CSC Simulation Status - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

CSC Simulation Status

Description:

Re-tuning to center wire digis causes big problems. Wire digis: a few percent bunch crossing error. Anode LCTs: 3% have early bunch crossing. ... – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 2
Provided by: richar735
Category:
Tags: csc | anode | simulation | status

less

Transcript and Presenter's Notes

Title: CSC Simulation Status


1
CSC Simulation Status
  • Trigger very sensitive to wire timing!
  • Re-tuning to center wire digis causes big
    problems.
  • Wire digis a few percent bunch crossing error.
  • Anode LCTs 3 have early bunch crossing.
  • Global muon trigger rejects 10 because of
    early bunch crossing.
  • Not clear who needs to change things.
  • Gas gain was too low in ME1/A
  • Caused RecHit efficiency to drop to 96
  • Fixed in CMSSW_1_6_0_pre7
  • Plans for 1_7_0
  • Use new interface to conditions.
  • Allows optimization of DB access.
Write a Comment
User Comments (0)
About PowerShow.com