Title: Presentation on Integrating Management Systems
1- Presentation on Integrating Management Systems
www.imsrisksolutions.co.uk
2What is an Integrated Management System ?
- Derived from ISO 14001
- the organizational structure,
responsibilities, practices, processes and
resources for developing, implementing,
achieving, reviewing and maintaining the IMS
Policy
3Why Should There be an Integrated Management
System?
Need for a common system to ensure
- business focus
- common purpose
- simplicity of approach
- no duplication of formal systems
- minimal bureaucracy
- less risk of conflict
4Benefits of this IMS Approach
Provides a framework for a holistic management
system that can embrace all the processes and
elements that need to be controlled by the
organization.
5What Areas Does an Organization Need to Manage?
It depends on scope and nature of activities,
complexity and size but typically
- product/service realization
- customer satisfaction
- supply chain
- occupational health and safety
- environmental management
- security
- people issues
- finance
6Options Considered By ISO
7Integration or Alignment
CORE
CORE
CORE
CORE
E
OHS
Q
OHS
E
Q
8(No Transcript)
9(No Transcript)
10- Key Elements of
- ISO 90012000
11ISO 90012000
Main Elements
4 Quality Management System 5
Management Responsibility 6 Resource
Management 7 Product Realization
8 Measurement, Analysis and
Improvement
12Quality Management Process Model
Continual improvement of the quality management
system
Management responsibility
Customer
Customer
Satisfaction
Measurement, analysis and improvement
Resource Management
Requirements
output
input
Product realization
Product
13Process Approach
- For an organization to function effectively it
has to identify and manage numerous linked
activities
- An activity using resources, managed in order to
enable transformation of inputs into outputs, can
be considered as a process
- Often the output from one process forms part of
the input to another process
14Basic Process Model
MANAGEMENT
INPUT
OUTPUT
ACTIVITIES
ENABLERS
CUSTOMER SATISFACTION
15Requirements of - ISO 14001
Figure 1 from ISO 14001
Continual Improvement
Environmental Policy
Management Review
Planning
Checking Corrective Action
Implementation Operation
16Cradle to Grave
EMISSIONS
Extraction Transport Manufact. Delivery
Use Mainten. Disposal
Service
IMPACT WASTE
17IMS LA Issue 1. July 2001. Developed in
association with MacGregor Associates Ltd.
18(No Transcript)
19OHSAS 18001
?
This is a specification - a shall document
that is not a standard It is certifiable It is
not accredited All the major certification
bodies have adopted it and certification is going
ahead world-wide.
?
?
?
20OHSAS 18001
Continual Improvement
(Initial Status Review)
Management Review
OHS Policy
Checking Corrective Action
Planning
Implementation Operation
21Risk Assessment
Definition of Hazard - A source or a situation
with potential for harm in terms of human injury
or ill-health, damage to property, damage to the
environment, or a combination of
these. Definition of Risk - The combination of
the likelihood and consequences of a specified
hazardous event occurring.
22Definitions Hazard and Risk - OHSAS 18001
Within IMS Hazard Aspect Risk Impact
- Hazard - A source or a situation with a
potential for harm... - Risk - The combination of the likelihood and
consequence of a specified hazardous event
23In an Ideal World
Integrated Management Systems Standards would
- Be generically applicable world-wide
- Use the same definitions for similar terms
- Use a common methodology - where this is
possible
- Have a common architecture
- Allow a consistent auditing approach
- Facilitate ease of use for those adopting them
24ISO Guide 72 Approach
- Implementation and Operation
25(No Transcript)
26The Need for Integration Guidance
- Reactive to pro-active management
- Standards for OHS, quality environmental
management - contrast, e.g., risk management,
fire and security - Controversy
- Organizations should in any event now be
considering the development of an IMS
27The Case for an IMS
- Cost-effective facilitates decision-making
- More rewarding careers
- Objectives/processes of management systems very
similar - Avoidance of duplication
- Reduce chance of resolving one problem but
creating another - Easier development of Standard Operating
Procedures for OHS and Environment Protection
(EP)
28Policy
Top management should ensure that the stated
policy a) is appropriate to the organization b)
includes a commitment to comply with all relevant
requirements and continually to improve the
effectiveness of the management system c)
provides a framework for establishing and
reviewing objectives d) is communicated, where
appropriate, and is understood within the
organization, and e) is reviewed for continuing
suitability
29Planning
- Identification of aspects and risks
- Selection of significant aspects to be addressed
- Objectives and targets
- Identification of resources
- Identification of organizational structures,
roles, responsibilities and
authorities - Planning of operational control
- Contingency preparedness for foreseeable events
30Planning
Key areas of planning that are distinct
2.1 The organization should establish a process
for identifying those aspects of its operation
which need to be controlled and/or improved in
order to satisfy the relevant interested
party(ies). This includes research and
design Where appropriate, legal requirements
should be identified 2.2 The organization
should establish a process for prioritising its
aspects, so that those that would have a
significant impact are readily identified for
control measures where this is appropriate. 2.7 Th
e organization should establish and maintain a
process for identifying and responding to any
potential emergency situation. The process
should seek to prevent and mitigate the
consequences of any occurrence.
31Implementation and Operation
3.1 Operation 3.2 Management of Human
Resources 3.3 Management of other
resources 3.4 Documentation and its
control 3.5 Communication 3.6 Relationship with
suppliers/contractors
32Key Issues for the IMS to be Effective
- CONTROL - is there an adequate structure?
- CO-OPERATION - are there adequate arrangements?
- COMMUNICATIONS - are the arrangements effective?
- COMPETENCE - are the systems and competencies
available?
HSE - 1995
33Structure Responsibilities
- Clear definition of responsibilities
- include in job descriptions
- authority and resources
- arrangements accountability
- reporting arrangements clear and unambiguous
- where personal appraisal include IMS performance
- Senior managers should demonstrate commitment by
active involvement
34(No Transcript)
35Conclusion
- In considering a conclusion to the presentation
it became apparent that a closing argument for
integration isnt needed. - Integration clearly speaks for itself.
- To manage your organisational risks with a
resilient management system you must integrate.
36- The evidence from Corporate Europe today is
- Integration Resilience
www.imsrisksolutions.co.uk