Title: Facility Assessment Training
1Facility Assessment Training
- Facility Assessment
- Training and Utilization of VFA.facility
- for
The Texas Department of Mental Health and Mental
Retardation
2AGENDA
Day One
- 830 900 Review setup and Welcome
- 900 - 1200 Executive Pass Through
- Start Up
- Facility Data
- Facility Renewal Forecast
- Deferred Maintenance
- Funding Scenario
- Questions ad discussion
- 1200 - 100 Lunch Break
- 100 - 500 User Pass Through
- Navigation
- Setting Up a Facility
- Deferred Maintenance
- Creation of Deficiencies
- Copying Deficiencies and Corrections
3AGENDA
Day Two
- 830 - 1000 Building Walk Through and Surveying
- 1000 - 1200 Working With Data
- 1200 - 100 Lunch Break
- 100 - 500 User Pass Through (continuation)
- Deferred Maintenance (continuation)
- Photos
- CAD Drawings
- Lnking
- Facility Renewal Forcasting
- Cost Models
- System Conditions
- F.R.F. Graph
- Reporting
4Facility Assessment Training
Basic Concepts
- Deficiency Backlog
- Life Cycle Costs
- Funding Scenarios
- VFA Methodology
5Facility Assessment Training
- Deficiency Backlog
- Life Cycle Costs
- Funding Scenarios
- VFA Methodology
6- What is a deficiency? A deficiency is a system or
component which - is unsafe
- is broken
- does not conform to current codes
- no longer performs the function to which it was
intended - has far exceeded its useful life
7Prioritization and Categorization
- Deficiencies are identified and quantified with
appropriate methods of correction and accurate
cost for correction. They are also Prioritized
and Categorized according to the Survey Criteria
setup at the outset of the Facility Assessment
Project.
8Facility Assessment Training
- Deficiency Backlog
- Life Cycle Costs
- Funding Scenarios
- VFA Methodology
9Life Cycle Costs
- In addition to Deficiency Backlog, Life Cycle
Costs need to be quantified as well. As
facilities continue to age, systems and
components wear out. It is important to plan for
the replacement of these items today to assure
that the funds are available at the appropriate
time. The purpose of this task is to anticipate
future costs for the replacement of building
components or systems beyond those required to
correct existing deficiencies.
10Conceptual Diagram of Life Cycle Costs
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year
7 Year 8 Year 9 Year 10 Year 11 Year 12 Year
13 Year 14 Year 15 Year 16 Year 17 Year 18 Year
19 Year 20
11Life Cycle Costs - Multiple Scenario Graphs
12Facility Assessment Training
- Deficiency Backlog
- Life Cycle Costs
- Funding Scenarios
- VFA Methodology
13Multiple What-if Funding Models
14Strategic Planning/Analyses
10-Year Plant Funding Analyses
15Facility Assessment Training
- Deficiency Backlog
- Life Cycle Costs
- Funding Scenarios
- VFA Methodology
16VFA Facility Assessment Methodology
Overall Scope (Big Picture)
- Set Up Facility Database
- Establish Survey Criteria
- Conduct Survey
- Enter Survey Data
- Funding Scenarios / Analysis / Reporting
17Set up Facility Database
Overall Scope (Big Picture)
Campus
Cost Index
Facility Criteria
Building
CAD
Rooms
Assemblies
18Establish Survey Criteria
Campus
Cost Index
Facility Criteria
Deficiency Criteria
Building
Component Systems
CAD
Rooms
Assemblies
19Conduct Facility Survey
System Conditions
Campus
Cost Index
Facility Criteria
Deficiency Criteria
Building
Component Systems
Deficiency
Verify Data
CAD
Rooms
Assemblies
Photographs
20Enter Assessment Data
System Conditions
Campus
Cost Index
Facility Criteria
Deficiency Criteria
Cost Model
Building
Component Systems
Deficiency
Verify Data
Replacement Cost
CAD
Rooms
Prime Correction
System Parameters
Assemblies
Option 2
Photographs
Option n
Estimated Line Items
21Generate Funding Scenarios / Analysis / Reporting
System Conditions
Life Cycle Parameters
Campus
Cost Index
Facility Criteria
Deficiency Criteria
Cost Model
Building
Component Systems
Deficiency
Verify Data
Replacement Cost
CAD
Rooms
Prime Correction
System Parameters
Assemblies
Option 2
Photographs
Option n
Estimated Line Items
22On-going Deficiency Management
System Conditions
Life Cycle Parameters
Campus
Cost Index
Facility Criteria
Deficiency Criteria
Cost Model
Building
Component Systems
Deficiency
Verify Data
Replacement Cost
CAD
Rooms
Prime Correction
System Parameters
Assemblies
Option 2
Photographs
Option n
Estimated Line Items
23VFA Facility Assessment Methodology Diagram
Life Cycle Parameters
System Conditions
Cost Model
Campus
Deficiency Criteria
Cost Index
Facility Criteria
Replacement Cost
Component Systems
Building
Deficiency
Verify Data
Legend
CAD
Rooms
Prime Correction
System Parameters
Facility Setup
Assemblies
Option 2
Survey Criteria
Photographs
Option n
Survey
Estimated Line Items
Data Input
Analysis
24VFA Facility Assessment Methodology / Review
- Set Up Facility Database
- Establish Survey Criteria
- Conduct Survey
- Enter Survey Data
- Funding Scenarios / Analysis / Reporting
25Construction Cost Data
- A Campus is a collection of Buildings
- What is a Cost Index?
- Construction Cost Data is adjusted according to
location and labor type. - All buildings within the same Campus share the
same adjusted costs..
26Buildings
Buildings to be surveyed are entered into the
database along with applicable data which
includes
- Number
- Name
- Street Address
- Stories
- Gross Area
- Replacement Value
- Use
- Construction Type
- Date Constructed
- Date Renovated
This data is not required, but is used as
criteria for future analysis.
27VFA Facility Assessment Methodology
- Set Up Facility Database
- Establish Survey Criteria
- Conduct Survey
- Enter Survey Data
- Funding Scenarios / Analysis / Reporting
28Deficiency Criteria
- Deficiencies are Categorized and Prioritized
according to the following criteria - Deficiency Category
- Prime System
- Priority
29Deficiency Category
- Building Code Compliance
- Life Safety
- Handicap Accessibility
- Energy
- Building Integrity
- Functionality
- Hazardous Materials
- Aesthetics
- Air/Water Quality
30Prime Systems
- Structure
- Exterior Walls
- Windows and Exterior Doors
- Roof
- Partitions
- Wall Surfaces
- Fire Separation Assemblies
- Interior Doors
- Flooring
- Ceilings
- Equipment
- Fixed Furniture/Casework
- Stairs
- Elevators
- Boilers / Furnaces
- Chillers
- Cooling Towers
- Air Handling Units
- Ductwork
- HVAC Piping
- Circulation Pumps
- Fan Coil Units
- Unit Ventilators
- Temperature Control
- Ventilation Systems
- Domestic Water
- Sanitary Waste
- Natural Gas
- Plumbing Fixtures
- Medical Gas and Vacuum Systems
- Fire Suppression
- Electrical Service
- Lighting
- Electrical Distribution
- Fire Alarm
- Emergency Lighting and Exit Signs
- Emergency Power
- Telephone/Intercom
- Data Systems
- Vehicular Pavement
- Landscaping
- Site Steam
- Site Chilled Water
- Site Domestic Water
- Site Sanitary Sewer
- Site Storm Sewer
- Site Gas
- Site Electrical
- Site Telecommunications
- Playground Equipment
31Deficiency Priority
- 1 Priority One Immediate Concerns
- Should be undertaken immediately including
violations of life safety, building and electric
codes. - 2 Priority Two Short Term Concerns (1-2 years)
- Should be corrected in the near future to
maintain the integrity of the building, including
systems which are functioning improperly or not
all and problems which, if not addressed will
cause additional deterioration. - 3 Priority Three Long Term Concerns (3-5 years)
- Should be corrected in the more distant future to
maintain the integrity of the building, including
systems which have exceeded their expected useful
life, but are still functioning. - 4 Priority Four Improvements
- Required or desirable to bring the facility to
perform as it should, including systems upgrades
and aesthetic issues. - 5 Priority Five New Code Requirements
- Do not conform to codes instituted since the
construction of the building and therefore
grandfathered in their existing condition. These
should be addressed in any major renovation
effort.
32Component Systems
- Life Cycle Costs are forecasted for the following
Building Systems and Components
- Structure
- Exterior Wall
- Exterior Windows Doors
- Roofing
- Partitions
- Wall Surfaces
- Interior Doors
- Flooring
- Ceilings
- Fixed Furniture Equipment
- Stairs
- Elevators
- Heating Source
- Cooling Source
- HVAC Distribution
- Terminal Devices
- Temperature Control
- Ventilation Systems
- Special Mechanical Systems
- Plumbing
- Fire Suppression
- Electrical Service
- Lighting
- Electrical Distribution
- Special Electrical Systems
- Telecommunications
- Pavement
- Landscaping
- Utilities
- Site Amenities
33VFA Facility Assessment Methodology
- Set Up Facility Database
- Establish Survey Criteria
- Conduct Survey
- Enter Survey Data
- Funding Scenarios / Analysis / Reporting
34Sources of Data
- The data necessary to determine a Buildings
Condition comes from -
- Observed Conditions
- Survey by trained professionals.
- Knowledgeable Staff who operate the facility
- A great deal of information is never documented
and resides in the heads of the individuals that
maintain the facility. These individuals play an
important part in the survey. - As-built Documentation, Reports, Maintenance
Logs, Etc. -
35Data Collected during Survey
-
- Deficiencies - Systems or Components which
- are unsafe
- are broken
- do not conform to current codes
- no longer perform the functions to which they
were intended - have exceeded their useful life
- Photographs of Building and select Deficiencies
- Building information is verified
- Major Building Systems and Components are
evaluated for useful years remaining to determine
Life Cycle costs
36VFA Facility Assessment Methodology
- Set Up Facility Database
- Establish Survey Criteria
- Conduct Survey
- Enter Survey Data
- Funding Scenarios / Analysis / Reporting
37Data Input - Deficiencies
- Deficiencies are entered with a full description
of problem and likely causes. Deficiencies are
assigned at the Building level. - A Correction is created for each Deficiency
describing method of correction. Multiple
Corrections may be created where there are more
than one method to correct a Deficiency. - A Construction Cost Estimate is created for each
Correction using Estimated Line Items from the
Construction Cost Database. - Deficiencies can be linked to CAD drawings,
Rooms, Photos, and/or Assemblies for analysis
38Inputting Life Cycle Cost Data
- A Cost Model for Buildings of like construction
types and use is created. For each major
Building System and Component, the following
information is entered - Building Replacement Cost (cost/sq. M)
- System Life Cycle (in years)
- System of Building Replacement Cost
- Renewable of System at end of Life Cycle
- Individual Systems and Components within each
Building are placed in their current Life Cycle
39Building Summary
Pull Down Menus
Calculated CRV/FCI
Building Description
40- What is a deficiency? A deficiency is a system or
component which - is unsafe
- is broken
- does not conform to current codes
- no longer performs the function to which it was
intended - has far exceeded its useful life
41Deficiency Sample
42Deficiency Sample
43Deficiency Sample
44Deficiency Sample
45Space/Function Association
46VFA Facility Assessment Methodology
- Set Up Facility Database
- Establish Survey Criteria
- Conduct Survey
- Enter Survey Data
- Funding Scenarios / Analysis / Reporting
47Analysis
- Funding Scenarios combine Deficiency Backlog with
Life Cycle Costs over an extended period of time. - Life Cycle Cost parameters can be adjusted for
what-if scenarios. - Facility Condition Index used as an indicator of
relative condition
48FCI
- Facility Condition Index (FCI) is a industry
standard method for comparison of relative
building condition
total cost of existing deficiencies
FCI
current replacement value
49Example of FCI Scale
50Strategic Planning/Analyses
10-Year Funding Analyses
51- Reporting
- Embedded Automated
- Over 200 Standard Reports
- User-Specific Reports
52Embedded Standard Reports
Standard Reports, Tailored to Each
Clients Requirements
Click to Send Report to Screen, Printer or as
HTML
53Deficiencies by Priority
54Deficiencies by Priority
55Deficiencies by Priority
56Deficiencies by Priority
Includes Contaminate Mitigation - 1.6M
57Deficiency Identification
- Categories
- ADA/Accessibility
- Aesthetics
- Building Integrity
- Code Compliance
- Energy
- Functionality
- Hazardous Materials
58Deficiencies by Category
59Deficiencies by Category
60Deficiencies by Building System
- Building Systems
- Site
- Structure
- Exterior Enclosure
- Interior Construction
- HVAC
- Plumbing
- Electrical
- Other - Hazardous Material Abatement
61Deficiencies by Building System
62Additional Capital Renewal Costs
63Funding Scenario Analysis
- Option 1 - Minimal Investment
- 100,000 per year investment
- Option 2 - Improve Building
- Renewal Over 5 years
- Option 3 - Replace Building
- Demolish and Build New Facility
64Funding Scenario Analysis
65Capital Master Planning Systems
Installation/Training/Support
66Integration with Multiple Systems, Web
Capabilities
67- Facility Database
- Management Systems
- Facility Audit and
- Management Services
VFA