps to match S2)
- Huygens mode 4 x 16 MHz (256 Mbps)
- Maximum 2 x 64 MHz (512 Mbps) - tested in 2006
- Multibit mode 2 x 16 MHz x 8(10) bits ? 1 Gbps
- Interference excision?
- ATNF stations 2 DAS units
- 512 Mbps for Huygens (8 x 16 MHz)
- 1 Gbps by 4 x 64 MHz channels - developed
tested in 2006 - Remains the main DAS for LBA system(s)
- BUT no more units available!!
- Move to new VLBI dBBC units? (Haystack) -
timescales?
7LBADR - Disk recorders
- (See C. Phillips poster for details)
- PCEVN-Metsahovi VSI interface system
- VSIC (ECL-LVDS) VSIB(computer)
- Connects to LBA DAS
- All LBA antennas equipped
- COTS computers
- New Tyan Thunder K8WE motherboards (2005)
- Multiple PCI bus systems
- Internal disks IDE removable disks X-RAID on
fibre channel - (Replaced test systems on Dell 1600SC servers)
- Apple Xserve hardware RAID systems (7 TB)
8Software correlators
- See poster by S. Tingay A. Deller
- FX software correlator(s)
- Swinburne Supercomputer
- 300 Dell computers in cluster
- Real time correlation (normal modes) - 30-50
nodes - Smaller clusters at telescopes
- (Parkes 32 nodes ATCA 16 nodes)
- Cray XD-1 supercomputer in WA FPGAs
- Under development
- Very versatile robust (can run on most systems)
- Only correlators in Australia for disk systems!
9Real-time fringe testing
- Disk-systems
- Can run parallel to S2 VCRs (S2 C2 output port)
- Short segment (0.1s) data or use full recorded
data - Transfer to Swinburne - (slow) ftp or fast links
- Correlate and post on web
- Start correlating immediately (not all data
needed) - Fringe in a few secs web post within minutes
- Semi-automatic operation
- Routine for all LBA observations
- Setup fringe tests for all observations
- http//pentane.ssi.swin.edu.au/cphillip/
- ?Increased LBA reliability and robustness
10(No Transcript)
11Network connectivity -1
- See talk by Shaun Amy
- AARNet3 Regional Network
- Fibre tails to ATNF antennas in 2005-6
- 2M project, funded by CSIRO corporate
- Fibre tails owned by CSIRO
- e-vlbi tests in March 2006 - Official start
June 2006! - Legal contract problems!!
- 2 x 1 Gbps connectivity
- 1 operating now 2nd circuit to be connected
- 10 Gbps (x multiple wavelengths) backbone
- Good international connectivity
12AARNet3 Regional Network
13Network connectivity -2
- Swinburne 1 Gbps link(s) constructed
- Operation delayed by legal problems!! (again)
- (10 Gbps link from Parkes?)
- Enables software correlator connectivity
- Hobart Fibre links funded and in construction
(2006) - 1 Gbps - telescope --- University
- 10 Gbps to AARNet
- (BUT Bass-link limited to 0.5 Gbps?)
- WA Connectivity (Cray _at_ UWA)
- CeNTIE 3 x 1 Gbps BUT closes in 2006!
- AARNet3 links planned
- Impact on x-NTD?
- (Tidbinbilla - NASA 2 Mbps commercial links
- Future links? )
14First Oz real e-VLBI
- Date 24 August 2006
- Antenna Parkes, Mopra, ATCA
- Data rate 128 Mbps (per station)
- Bandwidth 2x16 MHz (per station)
- Processor Dual AMD server (ie only 2 CPUs)
- No disk buffering -- e-VLBI
- Time 10minutes
-
- 1-bas test Parkes-ATCA at 256 Mbps/station
15(No Transcript)
16(No Transcript)
17Plans - Near term
- Transition production VLBI to disk systems
software correlation (2006-7) - Investigate remote-disk recording
- Acquire 0.5M of disks
- Extensive real e-VLBI tests
- To Swinburne cluster correlator (in 2006)
- To JIVE correlator under EXPReS (2006-7)
- Data disk formatting issues (LBA - Mk5a) -
VSI-E?? - Tests to Haystack/Japan/Global - VSI-E??
- DAS replacement?
18Special e-VLBI Instrument?
- Parkes-Mopra- Narrabri
- 1 Gbps links installed
- 1 Gbps data from 2 x DAS systems
- Software correlation (Parkes or ATCA cluster)
- ? Real-time VLBI instrument at 1 Gbps
- Cf PTI instrument (Parkes -Tid _at_ 10 MHz BW)
- Very popular with non-VLBI specialists
- Fast detection observations/surveys
- May operate in parallel with disk recording
- E.g. correlate 2nd 512 Mbps stream from ATNF
antennas
19Plans - Longer term
- CABB - Broadband upgrade of ATCA
- 4 Gsamples x (8) bits ?? 32 Gbps streams
- 4 IFs per antenna 8 antennas
- Digital Polyphase filters -- CABB Correlator
- ATCA operation in 2007-8
- VLBI capability designed-in (2008?)
- Need for VLBI operation
- n x 10 Gbps connections to ATCA (Narrabri)
- Broadbanding of Rx systems (Mopra, Parkes)
- Narrabri polyphase filters?
- Broadband and Fast links from non-ATNF antennas
- ? Multiple 10 Gbps inputs e-VLBI
20A Wideband Upgrade for the Australia Telescope
Compact Array
Luneburg Lens Phased Array
Luneburg Lens Phased Array
6 22m antenna AT Compact Array
FPGA hardware may be completely reprogrammed to
produce many different filterbank configurations,
as different observations may require.
A 2GHz bandwidth polyphase digital filterbank
with 4096 channels ... ... will fit into
four XC2V6000 FPGAs
Filterbank Architecture
RF, IF and Baseband Signal Path
21Summary
- S2 tape LBA system to be decommissioned 2006-7
- LBADR - disk recorder developed
- Software correlation - real time speeds
- Very versatile, robust and portable
- LBA transition disk recording software
correlation - Digital DAS - need to augment/replace
- 1 Gbps links to ATNF antennas operating
- Links to correlator and other telescopes in
construction - First real e-VLBI tests successful
- Plans for eVLBI instrument (Pks-Mop-Nar)
- Future 10 Gbps links CABB correlator