Title: NLC Vibration Program
1NLC Vibration Program
- Tom Markiewicz/SLAC
- MAC Meeting
- November 2002
2Beam Delivery RD Plan
- In Progress
- SLAC based work on inertial systems
- Simple block capacitive sensor Himel
- Long steel beam Himel
- UBC work on Optical Anchor
- Fast Feedback demonstration in NLCTA (FONT)
- Additional Work Planned for FY2003
- Measuring the vibration properties of a SC quad
Parker - Measuring field position stability of SC
Detector Solenoid - Investigate feasibility of cavity BPMs w/ 1nm
resolution Himel - Future
- Single beam tests that use 1-nm BPMs to
demonstrate 1-nm stability - Realistic design of IP Girder prototype after we
down-select magnet stabilization options
3Differences from May 2000 Plan
- Do NOT make building a realistic IP Girder an
immediate priority - Discussion to follow
- MUST begin to investigate vibration properties of
SC magnets - Too important to leave to later
- Nanometer-BPM RD with BEAM TESTS can answer many
of vibration stability issues thought previously
to be uniquely answerably by IP Girder LINX
programs - Push nm-BPM program as much as possible
4SLAC Inertial Vibration Stabilization Program
Joe Frisch, Tom HimelEric Doyle, Leif Eriksson,
Linda Hendrickson, Richard Partridge
3m magnet and 5.5m support have same
mechanical properties (mass, w) as final design
5IP Girder Choices
- Magnet Permanent or SC ?
- Support Tube Details
- Material / wall thickness / diameter
- Resonance / stiffness requirements depend on
- Support scheme (cantilevered?)
- Sensor (inertial?)
- Support (soft)
- Activator (electrostatic pusher?)
- Simulate Magnetic Coupling of QD0 to Detector
Solenoid Fringe Field - 1000 lb. non-linear off-axis load on PM QD0
- Static springs or use real solenoid
6Final Doublet Technology Choice
REC Permanent Magnet w/ Adjustable Strength
Cold Bore SC Design
7More Engineering IssuesHow Real do we have to be?
- Vacuum
- Implement mechanical design consistent with
vacuum requirement (1 nTorr?) and 1cm radius beam
pipe - May mean that 3m magnet is broken into pieces
- Decide whether beam pipe hangs free of magnet or
not - Nature of contact between QD0 magnet and the
support tube - Static FFTB cams as opposed to a fully functional
FFTB mover - Assembly
- Joints and flanges which allow assembly and
servicing must be designed and included - Do we need to support IP end of cantilever with a
vibrating detector endcap door?
8PeP-II IP Girder
A lot of work to do it right and, finally, the
Devil is in the Details
9IP Girder Prototype
4.5m
- To be useful must reflect final design
- Basic technology choices are not in hand
- Will learn much from the simple 3m prototype
- Consensus at Nanobeam 2002 was nice but not
necessary - Design of NLC IP on paper for alternate
technology choices first
.5m
7m
10Magnet Measurements
- SC FD Quad See Brett Parkers talk
- BNL Funds approved to wind test short prototype
of cold mass - BNL group is forming that will address internal
vibration issues - SC Detector Solenoid
- Couples to QD0 through fringe field if m?1
- Permanent magnet m1.
- Directly steers beam through non-zero crossing
angle - Plan to measure field stability in fringe region
or coil vibration of a detector solenoid to begin
to get some idea of the size of the problem - Adjustable Permanent Magnet
- M. Kumada (Nat. Inst. of Radiological Sciences in
Japan) - Nanobeam 2002 reports by Kumada, Iwashata
Antokhin
11Shintakes C-Band Cavity BPMs
1995 FFTB Tests 25 nm resolution _at_ 6 x 109 /
bunch
Resolution Theoretically sub-nmPractical
Limits -Common Mode Leakage -Angle
Alignment -Losses, Drifts Phase matching in
Cables, Filters, Mixers -Digitizers and Pulse
Shapers not optimized
12Nanobeam 2002 Development
- Off-Hand remark by TorIf we had nm BPMs we
wouldnt need the beam-beam collision to verify
nm-level vibration stability (LINX) - Joe Frisch/Steve Smith No problem in principle
4 C-Band ATF BPMs
- Improvements
- Digital Down Conversion Fast Scope (Drifts,
resolution dynamic range) - New BPM design w/couplers that remove CM
- Angle Adjustments Hardware
- Improved S/N by using rad hard electronics on
beamline
13BPM RD Plan
- October 2002 Discussions w/ ATF people
- December 2002
- Test one cavity w/ high gain electronics,
tiltyaw control - March 2003
- Array of 3 BPMs with independent tilt/yaw adjust,
temperature control multi-channel readout on
common concrete table or in specially design
common support tube with full positioning
adjustment capability (under design at LLNL) - Future
- Stabilize array using inertial /or optical
scheme - Create waist with quad array
- stabilize magnet as well as BPM array(s)
- A convincing demonstration that vibration problem
is under control
14Single Beam Vibration Stability Test
Spot Size
Magnet
BPM
BPM
Artists conception
15Optical Anchor
Sub-nm resolution measuring fringes with
photodiodes ? drive piezos in closed loop
16UBC RD on Interferometers
17UBC RD on Interferometersfrom Nanobeam 2002
- Test platform challenges
- clean system
- high natural frequency
- Resonances
- Bandwidth
- Algorithms
- Piezo stiffness
From 90 nm to 5 nm at 5 Hz
Stabilize mirror 10 Meters in Air RMS 25.4 nm
before, 0.27 nm after
18FONT Beam Test on the NLCTA Very Fast
Intra-train IP Feedback
Kicker Amplifier
NLCTA
Kicker
NLC
4.5m
Round-trip Delay
BPM Processor
BPM
Colliding beams
Single beam
(short cable delays, long trip time)
(shorten trip time, lengthen cable delays)
19NLCTA FONT Installation
Magnet assembly and X-band BPM installed onto
NLCTA downstream of RF structures.
Beam direction
Feedback loop
20Feedback Performance vs. Gain
21FONT Results 27 Sept 2002x10 Improvement in
Position
BPM for 5 Dipole Settings
After 1 Latency Period Position corrected
independent of gain, then loop turns off
As above but loop ON Beam stays corrected until
end of pulse
22FONT Plans
- Demonstrate removal of high-frequency 'static'
structure in bunch position within train - Reduce latency validates delay-loop FB system
- Addition of witness BPMs
- current BPM is part of feedback loop
- Demonstrate position FB in both x, y, x, y
- Use solid-state kicker amp rather than tube amp
- NLC only requires volts
23FY 2003 Deliverables
- For Sure
- New inertial sensor
- Results from 3m prototype w/ inertial sensor
- Understanding of resolution limits of cavity BPMs
by measuring relative motion of BPM array _at_ 1nm
level at ATF - Fabrication of short SC prototype
- Measurement of SC quad field vibration w.r.to
cryostat - Incremental progress at UBC and FONT
- Less Likely
- Incorporate interferometer on 3m prototype
- Stabilize array of nm-BPMs measure absolute
stability - Measurement of one solenoid coil position or B
in fringe region - Engineering sketch of NLC IR w/ Perm. Magnets