Title: UltraLight Short Term Plan 6 Months
1UltraLight Short Term Plan(6 Months)
- 1st Draft !
- Comments and Criticism Welcome !
2Important
- UltraLight is a project with two equal and
symbiotic activities - Application driven Network RD
- Not just a networking project, nor solely a
distributed data analysis project - UltraLight is a Physics ITR
- Ultimate goal
- Enable and produce physics (more generally
e-science), which could not otherwise be
performed - Network Technical Group is the backbone of the
Project - Activity Perform network RD
- Metric CS Publications, demonstrations
- Applications Technical Group is the driver of
the Project - Activity Perform middleware RD, perform LHC
Physics research - Metric CS and Physics Publications,
demonstrations, community adoption
3Reminder from the Proposal
- Phase 1 (12 months)
- Implementation of network, equipment and initial
services - Phase 2 (18 Months)
- Integration
- Phase 3 (18 Months)
- Transition to Production
4Original UltraLight Synchronisation Plan with CMS
Phase 1
Now
UltraLight Milestones
6-m from now
CMS Milestones and activities
Phase 2
UltraLight Deliverables
UltraLight Users
Phase 3
56-month Overall Project Goals
- Establish early ties to the LHC
- Tightly couple with LHC experiment needs and
timelines - Possibly take on official roles within
experiments? - Must aggressively come up to speed to be meet LHC
milestones - Already underway
- Establish collaborative ties with external
partners - OSG, Grid3, CHEPREO, AMPATH, etc
- Already underway
- Establish scope of the project
- Evaluate trade-offs between
- RD interests and application needs
- Functionality and LHC timeline
- Determine what technology we
- Can adopt off the shelf
- Must develop to meet project goals
- Establish initial UltraLight infrastructure and
user community
6Project Structure of UltraLight
- In the Proposal
- HEP Application-layer Services
- E-VLBI Application-layer Services
- Global Services
- Testbed Deployment and Operations
- Network Engineering
- Education Outreach
- Current
- Applications
- CMS
- ATLAS
- Global Services
- Testbed
- Network
- Global Services
- Testbed
- Engineering
- Education Outreach
7Early Focus of the UltraLight Technical Groups
- Networking
- Construct the UltraLight Network Testbed (UNT)
- Applications
- Construct the UltraLight Applications Testbed
(UAT) - Leverage GAE, Grid3, CMS, ATLAS, etc
- Prepare applications that will exploit the
Network Testbed - EO
- Build relationships with external partners
- CHEPREO, CIARA, AMPATH, etc
- To first order, the Network Testbed can be
instantiated independently from the Application
Testbed and EO activities - This will be our early strategy
- Later, bring the (largely orthogonal) testbeds
together in an evolutionary way
8Longer Term Goals (past initial testbed building
phase)
- Global Services
- Develop handles which monitor, control, and
provision network resources - Manually at first, then move to automate
- Close collaborative effort between Applications
Group and Networking Group - Requires the that the UNT and UAT work together
as a coherent whole - Combine to operate single UltraLight Testbed (UT)
- Smooth transformation to UT expected as UNT and
UAT activities are very complementary
96-month Network Goals
- Inventory the different UltraLight sites
- What are the current connections available at
each site? - What type of switches, how many, and where are
they located, etc? - Construct the UltraLight Network Testbed
- Persistent development environment
- Piece together all the different network
components - Create the NOC Team
- Begin thinking about disk-to-disk transfers
- Interface with Storage Elements
- Important for later integration work with
Applications
106-month Application Goals
- Establish UltraLight Application Grid Testbed
- Persistent development environment
- Deploy Application-layer services and middleware
- Deploy HEP Applications
- Create the GOC Team
- Perform System Integration Tests Demonstrate
- Interoperability of existing UltraLight
Application-layer Services - Operability of HEP Applications on top of
existing Application-layer Services - Study HEP application (ORCA ATHENA) behaviour
in-depth - Execution environment, Data/Metadata Model,
Performance Profiles - Current and future versions
116-month EO Goals
- Sorry Laird, I have not yet had a chance to call
you up and discuss your plansIll do so early
this week ?
126-month User Community Goals
- Feedback loop between developers and users
- Update and confirm the Proposed UltraLight
Grid-enabled Analysis Environment - Use actual LHC data analysis work
- Contribute to the CMS Physics TDR Milestones
- Many UltraLight members are strongly engaged
- Effort recognised in CMS
- Application driver for UltraLight!
- Challenging and essential!
- Very tight, ambitious schedule to meet however
13Current UltraLight Application Group Status
Much Delivered for SC04
Demonstrated at SC04
CMS P-TDR Analysis Efforts Already Underway
(very ambitious schedule)
Application Group is already working hard to ramp
up in time for the LHC
14Major Milestones over the Next 6 Months
- Dec
- Initial UltraLight Collaboration Meeting at CIT
- Jan
- UltraLight Week at CIT UltraLight Applications
Testbed in place - Feb CMS PRS Meeting
- UM connects to MiLR, UF connects to FLR
- Mar CMS Week
- FLR declared to be Production
- Apr
- May CMS CPT Week
- First round of CMS approvals for analyses to
enter P-TDR - Jun CMS Week
- UltraLight Meeting (UM?) UltraLight Network
Testbed in place