Title: OMV Refinery Schwechat
1OMVRefinery Schwechat
- Schwechat, November 21, 2009
2Agenda
1. Overview OMV Refinery Schwechat
2. Main Targets utility- supply
3. Overview Utilities
4. Production and Distribution of Electricity
5. Maintenance
6. Resumee / Outlook
3The Schwechat Refinery
4Crude oil ? products
Destillation
5Diesel and gasoline the main products of
Schwechat Refinery
Output 2006 8.23 mio t
6Based on lean staff management Schwechat Refinery
is competitive in market
- Employees on Electricity
- maintenance projects 11production
3 shift for
electrical
maintenance
operation of turbines switchgears 25 - -gt 5 of staff work on electricity
Number of employees MR-S Due day 31.12.2006
880
26
92
327
762
553
Number of employees locations 2006
Number of employees shift / non shift 2006
shift
non shift
7Utilities of Schwechat Refinery Main goals
- 1. Safety2. reliability of supply3. Economical
supply - Characteristics- 6 year interval for
turnarounds of refinery plants - - low number of switching operations
refinery
8Utilities of Schwechat Refinery
- Power plant 1 2
- 5 steam boilers max. 1250t/h steam
- 8 steam turbines max. 170 MWel. installed
- Max. E-power production 120 MWel.
- Connection to national grid 25 MWel.
- Flue gas desulpherisation 660.000 m3/h
- 4 cooling towers 60.000m³/h
- Water treatment 1600m³/h
- Compressed air supply max. 38.000Nm³/h
- District heating 30 - 225MW
9Distribution of electricity
-5MW - 5MW
110kV SF6
2006
45MW
main switchgear pp2
1978
55MW
main switchgear pp1
1970
1968
1958
10Distribution of electricity 2
- Main switch gears 6kV, double busbarnominal
current 4.000Amax. short circuit current
72,5kA - pp switchgears K1-K8, double busbarnominal
current 1.250A max. short circuit current
30kA - Refinery switchgears (single busbar)a) 6kV
SH1-7 nominal current 5000A / 2000A / 1250A
max. short circuit current 63kA / 40kA /
30kAb) 500V- switchgears 34 nominal
current 2.800A / 1600A max. short circuit
current 65kA
11Distribution of electricity 3
- Auxiliary voltage (6kV 110 Vdc 500V 220
VAc)- 110kV,6kV comp. grid - 500V IT- net- load A- busbar lt ½ load-
interrupts possible -gt automatic
recommissioning- high speed transfer devices
1978-2002
1970 - 2007
12reliablity
- (n-1)
- Process - management
- Automatic load reduction
13maintenance
- Refinery plants turnarounds every 6 years-gt
maintenance interval - Solomon benchmarking-gt philosophy preventive
maintenance Example - Motors - high effort on inspection -gt
reduction on maintenance costsinspection -
vibration measurement - temperature monitoring
bearing, stator- iron -gt closed motors revision
cycle 12 years-gt open air ventilation 6
year cycle - Switch gears yearly thermography, stopp
cleaning - Circuit breakers - exchange of oil and wearing
parts - according maintenance description of
supplier
14Resumee / Outlook
- Refinery on the growth-gt expected load 107MW
- Short circuit current
- Reshaping of grid-gt reliable long term
partnerships