Title: EarthCorps Restoration Projects
1EarthCorps Restoration Projects
Jammie Stauffer Senior Project Manager
2Young Leaders Strong Communities Healthy
Habitat
3Environmental restoration projects include
? Shoreline and stream restoration ? Invasive
Plant Removal ? Native Plant Re-vegetation
? Logging road obliteration ? Site Stewardship
and Monitoring ? Trail Maintenance and
Construction ? Slope Stabilization
4Shoreline and Stream Restoration
BEFORE
AFTER
5Near-shore Restoration
6Removing invasive plants
Native revegetation
7Logging road obliteration
Before
After
8Stewardship and monitoring
9Trail Construction Maintenance
10Slope Stabilization
11Lower Newport Creek, Bellevue WA
Project Partners
? City of Bellevue ? Natural Systems Design
12Project Goals
- ? Stabilize stream bank
- ? Hold stream bed in place
- ? Reduce soil erosion and decrease
- sediment transport downstream
- ? Create additional Fish Habitat
-
-
13Project Objectives
- ? Construct large woody debris structures on
1,500 linear feet of stream - ? Install coir logs on bank slopes
- ? Install erosion control fabric on bare soils
around constructed wood structures - ? Plant/stake over 1000 native trees and shrubs
around constructed wood structures -
-
14Project location Tributary of Coal Creek
Township 24N Range 5E Section 16
N
15Step 1 Log delivery
16(No Transcript)
17(No Transcript)
18Step 2 Staging of logs
19(No Transcript)
20(No Transcript)
21(No Transcript)
22(No Transcript)
23(No Transcript)
24Step 3 De-water the work site
25Step 4 Build large woody debris structures
26(No Transcript)
27(No Transcript)
28Step 5 Erosion control fabric and native planting
29http//www.youtube.com/watch?vjtl-WIOgaTk
30Wandering Creek, Kent WA
Key Project Partners
? City of Kent
31Project Goals
(LOW IMPACT)
- ? Create wildlife habitat
- ? Remove invasive vegetation
- ? Increase wetland acreage
- ? Increase native plant diversity
- ? Increase flood retention capacity
- ? Improve water quality
-
- ? Improve fish habitat
-
32Project Objectives
- ? Remove blackberry and reed canary grass
manually - ? Cover cleared areas with black fabric for 3
years - ? Sheet mulch upper bank with layers of
- cardboard and mulch
-
-
33Project Objectives cont.
- ? Plant native trees and shrubs through black
fabric and cardboard - ? Construct 7 hummock to plant native species in
reed canary grass - ? Stake native trees and shrubs near stream
- ? Continue invasive species removal sweeps
34Project location Outlet of Clark Lake
N
35(No Transcript)
36Step 1 Invasive removal
37Step 2 Black fabric
38Step 3 Sheet mulch
39Step 4 Hummock Installation
40(No Transcript)
41(No Transcript)
42(No Transcript)
43(No Transcript)
44Step 5 Native planting along upper stream bank
45Step 6 Maintenance of site
46Conclusion
- ?Big Picture Restoration
-
- ? Secure funding and support for on-going
maintenance -
- ? Engage the community
47Get Involved!