Electra Gold Ltd' TSXV:ELT - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Electra Gold Ltd' TSXV:ELT

Description:

Our vision is to build economic as well as ethical viability ... Kaolin. Cement. Companion Minerals. Limestone. Paper. Paint. Ceramics. Fine China. Apple Bay ... – PowerPoint PPT presentation

Number of Views:101
Avg rating:3.0/5.0
Slides: 21
Provided by: pauln4
Category:
Tags: elt | tsxv | electra | gold | kaolin | ltd

less

Transcript and Presenter's Notes

Title: Electra Gold Ltd' TSXV:ELT


1
Electra Gold Ltd. (TSX-VELT)
  • Presentation to Investors

2
  • Publicly traded mining Company
  • Based in Vancouver, British Colombia
  • Founded in 1978 Restructured resumed trading
    April 2003

3
The mission of Electra Gold is to explore,
develop and extract Earths mineral resources in
an ethical and sustainable manner.
4
Our vision is to build economic as well as
ethical viability for shareholders, stakeholders,
and the entire community .
5
Electra Gold - Active engagement in mining of
industrial minerals
Limestone
Zeolite
Chalky geyserite
Geyserite
Kaolinite
The market potential for industrial minerals
will outpace base metal mining within the next
5 years Industrial Mining magazine, May 2003
6
Industrial Minerals are Profitable.
  • Freeze on new US West coast mining permits
    combined with depletion of local resources
  • Potential for tax incentive programs (e.g.
    working with native communities)
  • Steady growth in demand from accessible markets
    (e.g. Washington, California)
  • Expanded range of uses for industrial minerals
    (e.g. paper, cosmetics, medicine)

7
The Electra Gold Team
Doug Stelling Chairman CEO
strong leadership and commitment.
Jo Shearer President
geologist with 30 years mineral mining
experience expertise.
8
The Electra Gold Team
Experts guiding the development
Cam Patterson Senior Hydrogeologist
Kevin Morin Acid rock drainage and leaching expert
Bill Milligan North Island Rock Pro. mining
contractor
Bruce Wright Biologist and environmental
consultant
9
Projected Production (Chalky Geyserite Tonnage)
10
Projected Production (Cheaper Unit Costs with
Volume)
Tonnage (000s)
Cost per tonne ()
11
Funding Goals (as Private Placements)
October 2003 - US500,000 June 2004 -
US2,000,000
12
Apple Bay
13
(No Transcript)
14
Apple Bay
15
Apple Bay
- A range of Products
Limestone
Gold
Copper
Chalky Geyserite
Cement
Base Metals
Geyserite
Kaolin
Paper Paint Ceramics Fine China
Companion Minerals
16
Apple Bay
  • Infrastructure
  • Ashgrove and Lehigh (formerly Tilbury) Cement
    have expended over 1 million in RD on the mine
    site
  • The Port Hardy area has established community,
    power, road system and other amenities
  • Established deep sea port facilities, including
    barge ship load out

17
Apple Bay
Our First Shipment!
18
Apple Bay
  • Tidewater Access
  • Able to move huge pieces of equipment without
    local assembly and disassembly
  • Lehigh is currently shipping silica sand all the
    way to Los Angeles, California from the B.C.
    coast
  • Pulp and paper mills on the B.C. coast are some
    of the potential Kaolinite customers

19
Apple Bay
  • Key Relationships
  • Operating in area for several years natural
    resources recognized as important to social and
    economic growth
  • Strong relations with local business and
    residents economic growth
  • Relations with the First Nations partnership,
    community development

20
  • Trading Symbol ELT (TSX-V)
  • 100-853 Richards St., Vancouver, B.C., Canada
  • V6B 3B4
  • Tel 604-647-2227
  • E-mail info_at_electragoldltd.com
  • Web www.electragoldltd.com
Write a Comment
User Comments (0)
About PowerShow.com