e-VLBI progress in the South
Towards e-VLBI ? e-VLBI
  • Tasso Tzioumis
  • ATNF, CSIRO
  • September 2006

2
Outline
  • Overview - details in other presentations/posters
  • Current LBA systems/developments
  • Tapes - phasing out
  • DAS - digital filters
  • Disks - LBADR
  • Software Correlators
  • Network developments
  • Real e-VLBI tests
  • Plans the Future

3
LBA
x NTD
x New Norcia
4
Long baseline Array (LBA)
  • Telescopes in Australia
  • ATNF, U.Tasmania, NASA - core Oz VLBI network
  • South Africa
  • Telescopes in Asia Pacific region
  • Japan, China, Hawaii, VLBA,
  • Asia Pacific Telescope (APT) (VSOP support)
  • Open network (EVN model of operations)
  • http//www.atnf.csiro.au/vlbi
  • ( Tests with NZ - fringes ok - no large antenna)

5
LBA -S2 tape system
  • Canadian S2 VCR-based recorder
  • 8 VCR recorders ? 128 Mbps max data rates
  • S2 maintenance issues (no external support)
  • 7-station S2 LBA correlator at ATNF Sydney
  • XF architecture (ATCA correlator design)
  • Difficult to upgrade correlator
  • The main production-VLBI system for 12 years
  • 2005 workshop Phase-out S2 within 3-4 years?
  • 2006 workshop Decommission S2 in 2006-7!!
  • Move to disk-systems software correlation
  • Correlation contracted to Swinburne - 1 October
    2006

6
LBA - DAS
  • DAS Based on Digital Filters ( 10 years old!)
  • 2 input IFs _at_ 64 MHz BW (2 pols or 2 frequencies)
  • Sampling (10 bits) Digital filters (ideal
    passbands)
  • Bands 64MHz ? 125 KHz
  • S2 mode 2 x 16 MHz (? 128 Mbps to match S2)
  • Huygens mode 4 x 16 MHz (256 Mbps)
  • Maximum 2 x 64 MHz (512 Mbps) - tested in 2006
  • Multibit mode 2 x 16 MHz x 8(10) bits ? 1 Gbps
  • Interference excision?
  • ATNF stations 2 DAS units
  • 512 Mbps for Huygens (8 x 16 MHz)
  • 1 Gbps by 4 x 64 MHz channels - developed
    tested in 2006
  • Remains the main DAS for LBA system(s)
  • BUT no more units available!!
  • Move to new VLBI dBBC units? (Haystack) -
    timescales?

7
LBADR - Disk recorders
  • (See C. Phillips poster for details)
  • PCEVN-Metsahovi VSI interface system
  • VSIC (ECL-LVDS) VSIB(computer)
  • Connects to LBA DAS
  • All LBA antennas equipped
  • COTS computers
  • New Tyan Thunder K8WE motherboards (2005)
  • Multiple PCI bus systems
  • Internal disks IDE removable disks X-RAID on
    fibre channel
  • (Replaced test systems on Dell 1600SC servers)
  • Apple Xserve hardware RAID systems (7 TB)

8
Software correlators
  • See poster by S. Tingay A. Deller
  • FX software correlator(s)
  • Swinburne Supercomputer
  • 300 Dell computers in cluster
  • Real time correlation (normal modes) - 30-50
    nodes
  • Smaller clusters at telescopes
  • (Parkes 32 nodes ATCA 16 nodes)
  • Cray XD-1 supercomputer in WA FPGAs
  • Under development
  • Very versatile robust (can run on most systems)
  • Only correlators in Australia for disk systems!

9
Real-time fringe testing
  • Disk-systems
  • Can run parallel to S2 VCRs (S2 C2 output port)
  • Short segment (0.1s) data or use full recorded
    data
  • Transfer to Swinburne - (slow) ftp or fast links
  • Correlate and post on web
  • Start correlating immediately (not all data
    needed)
  • Fringe in a few secs web post within minutes
  • Semi-automatic operation
  • Routine for all LBA observations
  • Setup fringe tests for all observations
  • http//pentane.ssi.swin.edu.au/cphillip/
  • ?Increased LBA reliability and robustness

10
(No Transcript)
11
Network connectivity -1
  • See talk by Shaun Amy
  • AARNet3 Regional Network
  • Fibre tails to ATNF antennas in 2005-6
  • 2M project, funded by CSIRO corporate
  • Fibre tails owned by CSIRO
  • e-vlbi tests in March 2006 - Official start
    June 2006!
  • Legal contract problems!!
  • 2 x 1 Gbps connectivity
  • 1 operating now 2nd circuit to be connected
  • 10 Gbps (x multiple wavelengths) backbone
  • Good international connectivity

12
AARNet3 Regional Network
13
Network connectivity -2
  • Swinburne 1 Gbps link(s) constructed
  • Operation delayed by legal problems!! (again)
  • (10 Gbps link from Parkes?)
  • Enables software correlator connectivity
  • Hobart Fibre links funded and in construction
    (2006)
  • 1 Gbps - telescope --- University
  • 10 Gbps to AARNet
  • (BUT Bass-link limited to 0.5 Gbps?)
  • WA Connectivity (Cray _at_ UWA)
  • CeNTIE 3 x 1 Gbps BUT closes in 2006!
  • AARNet3 links planned
  • Impact on x-NTD?
  • (Tidbinbilla - NASA 2 Mbps commercial links
  • Future links? )

14
First Oz real e-VLBI
  • Date 24 August 2006
  • Antenna Parkes, Mopra, ATCA
  • Data rate 128 Mbps (per station)
  • Bandwidth 2x16 MHz (per station)
  • Processor Dual AMD server (ie only 2 CPUs)
  • No disk buffering -- e-VLBI
  • Time 10minutes
  • 1-bas test Parkes-ATCA at 256 Mbps/station

15
(No Transcript)
16
(No Transcript)
17
Plans - Near term
  • Transition production VLBI to disk systems
    software correlation (2006-7)
  • Investigate remote-disk recording
  • Acquire 0.5M of disks
  • Extensive real e-VLBI tests
  • To Swinburne cluster correlator (in 2006)
  • To JIVE correlator under EXPReS (2006-7)
  • Data disk formatting issues (LBA - Mk5a) -
    VSI-E??
  • Tests to Haystack/Japan/Global - VSI-E??
  • DAS replacement?

18
Special e-VLBI Instrument?
  • Parkes-Mopra- Narrabri
  • 1 Gbps links installed
  • 1 Gbps data from 2 x DAS systems
  • Software correlation (Parkes or ATCA cluster)
  • ? Real-time VLBI instrument at 1 Gbps
  • Cf PTI instrument (Parkes -Tid _at_ 10 MHz BW)
  • Very popular with non-VLBI specialists
  • Fast detection observations/surveys
  • May operate in parallel with disk recording
  • E.g. correlate 2nd 512 Mbps stream from ATNF
    antennas

19
Plans - Longer term
  • CABB - Broadband upgrade of ATCA
  • 4 Gsamples x (8) bits ?? 32 Gbps streams
  • 4 IFs per antenna 8 antennas
  • Digital Polyphase filters -- CABB Correlator
  • ATCA operation in 2007-8
  • VLBI capability designed-in (2008?)
  • Need for VLBI operation
  • n x 10 Gbps connections to ATCA (Narrabri)
  • Broadbanding of Rx systems (Mopra, Parkes)
  • Narrabri polyphase filters?
  • Broadband and Fast links from non-ATNF antennas
  • ? Multiple 10 Gbps inputs e-VLBI

20
A Wideband Upgrade for the Australia Telescope
Compact Array
Luneburg Lens Phased Array
Luneburg Lens Phased Array
6 22m antenna AT Compact Array
FPGA hardware may be completely reprogrammed to
produce many different filterbank configurations,
as different observations may require.
A 2GHz bandwidth polyphase digital filterbank
with 4096 channels ... ... will fit into
four XC2V6000 FPGAs
Filterbank Architecture
RF, IF and Baseband Signal Path
21
Summary
  • S2 tape LBA system to be decommissioned 2006-7
  • LBADR - disk recorder developed
  • Software correlation - real time speeds
  • Very versatile, robust and portable
  • LBA transition disk recording software
    correlation
  • Digital DAS - need to augment/replace
  • 1 Gbps links to ATNF antennas operating
  • Links to correlator and other telescopes in
    construction
  • First real e-VLBI tests successful
  • Plans for eVLBI instrument (Pks-Mop-Nar)
  • Future 10 Gbps links CABB correlator