Description:

Installed new cable from AFE to sequence. Plugged gray cable to channel 4 (previously channel 3 was used ), so now VRB12 ... sdaq showing problems with 4B0-4B3 ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 8
Provided by: warc
Category:
Tags: 6a5 | channel | fi | july | sci

less

Transcript and Presenter's Notes

Title: 6A5 July 2


1
6A5 July 2
  • We did the following
  • Installed new cable from AFE to sequence
  • Plugged gray cable to channel 4 (previously
    channel 3 was used ), so now VRB12-channel3 is
    connected to sequencer15-channel4

2
4B problem 3-July-2003sdaq showing problems
with 4B0-4B3
3
4B problem 3-July-2003sdaq showing problems
with 4B0-4B3
4
4B problem 3-July-2003sdaq showing problems
with 4B0-4B3
5
4B problem 3-July-2003 Strange periodic
structure on 4B5 and 4B7
6
4B problem 3-July-2003 Strange periodic
structure on 4B5 and 4B7
7
4B problem 3-July-2003
  • Power-cycling get rids of the problem.