ADCIRC CH3D ICM Modeling System Initial Calibration April 2006 - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

ADCIRC CH3D ICM Modeling System Initial Calibration April 2006

Description:

Barry, Take a crack at this. Water Quality Calibration ... Identification of sites for remediation based upon water quality and ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 24
Provided by: raymond124
Category:

less

Transcript and Presenter's Notes

Title: ADCIRC CH3D ICM Modeling System Initial Calibration April 2006


1
ADCIRC - CH3D- ICM Modeling System Initial
Calibration April 2006
2
(No Transcript)
3
ADCIRC - CH3D- ICM Modeling System
  • ADCIRC - CH3D Linkage
  • CH3D - ICM Linkage
  • Upgraded Bathymetry (Captain Barry Cullens)
  • Modified Buoy Wind Algorithms
  • ADCIRC CH3D Calibration April 2006

4
Pamlico/Albemarle/Currituck Sound ADCIRC Grid
5
Pamlico/Albemarle/Currituck Sound CH3D-ICM Grid
6
April 2006 Initial Model Calibration Period
7
April 2006 Initial Model Calibration Period
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
ADCIRC PT Harbor Comparison
13
ADCIRC Duck CS Comparison
14
ADCIRC NW River Comparison
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
Model Simulations and Mitigation Scenarios
  • Barry, Take a crack at this.

19
Water Quality Calibration
  • Corresponds to sampling period July 2006 through
    June 2007
  • Water quality data obtained Aug 1, 2007
  • Plotting results for discrete sampling

20
Example slide of data
  • See next slide. I can put several of these in to
    give a feel for the data.

21
Selected Chlorophyll
22
Mitigation Scenarios
  • Identification of sites for remediation based
    upon water quality and hydrodynamic
    characteristics
  • Impact of watershed changes on water quality in
    Sound. What will impacts be at sites identified
    for restoration?

23
What else do we want to put?
Write a Comment
User Comments (0)
About PowerShow.com