OMV Refinery Schwechat - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

OMV Refinery Schwechat

Description:

5 steam boilers max. 1250t/h steam. 8 steam turbines max. 170 MWel. installed ... Switch gears: yearly thermography, stopp: cleaning. Circuit breakers: ... – PowerPoint PPT presentation

Number of Views:732
Avg rating:3.0/5.0
Slides: 15
Provided by: X388
Category:

less

Transcript and Presenter's Notes

Title: OMV Refinery Schwechat


1
OMVRefinery Schwechat
  • Schwechat, November 21, 2009

2
Agenda
1. Overview OMV Refinery Schwechat
2. Main Targets utility- supply
3. Overview Utilities
4. Production and Distribution of Electricity
5. Maintenance
6. Resumee / Outlook
3
The Schwechat Refinery
4
Crude oil ? products
Destillation
5
Diesel and gasoline the main products of
Schwechat Refinery
Output 2006 8.23 mio t
6
Based on lean staff management Schwechat Refinery
is competitive in market
  • Employees on Electricity
  • maintenance projects 11production
    3 shift for
    electrical
    maintenance
    operation of turbines switchgears 25
  • -gt 5 of staff work on electricity

Number of employees MR-S Due day 31.12.2006
880
26
92
327
762
553
Number of employees locations 2006
Number of employees shift / non shift 2006
shift
non shift
7
Utilities of Schwechat Refinery Main goals
  • 1. Safety2. reliability of supply3. Economical
    supply
  • Characteristics- 6 year interval for
    turnarounds of refinery plants
  • - low number of switching operations

refinery
8
Utilities of Schwechat Refinery
  • Power plant 1 2
  • 5 steam boilers max. 1250t/h steam
  • 8 steam turbines max. 170 MWel. installed
  • Max. E-power production 120 MWel.
  • Connection to national grid 25 MWel.
  • Flue gas desulpherisation 660.000 m3/h
  • 4 cooling towers 60.000m³/h
  • Water treatment 1600m³/h
  • Compressed air supply max. 38.000Nm³/h
  • District heating 30 - 225MW

9
Distribution of electricity
-5MW - 5MW
110kV SF6
2006
45MW
main switchgear pp2
1978
55MW
main switchgear pp1
1970
1968
1958
10
Distribution of electricity 2
  • Main switch gears 6kV, double busbarnominal
    current 4.000Amax. short circuit current
    72,5kA
  • pp switchgears K1-K8, double busbarnominal
    current 1.250A max. short circuit current
    30kA
  • Refinery switchgears (single busbar)a) 6kV
    SH1-7 nominal current 5000A / 2000A / 1250A
    max. short circuit current 63kA / 40kA /
    30kAb) 500V- switchgears 34 nominal
    current 2.800A / 1600A max. short circuit
    current 65kA

11
Distribution of electricity 3
  • Auxiliary voltage (6kV 110 Vdc 500V 220
    VAc)- 110kV,6kV comp. grid
  • 500V IT- net- load A- busbar lt ½ load-
    interrupts possible -gt automatic
    recommissioning- high speed transfer devices

1978-2002
1970 - 2007
12
reliablity
  • (n-1)
  • Process - management
  • Automatic load reduction

13
maintenance
  • Refinery plants turnarounds every 6 years-gt
    maintenance interval
  • Solomon benchmarking-gt philosophy preventive
    maintenance Example
  • Motors - high effort on inspection -gt
    reduction on maintenance costsinspection -
    vibration measurement - temperature monitoring
    bearing, stator- iron -gt closed motors revision
    cycle 12 years-gt open air ventilation 6
    year cycle
  • Switch gears yearly thermography, stopp
    cleaning
  • Circuit breakers - exchange of oil and wearing
    parts - according maintenance description of
    supplier

14
Resumee / Outlook
  • Refinery on the growth-gt expected load 107MW
  • Short circuit current
  • Reshaping of grid-gt reliable long term
    partnerships