Title: UltraLight Short Term Plan 6 Months


1
UltraLight Short Term Plan(6 Months)
  • 1st Draft !
  • Comments and Criticism Welcome !

2
Important
  • UltraLight is a project with two equal and
    symbiotic activities
  • Application driven Network RD
  • Not just a networking project, nor solely a
    distributed data analysis project
  • UltraLight is a Physics ITR
  • Ultimate goal
  • Enable and produce physics (more generally
    e-science), which could not otherwise be
    performed
  • Network Technical Group is the backbone of the
    Project
  • Activity Perform network RD
  • Metric CS Publications, demonstrations
  • Applications Technical Group is the driver of
    the Project
  • Activity Perform middleware RD, perform LHC
    Physics research
  • Metric CS and Physics Publications,
    demonstrations, community adoption

3
Reminder from the Proposal
  • Phase 1 (12 months)
  • Implementation of network, equipment and initial
    services
  • Phase 2 (18 Months)
  • Integration
  • Phase 3 (18 Months)
  • Transition to Production

4
Original UltraLight Synchronisation Plan with CMS
Phase 1
Now
UltraLight Milestones
6-m from now
CMS Milestones and activities
Phase 2
UltraLight Deliverables
UltraLight Users
Phase 3
5
6-month Overall Project Goals
  • Establish early ties to the LHC
  • Tightly couple with LHC experiment needs and
    timelines
  • Possibly take on official roles within
    experiments?
  • Must aggressively come up to speed to be meet LHC
    milestones
  • Already underway
  • Establish collaborative ties with external
    partners
  • OSG, Grid3, CHEPREO, AMPATH, etc
  • Already underway
  • Establish scope of the project
  • Evaluate trade-offs between
  • RD interests and application needs
  • Functionality and LHC timeline
  • Determine what technology we
  • Can adopt off the shelf
  • Must develop to meet project goals
  • Establish initial UltraLight infrastructure and
    user community

6
Project Structure of UltraLight
  • In the Proposal
  • HEP Application-layer Services
  • E-VLBI Application-layer Services
  • Global Services
  • Testbed Deployment and Operations
  • Network Engineering
  • Education Outreach
  • Current
  • Applications
  • CMS
  • ATLAS
  • Global Services
  • Testbed
  • Network
  • Global Services
  • Testbed
  • Engineering
  • Education Outreach

7
Early Focus of the UltraLight Technical Groups
  • Networking
  • Construct the UltraLight Network Testbed (UNT)
  • Applications
  • Construct the UltraLight Applications Testbed
    (UAT)
  • Leverage GAE, Grid3, CMS, ATLAS, etc
  • Prepare applications that will exploit the
    Network Testbed
  • EO
  • Build relationships with external partners
  • CHEPREO, CIARA, AMPATH, etc
  • To first order, the Network Testbed can be
    instantiated independently from the Application
    Testbed and EO activities
  • This will be our early strategy
  • Later, bring the (largely orthogonal) testbeds
    together in an evolutionary way

8
Longer Term Goals (past initial testbed building
phase)
  • Global Services
  • Develop handles which monitor, control, and
    provision network resources
  • Manually at first, then move to automate
  • Close collaborative effort between Applications
    Group and Networking Group
  • Requires the that the UNT and UAT work together
    as a coherent whole
  • Combine to operate single UltraLight Testbed (UT)
  • Smooth transformation to UT expected as UNT and
    UAT activities are very complementary

9
6-month Network Goals
  • Inventory the different UltraLight sites
  • What are the current connections available at
    each site?
  • What type of switches, how many, and where are
    they located, etc?
  • Construct the UltraLight Network Testbed
  • Persistent development environment
  • Piece together all the different network
    components
  • Create the NOC Team
  • Begin thinking about disk-to-disk transfers
  • Interface with Storage Elements
  • Important for later integration work with
    Applications

10
6-month Application Goals
  • Establish UltraLight Application Grid Testbed
  • Persistent development environment
  • Deploy Application-layer services and middleware
  • Deploy HEP Applications
  • Create the GOC Team
  • Perform System Integration Tests Demonstrate
  • Interoperability of existing UltraLight
    Application-layer Services
  • Operability of HEP Applications on top of
    existing Application-layer Services
  • Study HEP application (ORCA ATHENA) behaviour
    in-depth
  • Execution environment, Data/Metadata Model,
    Performance Profiles
  • Current and future versions

11
6-month EO Goals
  • Sorry Laird, I have not yet had a chance to call
    you up and discuss your plansIll do so early
    this week ?

12
6-month User Community Goals
  • Feedback loop between developers and users
  • Update and confirm the Proposed UltraLight
    Grid-enabled Analysis Environment
  • Use actual LHC data analysis work
  • Contribute to the CMS Physics TDR Milestones
  • Many UltraLight members are strongly engaged
  • Effort recognised in CMS
  • Application driver for UltraLight!
  • Challenging and essential!
  • Very tight, ambitious schedule to meet however

13
Current UltraLight Application Group Status
Much Delivered for SC04
Demonstrated at SC04
CMS P-TDR Analysis Efforts Already Underway
(very ambitious schedule)
Application Group is already working hard to ramp
up in time for the LHC
14
Major Milestones over the Next 6 Months
  • Dec
  • Initial UltraLight Collaboration Meeting at CIT
  • Jan
  • UltraLight Week at CIT UltraLight Applications
    Testbed in place
  • Feb CMS PRS Meeting
  • UM connects to MiLR, UF connects to FLR
  • Mar CMS Week
  • FLR declared to be Production
  • Apr
  • May CMS CPT Week
  • First round of CMS approvals for analyses to
    enter P-TDR
  • Jun CMS Week
  • UltraLight Meeting (UM?) UltraLight Network
    Testbed in place