Title: Ultra High Performing HVAC OptimumLOOP


1
Ultra-efficient Chilled Water Plants for Shopping
Centers The International Council of Shopping
Centers Ben Erpelding, P.E.May 19, 2009
2
Chiller Plant miles per gallon
3
Chiller Plant miles per gallon
4
Package Unit 1.1 kW/ton (new) to 2.0 kW/ton (at
15 years) (2.6 kW/ton at 20 years)
5
Las Vegas Load Profile
6
Comfort Cooling Load Profiles
7
Shopping Mall Design Rules
  • All chilled water valves must be two-way and
    fully modulating (0-100).
  • Network chilled water valves to central plant
    control system.
  • Install variable frequency drives on all central
    plant chillers, towers and CHW CDW pumps.
  • Outside air lockout of chilled water plant (62 to
    64 deg F).  
  • All variable speed controls optimization
    sequences.
  • Sub metering and monitoring performance.

8
All Variable Speed Chiller Plants
9
Large Mall Central Plant (So. Ca)
  • 4,500,000 ton-hrs per year
  • Total central plant energy usage 5,660,000
    kWh/yr
  • Water usage 11,000,000 gal/yr
  • This equates to is a 1.23 kW/ton average central
    plant efficiency and 2.4 gal per ton-hr water
    usage. 
  • Post retrofit 0.53 kW/ton and 2.0 gal per
    ton-hr
  • 450,000/yr savings
  • 1.4 year payback (74 IRR)

10
Mall Central Plant (Midwest)
  • 607,000 kWh per yr savings
  • 273,000 gal per yr
  • 60,300/yr
  • 208,000 implementation cost 
  • 30,000 utility incentive
  • 2.7 yr simple payback
  • 33 IRR
  • 327,000 NPV

11
Mall Central Plant (New York)
  • 793,000 kWh per yr savings
  • 276,000 gal per yr
  • 149,000/yr
  • 475,000 implementation cost 
  • 135,000 utility incentive
  • 2.2 yr simple payback
  • 45 IRR
  • 681,000 NPV

12
Mall Central Plant (Florida)
  • 966,000 kWh per yr savings
  • 556,000 gal per yr
  • 123,900/yr
  • 493,000 implementation cost 
  • 0 utility incentive
  • 4.0 yr simple payback
  • 23 IRR
  • 342,000 NPV

13
Central Plant Utility Bills
14
Before and After Total Plant Energy Usage (kW)
15
DDC Performance Commissioning
16
Water Usage in Cooling Towers
17
  • Additional questions and comments
  • Utility incentives
  • Comfort and reliability
  • Demand Response
  • LEED Buildings
  • Maintaining energy savings over time
  • ContactBen Erpelding, P.E., C.E.M.
  • 619-417-9984
  • ben.erpelding_at_optimumenergyco.com
  • www.optimumenergyHVAC.com