Inventory the existing shoal/rock markers and develop GIS mapping. Develop set of guidelines for determining the conditions under which additional ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 9
Provided by: ameri91
Category:

less

Transcript and Presenter's Notes

Title: Navigational Systems Study Plan


1
Navigational SystemsStudy Plan
2
Navigational Systems Study Objectives
  • Inventory the existing shoal/rock markers and
    develop GIS mapping
  • Develop set of guidelines for determining the
    conditions under which additional navigational
    markers should be approved.
  • Determine the need and location for additional
    navigational markers using information from
    bathymetry survey, knowledge of the reservoir,
    and the guidelines that have been developed.

3
Navigational Systems Study Objectives
  • Identify processes to address safety related
    issues on Claytor Lake, including the process for
    the approval, installation, and maintenance of
    navigational markers.
  • Verify and update information related to the
    heights of lines crossing Claytor Lake and
    evaluate need for modifications.

4
Methods
  • Perform field survey of existing markers and map
    location with GIS. Each marker will be
    categorized by type and conditions. A record of
    the visible conditions at each site will be
    recorded.
  • Location of existing markers will be mapped on
    bathymetric maps and the existing markers will be
    evaluated.

5
Methods (Cont.)
  • Existing standards of agencies, including U.S.
    Coast Guard and state agencies, will be obtained
    and reviewed.
  • Guidelines will be developed to determine the
    conditions under which additional markers should
    be approved. Existing standards will be utilized.
    Project operation and changing elevations will be
    taken into consideration.

6
Methods (Cont.)
  • Coast Guard Auxiliary, VDGIF, VDCR and Friends of
    Claytor Lake will be consulted, along with others
    such as area fishing clubs and marina owners.
    Processes for other safety related issues will be
    identified with input from stakeholders.
  • Survey will be conducted during drawdown period
    to identify submerged navigational hazards.
  • Appalachian will review and update line crossing
    information with Transmission and Distribution
    Departments. Requirements for line crossings
    will be reviewed and the needs for any changes
    evaluated.

7
Schedule
  • Pre-Study meeting will be held in January 2007.
  • Workgroup meeting will be scheduled for March.
  • Field surveys will be conducted between April and
    October 2007.
  • Study Plan progress updates will be provided in
    May 2007 and November 2007. Additional workgroup
    meetings will be scheduled as needed.