1
Overall layout
4 cables towards Gap 8A Routed between Sct
c.trays and rails
All TRT services (pipes)
Side A
4 cables towards Gap 8A Routed between Sct
c.trays and rails
2
Arc ring Lar ground
Brackets (alu) Every 22,5 deg.
4 cables OD 5.5mm
Z-285
Probe connectors
Probe adjustments /-3mm in r-phi. Radius fixed
by Base-support plate
Probe ground cable Connected to Lar ground
Fiber-glass support Bonded on lar wall Secured by
2 M4x10 On arc ring
Z0
3mm
2 cables from probe Opposite quadrant
3mm