1SAP Resource-related Billings
- Resource items - individual materials, internal
company services and costs - are passed on to the
customer. - A line item is created in the billing request for
each of the resource items. - Information on quantity, cost and unit of measure
is also copied to the billing request from the
individual items. - If a billing request has already been created for
an object, then the system checks which items
have already been requested when creating a new
billing request. - In the billing request, the system only copies
items that have not yet been requested. - If only a partial quantity was billed, only the
remaining quantity is copied into the billing
request.
2CO Cost Quantities Transferred to SD
Project Systems
WBS
WBS
3SampleDetail Transaction Report
Notice on the next slide that it is the detail
that is being billed, not the summary categories.
4SampleBilling Request
Quantity, Unit of Measure, Net value brought from
CO or MM to billing request
5Cost Element Roll Up-OKI2
X999 designates unallowables
6Gaps Between SAP MIT Requirements
- Unallowables (X999)
- Purchase Order billing instead of Invoice
billingIf 2 computers are ordered (single line
item, qty gt 1) one is invoiced in April other
is invoiced May 1 and we run April bills on May
3, SAP creates billing request for both
computers. We must correct and bill only for the
computer invoiced in April. - Cost overruns
- Stocked materialA few stocked items will end up
being charged against a cost reimbursable WBS.
Since Facilities is far removed from our
sponsored billing process, they frequently forget
to include the sales views when they create the
material master for the stocked item. - Above the line Settlements
- ReversalsIf a document is created in April and
reversed on May 10, the April expense will be
picked up when the April bills are run on May 3,
but the following month the May 10 credit is not
picked up. SAP ignores all reversed documents and
the documents that reverse them. - Cost sharing
- Unit of MeasureAll unit of measure must be
translated to each for our materials. Unit of
measure should not be a concern when billing our
sponsors for research. - Lincoln Lab specific - one WBS on multiple sales
orders
7Current Solutions to Functionality Gaps
- User exit - customization KSDIEX01
- Dummy CO credits created reversed
- Exception reporting
8Customization KSDIEX01User Exit ZXEBBU01
- We exclude unallowables (X999)
- We convert PO billing to Invoice billing
- We convert all stocked material to MS
- We add above the line settlements
- We fix cost overrun reversals
- We convert above units of measure to EA
- We handle one WBS on multiple sales orders
9Dummy CO Documents
KB11 is used to create credit for Costs in Excess
of Award Total, and KB14 is used to reverse the
credit.
10Cost Overruns
Credit appears on Billing Request
11Exception Reporting
Reversal
Cost Sharing
12High Maintenance Costs
- 14 transports to production in March May, 2002
- When fixed, only fixed temporarily
- Breaks frequently during upgrades
- Breaks when seemingly unrelated configuration
changes are implemented - Very sensitive to any changes in any of the
modules! - Shadow table confusing, hidden - difficult to
understand and fix - 5 custom production programs necessary to support
it
13After 4.6C
- SAP no longer supports current process
- We must convert to one of the following
- SAPs DIP (Dynamic Item Processing)
- SAPs New Add-on Grant Management Module
- Programmatically Create our own Billing Requests
141. Dynamic Item Processing
- DIP requires extensive configuration
- DIP involves new learning curve
- We must write our own conversion program to
convert all of our billed items to DIP billed
items, therefore we must get under the hood of
DIP processing. - Does DIP address enough of the functionality
gaps? - Can we we address the one WBS multiple Sales
Orders need?
152. DIP Fixes
- Unallowables
- Purchase Order billing instead of Invoice billing
162. SAP Grant Management Module
- Requires converting all our Periodic Deferred
Revenue billing from sales contracts to sales
orders (the 4th conversion!) - Requires implementing new module
- Supported module? (Some add-ons not supported)
- New module covered in our current SAP contract?
- Uses DIP therefore requires configuration
learning curve - We must write our own conversion program (DIP)
- Doesnt offer much over DIP
172. Grant Management Fixes
- Unallowables
- Purchase Order billing instead of Invoice billing
- Above the line Settlements
- Cost sharing
It might fix stocked materials, reversals unit
of measure problems. It does not fix cost
overruns or one WBS on multiple sales orders.
183. Create Billing RequestMIT Solution
- Addresses the MIT Functionality Gaps
- Sustainable support
- SAP Grant Management development team considered
implementing the same solution! - Based on what was really billed - not a shadow
table or billing requests - Easier for end-user technical support to
understand - no shadow table - Non-standard SAP solution even if we dont create
our own.
193. MIT Solution Fixes
- Unallowables (continues to use roll up table)
- Purchase Order billing instead of Invoice billing
- Cost overruns
- Stocked material
- Above the line Settlements
- Reversals
- Unit of Measure
- One WBS on multiple sales orders
20Proof of ConceptOld Program
21Proof of ConceptNew Program
Results are identical to old program on last
slide!
22Proof of ConceptBill Created from New Bill Req
23Proof of ConceptFI Posting
24Proof of ConceptBill Cancelled
The bill was cancelled and behaved just as a
normal FI document, bill billing request (see
next slide)
25Proof of ConceptCancelled Bill Request
Can be modified or re-billed