WSNTG 9th Annual Conference - PowerPoint PPT Presentation

1 / 40
About This Presentation
Title:

WSNTG 9th Annual Conference

Description:

WSNTG 9th Annual Conference – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 41
Provided by: galv9
Category:
Tags: 9th | wsntg | annual | chan | conference | jb

less

Transcript and Presenter's Notes

Title: WSNTG 9th Annual Conference


1
WSNTG 9th Annual Conference
  • Water Services Strategic Plans
  • Fact or Fiction

2
Case Study South Cork Water Supply Strategic
Study
  • Jerry Grant, Chartered Engineer, RConsEI
  • Managing Director
  • RPS Consulting Engineers

3
Scheme Boundaries
Scheme Boundaries
4
Elements of Integrated Strategy
  • Robust Supply / Demand Model for 2003, 2013, 2028
  • Supply Deficit Profile
  • Demand Management Plan
  • Water Conservation Programme
  • Asset Management Plan
  • Monitoring to Measure Performance/Risk
  • Rehabilitation to Manage Failure Risk
  • System Capacity Upgrading Needs for stated
    LOS
  • Capital Programme (New Capacity)
  • Operational Management Plan
  • Management Monitoring Processes (Pro-active)
  • Economic Implications
  • Capex, Opex and Implementation Plan

5
Major Schemes Overview
  • Cork Harbour City (Lee Inniscarra)
  • Residual Capacity can be Exploited
  • Cork City (Lee Road)
  • Sustainable City Supply Assets at Risk
  • Bandon / Innishannon (Bandon River)
  • Strategic Schemes SW of City
  • Glashaboy, Cobh E. Cork (Local Rivers GW)
  • Review Strategic Roles Deficits
  • Mallow / Fermoy (Local GW River Schemes)
  • Limited yield and backup for Risk
  • Clonakilty / Dunmanway
  • Need Augmentation for Development / Peaks

6
Overall Conclusions
  • Immediate Deficits met from Leakage Reduction
  • Sustainable Growth to 2028 can be served by
  • Realistic Demand Management Programme
  • Develop CH C Reserve plus Local Schemes
  • Monitor and Maintain Asset Standards
  • Storage Capacity Standards matched to supply
    needs
  • Operation and Maintenance Systems to integrate
  • Production Distribution
  • Leakage Demand Management
  • Asset Monitoring Management of Risk (Source to
    Tap)
  • Customer Services
  • Costs Revenues

7
Water Strategy Demand Management Principles
Option to Examine Sensitivity on ELL of Including
ES Costs
Consumption Forecasts
Include Existing Resources, Treatment, Headroom
etc
Environmental Social Costs
Supply Options and Costs
ELL and Leakage Targets
DEVELOP LEAST COST MIX OF OPTIONS TO MEET DEMAND
Demand Management Options
Mains Rehab Targets
Active Leakage Control Costs
Source Development Needs
Current Zone Leakage and Growth
Identify Mains Rehab options
Examine Sensitivity of Climate Change Scenarios
8
Water Balance Cork County Primary Schemes
9
International Benchmarking of Leakage
Leakage Comparisons with UK, Scotland, USA and
Australia
UK Water Only Cork Primary Scheme Leakage UK
Water and Sewerage Companies Cork City Cork
County Primary Schemes USA Water
Companies Australia Water Companies Scottish
Water All Primary Schemes
60

Lee Rd.
50
Glashboy/Cobh
Youghal
40
Fermoy
Leakage (m3/km/day)
Conna Regional
Thames
30
Scottish Water
20
Cloyne/Aghada
Glanmire Regional
10
Clonakilty
0
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
L/N (Length between Connections)
Cork County from 18 - 10m3/km/d 15Ml
10
Mains Classified by Material - County
CIS Datasets Incomplete for condition data
SOUTHERN AREA
WESTERN AREA
NORTHERN AREA
11
Leakage Targets Savings by Admin Area (Baseline
Consumers)
  • Potential Savings Demand Management
  • Cistern Displacement Hippos 1-2Ml/day
  • Regulation of Toilets 2-3Ml/day long term

12
Delivering Leakage Targets
  • Management / Structure
  • Independent Senior Engineer led Organisation
  • Divisional Team for Detection / Repair
  • Infrastructure Mgt. Systems
  • 350 DMAs with Telemetry Reporting
  • 16 Teams Equipped Trained
  • CIS Completion
  • Asset Performance Databases
  • Bursts
  • Complaints
  • Water Quality
  • Failures and Shut Downs
  • Modelling Pressure Management Set-up
  • Mgt. System and Costs Tracking
  • Detection Repair Teams Support Staffing
  • Promote Leak Reporting Free phone Leak Line

Report Review Performance against Targets
Refine
13
Overall Study Area Population
NSS EGS 2 Opt 1
CASP High
14
Zonings Exceed NSS
NSS Exceed Zonings
Glounthaune
15
Effect of Zoned Residential Provision
Planning Scenario - NSS (inc. all Zonings)
13.5
Forecast Scenario CASP High
16
Peaking Factors
17
Production Requirements - Primary Schemes

18
Effect of Passive Leakage Control
19
Overall Demand for Planning Forecast (Ml/d)
20
2028 Surplus / Deficits on Expanded Primary
Schemes
Note Surplus/Deficits are based on potential
capacity of existing primary scheme sources
21
Youghal Surplus / Deficit 2003 - 2028
22
Youghal Supply / Demand Model
23
Water Authority Purpose Management Objectives
  • The achievement of the highest level of consumer
    satisfaction and service quality in line with the
    prevailing regulatory framework, whilst making
    best use of available resources
  • (Faria and Alegre, 1996)

24
Performance Indicators
  • For Cork Authorities
  • Facilitate Better Management
  • Allows Monitoring of the effects of Management
    Decisions
  • Provides decision support information
  • Aids pro-active management reduce fire fighting
  • Highlights strengths and weaknesses of schemes
    and assets
  • Assists with implementation of a Total Quality
    Management regime
  • Facilitates the implementation of benchmarking

25
Performance Indicators
  • For the DEHLG
  • Supports the formulation of policy
  • Aids Assessment of investment
  • Needs Forecast
  • Investment Priorities
  • Project Selection
  • Follow-up Reporting

26
Performance Indicators
  • For consumers and pro-active stakeholders
  • Quality of Service Measurement
  • Appreciation of Service Delivered
  • Promote Social Environmental Awareness
  • Water Conservation
  • Sources Protection

27
Proposed LOS
  • Water Quality EU National Standards
  • Security of Supply
  • Resources
  • Headroom 5-15 Risk Dependent
  • Demand Forecasting
  • Annual Review
  • 5 yearly major review
  • Water Use Restrictions As required
  • Network
  • Storage 24 hours peak daily demand risk
    assessed
  • WTW Capacity Capable Peak Week requirements 10
  • Leakage Targets
  • Distribution ELL
  • Consumer Side Reduce to 40l/p/d Monitor
  • Repair Times
  • Reported Bursts 90 12 hours
  • Detected Bursts - 72 hours
  • Emergency Plan In Place

28
Proposed LOS
  • Consumer Service
  • Min 15m Max 50m Pressure
  • Flow Fire Standards
  • Supply Interruptions
  • 12 hours maximum for 99 properties for 10 year
    planning horizon.
  • Adequate monitoring / recording for 5 year
    planning horizon.
  • Notice of a planned interruption of water supply
    lasting more than Specified duration
  • Bursts Target 200/1000km of main/annum
  • Complaints Queries Respond within 10 days
  • Appointments Policy
  • Water Safety Plan (Source to Tap)

29
Division of Study Area
30
Strategic Modelling Details
  • 14 Schemes ( 9 Models)
  • 1669 Nodes
  • 316km of main
  • 1,500 pipe lengths
  • 55 reservoirs or tanks
  • 39 pump stations
  • 500 Site surveys
  • Calibration of 113 meters,
  • Installation of 7 new meters
  • 104 Pressure tappings

31
Eastern Region Water Sources
32
Eastern Region Secondary Schemes
33
Eastern Region Production Requirements
34
Recommended Works Cloyne Aghada Whitegate WSS
Northern Area
Central Area
E2-2
E2-2
E2-1
Southern Area
35
Overall Capital Programme
36
Management Systems
  • Asset Register (Up to date CIS)
  • Geo referenced asset details
  • Event Register - geo referenced time stamped
  • Asset failure (bursts etc)
  • Complaints
  • Sampling Result (WQ, Asset Condition etc)
  • Customer Register
  • Location
  • Consumption History
  • Demand Category
  • Financial Systems
  • Where
  • What
  • Cost
  • Performance Reports
  • Water Quality Standards
  • Supply / Demand Balance
  • Interruptions to Supply
  • Pressure to Customers
  • Leakage
  • Customer Care
  • Unit Costs

37
Operational Management Plan
  • Organisation
  • Management Structure Accountable for
  • Production Distribution
  • Leakage and Demand Management
  • Asset Risk Management
  • Customer Financial Services
  • Personnel Resources
  • Dedicated Engineering Support Staff
  • Training and Equipment
  • Balance In-house and Contract
  • Inter-Authority Co-ordination
  • Co-ordination Committee for Regional Planning
  • Shared Telemetry / GIS Platforms Strategic
    Information
  • Co-ordinated Demand Management Approach

38
Operational Management Plan
  • Procedures
  • Water Safety Plan (Source to tap)
  • Operations and Maintenance
  • Emergency Planning
  • Asset Assessment
  • DMA Manuals
  • Source Protection
  • Data Management (Including capture)
  • Customer Relations
  • Building Control
  • Systems
  • CIS developed to Asset Management System
  • Hydraulic / System Models
  • Telemetry Information System
  • Regional Asset Monitoring Management
  • Plant Management Monitoring (SCADA)
  • DMA Monitoring Leakage Reporting
  • Financial Management Reporting

39
Implementation Issues
  • Funding and Procurement Constraints
  • Commitment to Demand Management
  • Operation Management Plan
  • Organisation Issues
  • Planning / Statutory Process
  • Capex Works
  • Lack of Procedures Data Systems
  • Support LOS / KPIs
  • Inform Capex Spend
  • Drive Pro-active Operation

40
Overall Summary
41
WSNTG 9th Annual Conference
  • Water Services Strategic Plans
  • Fact or Fiction
Write a Comment
User Comments (0)
About PowerShow.com