Title: SQ02


1
SQ02
  • Paolo Ferracin
  • LARP Collaboration Meeting
  • St. Charles, IL USA
  • October 5 - 6 , 2005

2
SQ02 status
  • Done
  • Choice of strand
  • Design and procurement of new islands and
    horseshoes
  • Definition of required instrumentation
  • Design of instrumentation trace
  • Fabrication of 4 coils
  • Definition of reaction time and temperature
  • Reaction of 4 coils
  • Instrumentation / Potting of 4 coils
  • Assembly and splices
  • Test preparation
  • To be done
  • Test with high axial load ( 20 t, room
    temperature)

3
Goals
  • Effect of axial loading on training
  • Perform tests with different axial loadings
  • Medium load (10 t), low load (0 t)
  • Monitor coil stress with strain gauges
  • Compare and interpret test results with FEM
  • Perform heater induced quenches
  • Perform magnetic measurements

4
Instrumentation
5
Short sample
  • Iss (strand) 495 A
  • Istability (strand) gt 1100 A
  • Iss (cable) 9900 A
  • Bpeak 11.1 T

6
Schedule
  • Analysis of SQ02 high load completed Feb 1
  • 4 weeks (1 P/E)
  • Test preparation Feb 16
  • 2 weeks (2 P/E 2 D/T)
  • Medium load test Feb 23
  • 1 week (2 P/E 2 D/T)
  • Change of load Mar 2
  • 1 week (2 P/E 2 D/T)
  • Low load test Mar 9
  • 1 week (2 P/E 2 D/T)
  • Data analysis Jul 1
  • 4 weeks (1 P/E)

7
Cost