Title: Sample
1Precision Strike Association JSF Status
20 April 2004
Major General Jack Hudson, USAF Program Executive
Officer, Joint Strike Fighter Program Office
Mr. Tom Burbage, Lockheed Martin Executive Vice
President, General Manager, Joint Strike Fighter
042004 1 Precision Strike Association
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
2042004 2 Precision Strike Association
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
3VISION
BE THE MODEL ACQUISITION PROGRAM FOR JOINT
SERVICE AND INTERNATIONAL COOPERATION DEVELOP AND
PRODUCE AN AFFORDABLE NEXT GENERATION STRIKE
FIGHTER WEAPON SYSTEM AND SUSTAIN IT WORLDWIDE
042004 3 Precision Strike Association
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
4JSF is a Multi-Service, Global Program
F-35A
F-35B
F-35C
CTOL (USAF)
STOVL (USMC and UK)
CV (USN)
5Key Performance Parameters
KPP
USAF
USN
USMC
6Replanned System Development andDemonstration
(SDD) Schedule (IAW 2C)
We Are Here
13
CY01
02
03
04
05
06
07
08
09
10
11
12
14
13
FY01
02
03
04
05
06
07
08
09
10
11
12
14
Initial Operational Capability
First Engines to Test
Ready for Training
USAF
USMC
CTOL/CV
STOVL
First Operational Jet Delivered
USN
SDD Start
First Flights
- BLOCK 1
- Basic warfighter capability
- Flight qualified
- Interdiction, initial air-to-air
- JDAM/AIM-120
CTOL
CV
STOVL
UK-TBD
Preliminary Design Review
Design Review CTOL A-1
Critical Design Reviews
CTOL
STOVL
CV
- BLOCK 2
- Interdiction, enhanced air-to-air
- Close air support destruction of enemy air
defenses - Additional bombs qualified
Mar 03
Block 1 Capability Development and Integrated
Flight Test
Block 2 Capability Development Integrated
Flight Test
Block 3 Capability Development Integrated
Flight Test
- BLOCK 3
- Threshold compliant JSF w/ key weapons
- All JSF missions
- Additional missiles/bombs qualified
Low Rate Initial Production Start
Pending results of 17 June DAB
7JSF Enables True Joint, Coalition Operations
Total US/UK JSF Requirement Is Approximately 2600
Aircraft
Lockheed-Martin F35 Joint Strike Fighter
Current Aircraft
042004 7 Precision Strike Association
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
8JSF Enables True Joint, Coalition Operations
Potential Foreign Military Sales
Approximately 1500-3000 Aircraft
Denmark Norway Netherlands Italy Turkey
F-16
Lockheed-Martin F35 Joint Strike Fighter
Australia Canada
F/A-18
Current Aircraft
Australia
F-111
AMX
Italy
Harrier
Tornado
042004 8 Precision Strike Association
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
9Engine Interchangeability Either Engine in any
of the Three Aircraft Variants
F135 or F136
CTOL
CV
STOVL
10F135 Propulsion System
2001
2002
2003
2004
2005
2007
2010
2011
2006
2008
2009
Parts Manufacturing
Engine Test 12 Engines
Low Rate Initial Production (LRIP)
Business Opportunity Defense Capability
Flight Test 20 Engines
042004 10 Precision Strike Association
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
11Variants
12JSF Lethality
Lethality Kill Chain Must Forge Every Link to
Kill Target
Deliver Weapons
Classify ID Target
Acquire Track Target
Build Accurate Firing Solution
BDI
- JSF Lethality Features
- Acquire and Track Target
- Long Range Radar, Big SAR, Enhanced EOTS, IRST,
GMTI, ESM, Interoperability - ID Target
- High Resolution SAR, Enhanced EOTS, ESM,
Interoperability - Build Accurate Firing Solution
- Autonomous Targeting, Multiple Techniques to
Improve TLE, Georegistration - Deliver Weapons
- Range Enhancements, Versatile Weapon Carriage
- Common BDI
- Enhanced EOTS, ESM, High Resolution SAR
13JSF Transformational Capabilities
- Replacing Separate Service/Allied, Multi-Role
Combat Aircraft With a Joint Service, Coalition
System With the Following Capabilities - Long Range Stealth From Flexible Bases
- Multi-Spectral Sensor Suite to Find, Identify and
Target Moving/Relocatable Targets Through Adverse
Weather - Integration and Interoperability Adding to
Precision Strike - Radical Reductions in Support Requirements and
Ownership Costs
Transforming From Service-Focused Acquisition to
Joint/Coalition Acquisition
14Expeditionary / Versatile Basing Flexibility
Numerous Forward Operating Bases
Reduced Support Required (All JSFs)
Naval Access (CV, STOVL)
Austere Basing Option (STOVL)
15Combat Radius
STOVL
CTOL
CV
16F-35 Baseline Mission Systems Review
SAR
DAS
EW
EOTS
GMTI
- Link 16
- Integrated Broadcast System
- UHF Satcom
- SINCGARS
- Have Quick
17Airfield Targets
JSF Capability
Legacy Capability
18AESA Synthetic Aperture Radar Targeting (U)
Target Confidence
SAR of Stationary Targets
19Ground Moving Target Indication
Moving Targets Overlaid on a Big SAR Map
(Reduced Resolution)
20Electro-Optical Targeting System
EO Targeting System
- Internally Mounted
- Long Range, High Resolution
- NAVFLIR, Targeting FLIR, IRST Functions
- Digital Continuous Zoom
21EOTS
22Distributed Aperture System
- Internally Mounted
- Missile Launch Detection
- Threat Aircraft Detection
- Track Wingman
- NAVFLIR Functions
- Integrated With HMD
23DAS and EOTS Complementary Targeting
DAS
24Crew Station
3-D Stereo Audio and
Wide FOV HMD with DAS Imagery
Enhanced Situation Awareness on Location of
Ground Forces
25Weapons Stations
11
Station
10
9
3
2
1
6
8
7
5
4
A/A
Store
A/A, A/S
A/A, A/S
A/A, A/S
A/A
A/S
A/A, A/S
A/A
A/A
A/A, A/S
A/A, A/S
300
Weight
2,500
5,000
1,000
2,500
350
350
2,500
5,000
2,500
300
- Over 18,000 Lbs Ordnance Capacity
- Nonpyrotechnic Suspension and Release
26Internal Weapons Load
SDB
SDB
AIM-120
AIM-120
- Stealth Weapons Configuration
- 8 Small Diameter Bombs
- 180 25mm
27Internal Weapons Load
28External Weapons Load
AIM-9X
SDB
Joint Common Missile
SDB
AIM-9X
Joint Common Missile
SDB
SDB
Missionized Gun
AIM-120
AIM-120
- 16 Small Diameter Bombs
- 4 Joint Common Missiles
- 220 25mm
Under Development
29Weapons Carriage Requirements
CTOL Internal Gun
Store Fully Certified During SDD
INTERNAL AND EXTERNAL WEAPONS
EXTERNAL WEAPONS
EXTERNAL WEAPONS
GBU-10 Paveway II 2,000-lb LGB (MK-84 Warhead)
GBU-32 JDAM 1,000-lb (MK-83/BLU-110 Warhead)
426 -Gallon Wing Tank
GBU-24A/B Paveway III 2,000-lb LGB (MK-84 /
BLU-109 Warhead)
GBU-12 Paveway II 500-lb LGB (MK-82 Warhead)
Stormshadow
GBU-16 Paveway II 1,000-lb LGB (MK-83 Warhead)
GBU-31 JDAM 2,000-lb (MK-84 Warhead)
MK-83 BLU-110 LDGP 1,000-lb LDGP
AGM-158 JASSM
AGM-154A/C JSOW Glide Bomb
MK-83 BSU-85 HDGP
MXU-648/CNU-88 Baggage Pod
GBU-38 JDAM 500-lb (MK-82 Warhead)
CBU-103/104/105 WCMD
MK-84 2,000-lb LD/HDGP
AIM-120C AMRAAM
Brimstone
MK-84 BSU-50 Ballute 2,000-lb HDGP
GBU-31 JDAM 2,000-lb (BLU-109 Warhead)
AIM-120B AMRAAM
AIM-120C AMRAAM
GBU-12 Paveway II 500-lb LGB (MK-82 Warhead)
AIM-132 ASRAAM
AIM-9X Sidewinder
Weapons Currently Under Development
BDU-57/58/60 Laser-Guided Training Round
MK-82 500-lb LD HD
Phase I SDB
UK 500 PGB
CBU-99/100 Rockeye II Cluster Munition
Brimstone/Joint Common Missile
Missionized Gun
042004 29 Precision Strike Association
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
30Envisioned Voice and Datalinks Interoperability
Link - 16 Aviation Air Defense Assets
Beyond Line of Sight
F/A-18
F-16
SATCOM
AWACs
Blue SAMs
E-2
Joint Tactical Radio System (JTRS) Functionality J
oint Variable Message Format JVMF
Intra/Inter-Flight Data Link
PHM Datalink
LHA/LHD
CV
Ground Forces
Air Base
Over 120 Information Exchange Requirements to
Ensure Interoperability Across US and Coalition
Forces
31JSF a Key Node in the System of Systems
- Identification/Surveillance
- Mark XII Transponder
- Mark XII Interrogator
- Data Communications
- Data Link
- UHF SATCOM
- Digital Battlefield
- JTCTS
- Voice Communications
- VHF Lo-FM (30-88 MHz)
- VHF AM (108-156 MHz)
- VHF Hi-FM (136-174 MHz)
- UHF AM (225-400 MHz)
- UHF FM (225-400 MHz)
- HAVEQUICK
- SATURN
- SINCGARS
- GUARD Monitor (243/121.5)
- KY-58 Secure Voice
- SATCOM Secure Voice
- 8.33 KHz Channelization
- Survival Radio Comm
- Data Message Formats
- TADIL-J
- JVMF / VMF (K-series)
- TADIL-C (partial)
- TACFIRE
- AFAPD
- Navigation/Landing Aids
- INS
- GPS
- Radar Altimeter
- ILS Marker Beacon
- ILS Glideslope
- ILS Localizer
- TACAN
- ICLS
- MLS
- JPALS
- Audio Functions
- Voice Messaging
- Voice Recognition (Support)
- Air Refuel Intercom (CTOL)
- Maintenance Intercom
- 3-D Audio
- Voice Synthesis
Over 120 Information Exchange Requirements to
Ensure Interoperability Across US and Coalition
Forces
32Block 0.1 MS Development
Photographs not Viewgraphs
Cockpit
- DMC BB Testing
- Escape System Sled
- Helmet Fit Check
- HMD Flight Evaluation
- Cockpit Mockup
CNI
Vehicle Management System
OTS CNI
- AIA
- Radios
- RALT
- ILS
- IFFT
- APU
- Antenna Switches
GPS
ICP
INS
GPIO
ICP
Displays and Controls
Fire Control
Common Components
FRIUs
- Pneumatic BRU
- with cover
- Proto FRIU
GPS
- 8Slot Integrated Rack
- PSA
- 6,000 Parts Delivered
INS
33Block 0.2 MS Development
MS First Flight Emerging!
ICP
- FRIU
- Fuselage Remote Interface Unit (FRIU)
- Weapons Mockup/Weapons Loading Evaluation
JDAM
AIM-120
INS
Radar Air Search SAR
MSIL CATB
ICP
Displays and Controls
Countermeasures
FRIUs
- EW
- Counter Measures Controller
- IRCM Dispenser
34Hardware Development Progress
3BSM Bearing 1 Actuator
Side View
Rear View
FETT in Afterburner
Side View
Static Inlet Model Ready to Test
35Hardware Development Progress
Fuel System Simulator - FSS
(PTMS) Turbomachine
Refused Takeoff Brake Testing
Nose Landing Gear Rough Cut Completed January 7,
2004
36PMM - Structures Machine
5 Axis Horizontal Mill
- OML Control Through Machining of Understructure
OML Surfaces - 5 Month Assy Span Enabler
37Automated Wing Carry Through Drilling System
- Single-Pass Drilling and Countersinking
- 5 Month Assembly Span Enabler
38Robotic Component Finishing System (RCFS)
- Automated Coating Application
- Minimizes Re-Work and Coating Weight 1 extra
mil 30lbs - Achieves Quality Through Automated Process
39Getting There
- Truly Expeditionary
- Worlds Most Versatile/Adaptable/Lean Fighter
Deployment Package - - Significantly Less Logistic Support
Required - -- Significantly Less Airlift Required
- 24 F-16 Package 13 C-17 (For Initial
30 Days) - 24 F-35 Package
-
Rapid Arrival of Airborne Fire Support with
Ground Forces
042004 39 Precision Strike Association
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
40JSF Autonomic Logistics System
Autonomic Logistics Provides Order Of Magnitude
OS Savings
41AL Accomplishments
- SEM
- Tool is Available
- Produces Analysis Products
- Maturation is Ongoing
- AutoLog Lab (ALL)
- 3 Labs Up and Running
- Located in FtW and Orlando
- Strategic Business
- Draft Strategic Plan
- Business Case Analysis
- Engine Integration
- Panel Fastener Count Reduced On Several Panels
- Maintainer Access Improved Through Redesign of
Several Access Panels
- Verification Planning
- 106 Direct JCS AL Rqmts
- 4 OEM Demo
- 45 MS
- 51 Lab Test/Demo
- 4 On A/C
- 2 Flt Test
- Depot Repairables
- Depot WG Established
- Depot Capability Design Demo
- Depot Architecture Review
- Depot Requirements Integration Planning
42JSF Transformational Capabilities
- Replacing Separate Service/Allied, Multi-Role
Combat Aircraft With a Joint Service, Coalition
System With the Following Capabilities - Long Range Stealth From Flexible Bases
- Multi-Spectral Sensor Suite to Find, Identify and
Target Moving/Relocatable Targets Through Adverse
Weather - Integration and Interoperability Adding to
Precision Strike - Radical Reductions in Support Requirements and
Ownership Costs
Transforming From Service-Focused Acquisition to
Joint/Coalition Acquisition
43Questions ?
042004 43 Precision Strike Association
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
44IAW RDML E email on Commanders Intent
VISION
BE THE MODEL ACQUISITION PROGRAM FOR JOINT
SERVICE AND INTERNATIONAL COOPERATION. DELIVER TO
OUR WAR FIGHTERS AN AFFORDABLE AND EFFECTIVE NEXT
GENERATION STRIKE FIGHTER WEAPON SYSTEM AND
SUSTAIN IT WORLDWIDE.
DISTRIBUTION STATEMENT A. Approved for public
release distribution is unlimited.
45Flexible Overhead Gantry (FOG) Machine
- F-35 OML Control Through Machining of IML
Surfaces (Laminate Thickness Control) - Fixed Skin and Removable Panel Thickness Control
- 5 Month Assembly Span Enabler
46Connector Light Array Designator System -
C.L.A.D.S.
- Improve Accuracy and Speed of Pinning Operations
- Reduce Assembly Span Time
- Improve Quality
CLADS
47Bulkhead Marking System
- Eliminate Assembly Templates
- Initial Cost Avoidance Through Elimination of
Assembly Tools - Machine Data Provided by Digital Thread
6 Axis Robot
48Automated FWD Fuselage Cockpit Side Panel
Drilling System
6 Axis Vertical Gantry Machine
- Single-Pass Drilling and Countersinking
- 5 Month Assembly Span Enabler