Summary from RSVP Extinction Conference http:www'agsrhichome'bnl'govPeoplekbrownrsvpExtinction'html - PowerPoint PPT Presentation

About This Presentation
Title:

Summary from RSVP Extinction Conference http:www'agsrhichome'bnl'govPeoplekbrownrsvpExtinction'html

Description:

Overview of new guidelines and floor availability P.Pile ... C line and LESB III are seen as low priority options for beam development studies. ... – PowerPoint PPT presentation

Number of Views:72
Avg rating:3.0/5.0
Slides: 6
Provided by: CA65
Category:

less

Transcript and Presenter's Notes

Title: Summary from RSVP Extinction Conference http:www'agsrhichome'bnl'govPeoplekbrownrsvpExtinction'html


1
Summary from RSVP Extinction Conferencehttp//www
.agsrhichome.bnl.gov/People/kbrown/rsvp/Extinction
.html
  • Kevin Brown
  • kbrown_at_bnl.gov

2
Attendees
  • L.Ahrens
  • D.Beavis
  • A. Hatzikoutelis (VRVS)
  • K.Brown
  • I H. Chiang
  • I.Christidi
  • J.W.Glenn
  • J.Kotcher
  • L.Littenberg
  • A.Mincer
  • B.Morse
  • P.Pile
  • Y.Semertzidis
  • M.Sivertz
  • P.Yamin

3
Agenda (as followed)
  • Overview of new guidelines and floor availability
    P.Pile
  • Using B line for KOPIO measurements
    Dana Beavis
  • Some Comments on languange.
    K.Brown
  • KOPIO bunch width and extinction measurements
    M.Sivertz
  • Measuring extinction using Electo-Optical Effect
    Y. Semertzidis
  • Using C-Line for RSVP extinction measurements
    M.Sivertz, I Hung Chiang,
    A.Mincer
  • Pre-Extraction RSVP Extinction tests
    Woody Glenn

4
Summary
  • Participants agreed there is no longer any need
    for studies to be done in D line. D line can be
    removed immediately.
  • C line and LESB III are seen as low priority
    options for beam development studies. The
    preference is to have B line and A line ready in
    2008 as locations to dump beam and perform
    studies.
  • Action items
  • MECO Time distribution around bunch that is
    tolerable for extinction.
  • MECO change in sensitivity when running 1 bunch
    instead of 2 (note this option has a number of
    appealing features and has the potential of
    reducing construction costs).
  • RSVP language glossary KAB
  • RSVP Electro-Optical effect extinction monitor
    external for KOPIO, is it feasible? (perhaps
    with pulsed laser). Internal for MECO- details
    need work.
  • RSVP Both experiments need to define more
    clearly, and with some detail, what beam tests
    they need to do.

5
Pre-Extraction Measurements
  • This is a summary of Woodys talk, which focused
    on MECO measurements that can be done with either
    no extraction or at low intensity extraction.
  • Simulations! (true for both experiments)
  • need to simulate with large amplitude particles
    in Longitudinal phase space, to see what the
    effect of the very low synchrotron frequency
    particles will have.
  • simulate particles outside RF bucket and how
    they become populated
  • Observe how adjacent RF buckets get filled (in
    AGS Ring test)
  • Kick out individual bunches, and observe what
    is left over.
  • Use present AC-dipole to understand inter-bunch
    protons (what happens ?, how does the AC-dipole
    have to run, frequency sweep ?, etc. )
  • 8 GeV extraction spill structure. Could
    extract to a W-line type of dump with polarized
    proton intensities.
Write a Comment
User Comments (0)
About PowerShow.com