SVSA Integration Challenges
  • On one typical platform there are
  • Well Test Separator
  • Gas Lift Manifold Valve Positioner
  • Pressure Instrument
  • RTD
  • Turbine Meters
  • Multi Variable Meters
  • Downhole Gauges
  • Multi-phase flow meters
  • Pressure Instrument
  • Electrical submersible pumps
  • Data needs to be gathered and transmitted to main
    platform
  • Remote control capability
  • Minimize Cabling (high cost and logistics).
  • Minimize use of solar panels (eliminate if
    possible)

2
SVSA Wireless Architecture is Critical for
Success
  • Cluster Architecture
  • On a single platform 18 monitoring units
    interfaced to various equipment creating a
    wireless mesh
  • Data from platform is captured in a single
    Gateway which transmits data to main platform.

To Main Platform
vMBus Interfaced to various instruments
vMBus Interfaced to Motor Operated Valves
3
SVSA Continuous Wellhead Data for
Real-TimeProduction Optimization
  • Wireless mesh system was installed
  • Providing continuous data.
  • Data is used for Production Optimization.

To Main Platform
vMBus Interfaced to various instruments
vMBus Interfaced to Motor Operated Valves
4
SVSA EP Data Integration
SVSA Headquarters
  • TOTALACCESS Provides Data Bridge to
  • Production Universe for Production Optimization
  • Foxboro DCS for Control
  • OSI PI Historian for Data Management

Production Universe
Thin-Client Over SVSA Intranet
5
Key Benefits to Shell Venezuela
  • Increase production (2-4) through
  • Reduced production deferment
  • Production optimization
  • Enhanced HSE standards Less trip to wells and
    platforms.

6
  • ADCO Abu Dhabi

7
ADCO Objectives
  • Prevent well shutdown which is impacting
    production by more than 7-10 annually.
  • Real-time operation monitoring from the office is
    critical.
  • Extending ESP life.
  • Control of pumps is essential for production
    optimization and pump life.

Remote Wells
GPRS Provider
ADCO Network
8
ADCO Challenges
  • Getting real-time data from high-value wells with
    Electrical Submersible pumps.
  • Integration with existing well Pump surface
    systems.
  • Wells are remote, distances are hundreds of
    Kilometers.
  • Radio technology was not adequate for bringing
    data from such far locations.
  • GPRS was a good option because of good coverage.

Electrical Submersible Pump Well Equipment from
Schlumberger
9
vMonitor ADCO Real-time Well Production
Monitoring and Control
  • vMonitor deployed real-time ESP well monitoring
    using GPRS technology.
  • Now wells can be monitored and controlled
    continuously.
  • Problems can be predicted well in advance.
  • Well shutdown can be reduced and even eliminated

10
ADCO Real-time Well Production Monitoring and
Control
Intranet Web-based Production Monitoring
vMonitor Data Acquisition With GPRS
ESP Surface System
ADCO HQ
ESP
GPRS Receiver
Well
11
Benefits to ADCO
  • Well shutdown being reduced by more than 50.
  • Timely production data and optimization.
  • Production increase to be realized is more than
    8.