Realizing and Operating Enterprise Systems - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Realizing and Operating Enterprise Systems

Description:

Install and configure hardware, network and base software. Design file layout ... Tax Accountant. Joint Venture Accountant. Marketing. Marketing Executive ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 13
Provided by: KentS8
Category:

less

Transcript and Presenter's Notes

Title: Realizing and Operating Enterprise Systems


1
Realizing and Operating Enterprise Systems
2
Objectives
  • Outline the realization phase
  • Discuss transition approaches
  • Describe enterprise system operations from go
    live to support

3
Installation steps
  • Size the system
  • Decide on installation type
  • Check on installation requirements
  • Install and configure hardware, network and base
    software
  • Design file layout
  • Install central instance
  • Define database
  • Build and load database

4
Configuration
  • Modifying plain vanilla enterprise system to
    support organization
  • Industry specific settings
  • Unique characteristics of particular industry or
    market segment
  • Company specific settings
  • Unique characteristics of company

5
Interfaces
  • Programs that that allow enterprise system to
    exchange data with legacy systems
  • Inbound and outbound
  • Almost always custom-built

6
Authorizations
Roles
  • Manager
  • PurchasingAgent
  • Employee

Manager
Purchasing Agent
Employee
Business Processs
7
Change levels in SAP
Customer
Enhance
-
Customizing
develop
-
ments
ment
user exits
R/3
-
Customer programs
user exits
Applications
(SAP Standard)
user exits
Modification
R/3 Basis
System Software
8
Data conversion
  • Need to transfer historical or legacy data to new
    system
  • Requires custom programs
  • Similar to interfaces
  • Usually one-time uploads

9
Transition approaches
Direct Cutover
New
Old
Parallel Transition
Old
New
Phased Transition
Old
New
Pilot Transition
Old
New
10
Testing
  • Unit or function testing
  • Includes data conversion programs, interfaces,
    and authorizations
  • Occurs throughout realization phase
  • Integration testing
  • Final step before go live

11
Go live and support
  • Quality assurance checks and evaluations
  • Optimization and refinement of the production
    environment
  • Follow-up training and assessment of end-user
    needs
  • Refinement of systems administration procedures
  • Project review

12
Summary
  • Outlined the realization phase
  • Discussed transition approaches
  • Described enterprise system operations from go
    live to support
Write a Comment
User Comments (0)
About PowerShow.com