Title: ACE OUTBRIEF


1
ACE OUTBRIEF
  • Engineer Summit
  • Marine Corps Engineer School

2
INTENT
  • The Engineer Summit was convened to expressly
    look at structure and what is required in MAGTF
    Engineering. The following tenets were used to
    focus efforts
  • Do we have an organizational structure problem?
  • Do we have the right equipment?
  • Do we fulfill stated METLs by MWSS?
  • Do our METLs match the future demand for
    warfighting?
  • What are the solutions?
  • Can we compensate some of our current structure?

3
PLANNING CONSIDERATIONS
  • Mirror imagining T/O and T/E
  • Go in effect FY08
  • Mission Task of establishing an EAF and (2) FARPs
    simultaneously
  • Solely in an expeditionary environment
  • No contractor support
  • No Host Nation support
  • No joint support

4
ACE ISSUES
  • Overall structure of MWSS supports the current
    AGS mission.
  • Reorganization of Maintenance (ROM) MWSS will
    require additional mechanics and appropriate tool
    kits to complete higher echelon maintenance.
  • Utilities 1141s not sufficiently trained in hard
    wiring to support AGS.
  • Without Area Clearance Equipment, the MWSS has
    limited capabilities to ensure mobility for
    establishing FARPs and removal of UXO on and
    around airfields.
  • Route Clearance task
  • Utilities and Heavy Equipment officer OCCFLD
    representation.

5
T/O DEFICIENCES
  • T/O Utilities
  • Add (1) SSgt 1171 and (1) SSgt 1141. Need
    respective subject matter experts for Power
    Generation and Hygiene.
  • Increase of (6) 1141s to support the increase of
    utilities T/E.
  • Add (2) 1161s to support the increase in T/E for
    ECUs.
  • Add (3) 1142s to support power generation and
    distribution T/E increases.
  • Engineer Company T/O
  • Add (1) GySgt Company Administrative Chief 13XX
    or 11XX to support transition from the Engineer
    Division to Engineer Company. Assignment of
    First Sergeants to MAW restricted.
  • Utilities increase 13
  • Company increase 1

6
T/E DEFICIENCIES
  • Area Clearance/Route Clearancedo not have
    correct equipment. Require (1) Buffalo, (2)
    Cougars. MWSS has mine detectors which provide
    insufficient support for current missions as a
    function of AGS in mobility task, establishing
    FARPs for example.
  • Provide internal airfield communications for
    host and nation units requires equipment for
    ditching capability. Recommend attachment for
    Caterpillar skid-steer that comes in damage
    repair kit. Currently only have back hoe with a
    bucket.
  • Concrete mixing capability. Without the
    capability of at least (3) 16 CuFt mixers, the
    MWSS cannot support METLs in support of EAF
    services ability to conduct BRAT and operations
    under Mobility METL for in support of large
    scale construction projects.

7
T/E DEFICIENCIES CONT
  • Utilities equipment as is cannot sufficiently
    support the ACE. Require the following changes
    and additions to current T/E
  • Add (6) B0008 ECUs to support fielding of Base-X
    style medical tent and COC.
  • Add (2) 50K water tanks for aircraft wash down
    and NBC equipment wash down. Wash down storage
    capability does not currently exist.
  • Ensure increase of T/E from (4) to (6) 100K B1045
    generators to support fielding new laundry units.
  • Add (2) 20K B0940 generators to support EAF FLOLS
    system to compensate for current T/E deficiency.
  • Add 5K gallon water distribution truck (for
    potable water).

8
OPERATIONAL IMPACT
  • Degraded capability in the required AGS to a MAG
    without the addition of other T/O and T/E items.

9
ENDSTATE
  • Priority is to fulfill METLs as stated now
  • Area Clearance Equipment
  • T/O increases
  • T/E increases