PRODML Pilot Interactions Applications, Processes - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

PRODML Pilot Interactions Applications, Processes

Description:

Get well statuses. 21. Get allocations. 17. Determine well type. 24. Develop prioritised list ... Get simulated sales & status data. 9. Get well test data. 11 ... – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 10
Provided by: IBMU367
Category:

less

Transcript and Presenter's Notes

Title: PRODML Pilot Interactions Applications, Processes


1
PRODML Pilot InteractionsApplications, Processes
  • Stan DeVries
  • Laurence Ormerod
  • Pilot Teams

2
Shell Pilot
  • Notify user when measured and derived production
    volumes differ beyond thresholds among 3 sources
    of information
  • This is a synchronized architecture
  • The architecture is triggered by a schedule in
    the Data Validator application
  • This is a plug and play architecture

3
Shell Pilot
Invensys InFusion App Env
Invensys Notification
6
8
PETEX Prosper
Weatherford WellFlo
OSISoft PI Historian
4
BP Pilot
  • Optimize gas lift only gas lift rate changes
  • This is a synchronized architecture, triggered by
    Data Consolidator
  • Gas lift rate surveillance is decoupled and
    self-triggered
  • Optimizer is triggered on a gas lift rate change
    event
  • This is a plug and play architecture

5
BP Pilot
Sense Intellifield SITECOM Consolidator
Weatherford GL Optimiser
Sense Intellifield Portal
OSISoft PI Historian
OSISoft ACE Consolidator
6
Chevron Pilot
  • Notify user when water tanks will reach high
    level, and prescribe rates for highest impact
    wells
  • Data integrator runs a statistical algorithm that
    uses forecast data
  • Most of the architecture is triggered on a
    forecast alarm event

7
Chevron Pilot
Schlumberger Data Integrator
24
Invensys Notification
2
Invensys InFusion
Landmark DSS
22
14
Energy Components
13
Invensys InSQL
Weatherford LOWIS
12
Data Set Simulator
1
8
Statoil
  • Optimize smart wells
  • This is a decoupled architecture
  • Historian production volumes are decoupled from
    main architecture
  • Main architecture is triggered by Data
    Consolidator

9
Statoil Pilot
Energy Components PROSTY
Aspentech Historian
2
4
Schlumberger DECIDE
10
PETEX Prosper
Schlumberger IAM
11
Write a Comment
User Comments (0)
About PowerShow.com